Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

A Practical Method for Designing Vehicle Routing with Time Windows in Warehouse (정시배송체계의 실용적 설계를 위한 방법론)

  • Byeon, Eui-Seok
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.455-461
    • /
    • 2000
  • Logistics systems can be evaluated by how productively distribution center operates, how promptly transportation vehicle dispatches, how efficiently facility layout is, and so on. In this paper, a practical vehicle routing scheme with fixed delivery time and fixed vehicle routes is introduced. The method helps the distribution center reduce logistics cost with respect to dispatching vehicles, and satisfy the customer with pre-determined delivery time window constraints. A case study has shown that the proposed scheme not only generates a feasible schedule with time windows, but also balances material flow in warehouse.

  • PDF

Stochastic Time-Cost Tradeoff Using Genetic Algorithm

  • Lee, Hyung-Guk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.114-116
    • /
    • 2015
  • This paper presents a Stochastic Time-Cost Tradeoff analysis system (STCT) that identifies optimal construction methods for activities, hence reducing the project completion time and cost simultaneously. It makes use of schedule information obtained from critical path method (CPM), applies alternative construction methods data obtained from estimators to respective activities, computes an optimal set of genetic algorithm (GA) parameters, executes simulation based GA experiments, and identifies near optimal solution(s). A test case verifies the usability of STCT.

  • PDF

A Genetic Algorithm Based Task Scheduling for Cloud Computing with Fuzzy logic

  • Singh, Avtar;Dutta, Kamlesh
    • IEIE Transactions on Smart Processing and Computing
    • /
    • v.2 no.6
    • /
    • pp.367-372
    • /
    • 2013
  • Cloud computing technology has been developing at an increasing expansion rate. Today most of firms are using this technology, making improving the quality of service one of the most important issues. To achieve this, the system must operate efficiently with less idle time and without deteriorating the customer satisfaction. This paper focuses on enhancing the efficiency of a conventional Genetic Algorithm (GA) for task scheduling in cloud computing using Fuzzy Logic (FL). This study collected a group of task schedules and assessed the quality of each task schedule with the user expectation. The work iterates the best scheduling order genetic operations to make the optimal task schedule. General GA takes considerable time to find the correct scheduling order when all the fitness function parameters are the same. GA is an intuitive approach for solving problems because it covers all possible aspects of the problem. When this approach is combined with fuzzy logic (FL), it behaves like a human brain as a problem solver from an existing database (Memory). The present scheme compares GA with and without FL. Using FL, the proposed system at a 100, 400 and 1000 sample size*5 gave 70%, 57% and 47% better improvement in the task time compared to GA.

  • PDF

Design of Automated Negotiation Scheduling System for Medical Services (의료서비스를 위한 자동협상 스케줄링 시스템 설계)

  • Kim, Kyoung-Hwan
    • Journal of Internet Computing and Services
    • /
    • v.9 no.3
    • /
    • pp.59-67
    • /
    • 2008
  • New system solves scheduling problem in medical services. The existing scheduling system by FCFS is for a hospital but new system expresses the condition of a hospital and the profit of separate system's parties by the automated negotiation. This system expresses user preference time as a priority number and is designed that the schedule is changed according to the priority number with a negotiation strategy for a patient. And a hospital makes a schedule according to the policy. The system supports customer satisfaction in medical services by considering not only equipment efficiency but also the patent waiting time unlike the existing system considering the idle time for a equipment.

  • PDF

A Case Study for a Process/Layout Design of a Sikhye Production Line (식혜(食醯) 생산(生産)라인의 공정(工程)/배치(配置) 설계(設計)에 대한 사례 연구)

  • Yang, Moon-Hee
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.450-462
    • /
    • 2003
  • In this paper, we deal with a process and layout design for producing a planned amount of Sikhye in a given limited time period under a reasonable production schedule. We represent a Sikhye production line as a vector N, the element of which denotes the number of tanks required in each process and our objective is to find an appropriate vector which minimizes the total investment cost. We suggest a systematic method for finding an appropriate N and an appropriate layout to N. In detail, first, we decide the required sequence of processes and the required operations for each process and we estimate standard operating times. Second, constructing a precedence diagram, we find a critical path in order to reduce the total production lead time for a batch of Sikhye. Third, given a limited N space, we manage to construct manually each production schedule using both the processing times of the critical operations and transfer times. Finally, we find an optimal vector N which gives a minimum investment cost and meets both the time constraint and quantity constraint. In addition, with the estimated relative size of each tank, we suggest an appropriate conceptual layout design including an expansion area for future demands, based on the span technique used in the field of architectural design.

Fine Grain Real-Time Code Scheduling Using an Adaptive Genetic Algorithm (적합 유전자 알고리즘을 이용한 실시간 코드 스케쥴링)

  • Chung, Tai-Myoung
    • The Transactions of the Korea Information Processing Society
    • /
    • v.4 no.6
    • /
    • pp.1481-1494
    • /
    • 1997
  • In hard real-time systems, a timing fault may yield catastrophic results. Dynamic scheduling provides the flexibility to compensate for unexpected events at runtime; however, scheduling overhead at runtime is relatively large, constraining both the accuracy of the timing and the complexity of the scheduling analysis. In contrast, static scheduling need not have any runtime overhead. Thus, it has the potential to guarantee the precise time at which each instruction implementing a control action will execute. This paper presents a new approach to the problem of analyzing high-level language code, augmented by arbitrary before and after timing constraints, to provide a valid static schedule. Our technique is based on instruction-level complier code scheduling and timing analysis, and can ensure the timing of control operations to within a single instruction clock cycle. Because the search space for a valid static schedule is very large, a novel adaptive genetic search algorithm was developed.

  • PDF

Optimal Energy Consumption Scheduling in Smart-Grid Considering Storage Appliance : A Game-Theoretic Approach (스마트 그리드에 있어서 저장 장치를 고려한 최적 에너지 소비 스케줄링 : 게임 이론적 접근)

  • Yeo, Sangmin;Lee, Deok-Joo;Kim, Taegu;Oh, Hyung-Sik
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.41 no.5
    • /
    • pp.414-424
    • /
    • 2015
  • In this research, we consider a smart grid network of electricity with multiple consumers connected to a monopolistic provider. Each consumer can be informed the real time price changes through the smart meter and updates his consumption schedule to minimize the energy consumption expenditures by which the required power demand should be satisfied under the given real time pricing scheme. This real-time decision making problem has been recently studied through game-theoretic approach. The present paper contributes to the existing literature by incorporating storage appliance into the set of available household appliances which has somewhat distinctive functions compared to other types of appliances and would be regarded to play a significant role in energy consumption scheduling for the future smart grid. We propose a game-theoretic algorithm which could draw the optimal energy consumption scheduling for each household appliances including storage. Results on simulation data showed that the storage contributed to increase the efficiency of energy consumption pattern in the viewpoint of not only individual consumer but also whole system.

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.