• 제목/요약/키워드: time schedule

검색결과 1,360건 처리시간 0.029초

A Scheduling System for the Patient Treatment on a Heavy-ion Radiotherapy

  • Toyama, Hinako;Shibayama, Kouichi;Kanatsu, Syusuke;Kuroiwa, Toshitaka;Watanabe, Hideo;Wakaisami, Mitsuji;Tsuji, Hiroshi;Endo, Masahiro;Tsujii, Hirohiko
    • 한국의학물리학회:학술대회논문집
    • /
    • 한국의학물리학회 2002년도 Proceedings
    • /
    • pp.177-179
    • /
    • 2002
  • We have developed a scheduling system for heavy ion radiotherapy considering the condition of three treatment rooms and treatment planning for each patient. This system consists of a database (patient information, treatment method and machine schedule), a schedule for radiotherapy and WEB server. All operation of this system, such as data input, to change and to view the schedule, are performed by using a WEB browser. In order to protect personal information for the patients, access privilege to each information are limited by according to the occupational category. This system is connected with a hospital central information management system (AMIDAS) and an irradiation-managing computer for the heavy ion radiotherapy. A basic information for the patient is got from AMIDAS and the daily schedule sends to the treatment control computer at each treatment room through the irradiation-managing computer every morning. The daily, weekly, monthly schedules in the treatment room and the treatment condition of each patient are shared on the WEB browser with the all participants of the heavy ion therapy. This system could be useful to save a time to generate a treatment schedule and to inform us the most up-to-date treatment schedule and the related information at the same time.

  • PDF

동적 계획 알고리즘을 이용한 효과적인 케이블 드럼 스케줄 및 자동화 프로그램 구현 (Implementation of Automation Program and Efficient Cable Drum Schedule using Dynamic Programming Algorithm)

  • 박기홍;이양선
    • 디지털콘텐츠학회 논문지
    • /
    • 제17권4호
    • /
    • pp.257-263
    • /
    • 2016
  • 케이블 드럼 스케줄은 발전소 전기설비 설계를 위한 최종단계로 레이스웨이에 포설 계획된 케이블들을 효율적으로 케이블 드럼에 할당하는 것이다. 본 논문에서는 케이블들을 코드별로 케이블 드럼 용량에 맞게 스케줄링 하는 자동화 프로그램을 구현하였으며, 케이블 드럼 스케줄을 위한 최적화 문제를 효과적으로 해결하기 위해 동적 계획 알고리즘을 적용하였다. 구현 결과 케이블 드럼 스케줄 자동화는 설계 규격대로 수행됨을 확인할 수 있었고, 기존방법에서 발생되는 케이블 부족 및 낭비와 같은 오류를 제거 및 케이블 드럼 스케줄 소요시간을 줄일 수 있었다. 발전소 전기설비를 위한 케이블은 최소 2만개 이상으로 설계되기 때문에 제안하는 자동화 프로그램을 적용한다면 심각한 오류 없이 케이블 드럼 스케줄의 설계 소요시간을 현저히 줄일 수 있을 것으로 사료된다.

건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발 (Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site)

  • 진교홍;이혜원;김지홍
    • 한국정보통신학회논문지
    • /
    • 제8권1호
    • /
    • pp.192-199
    • /
    • 2004
  • 건설공사가 대형화, 복잡화 그리고 전문화 되어감에 따라 공사의 정보도 양적으로 팽창하고, 질적으로도 고도 전문화되어 가고 있으므로, 공정관리를 보다 효율적으로 관리하기 위한 전산시스템의 필요성이 대두되고 있다. 현재는 현장사무소에만 전산시스템을 도입하여 공정관리를 수행하고 있으며, 공정관리를 위한 데이터를 입력하고 확인하는 작업은 건설현장에서 현장사무소까지 직접 도보로 이동하여 처리하고 있다. 이에 따라 본 논문에서는 건설현장과 현장사무소를 이어주는 무선통신시스템을 구축하고, 건설현장에서 PDA를 이용하여 즉각적으로 본사의 데이터베이스에 공정데이터를 입력하고 확인할 수 있는 응용프로그램을 개발하였다. 이를 통해 기존의 건설현장에서 이루어지던 공정관리를 개선하여 인력, 장비, 시간, 비용 등을 절감할 수 있는 효과를 기대할 수 있다.

공정 그룹별 Start lag을 고려한 스케쥴링 (Scheduling with regard to start lag in process group)

  • 전태준;박성호
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 1996년도 추계학술대회발표논문집; 고려대학교, 서울; 26 Oct. 1996
    • /
    • pp.299-302
    • /
    • 1996
  • The purpose of this study is developing scheduling logic and program for machining scheduling of automobile part production line with unbalanced processing time. Three rules are developed to minimize slack and effect on other job. Fourth rule is suggested which considered weighted sum of three factors. schedule is generated totally 1, 000 times and then optimal weight parameter is selected. The program is developed to schedule situation to compare with the performance measure, total finish time of machine and total tardiness of part. As a result, the rule which considered weighted sum of three factors is effective for both measure.

  • PDF

생쥐 초기배아에서 세포질내 요인에 의한 유전자 발현과 형태형성의 조절

  • 이동률
    • 한국발생생물학회:학술대회논문집
    • /
    • 한국발생생물학회 1998년도 제4차 학술발표대회 및 정기총회
    • /
    • pp.63-65
    • /
    • 1998
  • 생쥐의 초기발생과정에서 배아 세포질의 제거로 nucleus/cytoplasm ratio를 증가시켰을 경우, 발생과 gene expression에는 영향을 미치지 않았으나 형태형성은 촉진되었다. 또, nucleus/cytoplasm ratio의 변화 없이 발생후기의 cytoplasm으로 일부 치환된 배아에서 발생과 gene expression, 형태형성은 모두 촉진되었다. 이상의 결과로 보아 초기배아의 gene expression과 형태형성과정에서 일어나는 time schedule의 조절은 nucleus/cytoplasm ratio가 직접적으로 영향을 미치지 않고 난자와 배아 내에 존재하는 cytoplasm factor에 의해 조절 받으며, 특히 형태 형성의 time schedule은 cytoplasmic factor와 이들에 의해 조절되는 물질의 상대적인 농도에 의해 조절될 것으로 여겨진다.

  • PDF

타임패트리 네트 UNFOLDING을 이용한 FMS의 스케줄링 분석 (A SCHEDULING ANALYSIS OF FMS USING TPN UNFOLDING)

  • 이종근
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.205-205
    • /
    • 2000
  • In this paper, we are proposed an analysis method of the operation schedule in FMS using Time Petri Nets(TPN) unfolding. TPN's unfolding is one of the analysis methods after changed non-cyclic net from the concurrent net without to expand the state explosion. We are illustrated this proposed to analyze a schedule problem in Ratio-driven FMS modeling.

  • PDF

AUTOMATED CONSTRUCTION PLANNING AND VISUALIZATION

  • M. Kataoka
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.61-68
    • /
    • 2007
  • There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.

  • PDF

주거건물의 냉방 부하 패턴에 따른 구체축열시스템 운전 방안 (Operating Mode of Thermally Activated Building System (TABS) for Residential Buildings According to their Cooling Load Profile)

  • 박상훈;여명석;유미혜;이유지;정웅준;김광우
    • 한국주거학회논문집
    • /
    • 제23권2호
    • /
    • pp.99-106
    • /
    • 2012
  • Compared to Packaged Terminal Air Conditioning Systems, Radiant Cooling Systems have the advantage of energy saving and thermal comfort. Thermally Activated Building System (TABS) is one of the radiant heating and cooling systems. The main difference between TABS and other radiant systems lies in the usage of the time-lag effect of storing heat energy in the concrete. Current energy usage in summer time is concentrated within a specific time by using Packaged Terminal Air-Conditioner (PTAC). Due to the time-lag effect of TABS, energy usage can be distributed to other time zones. To maximize this effect, it is important to determine the appropriate operating mode, which for TABS is dependent upon the cooling load generated by the occupancy schedule. In this study, occupancy schedules are determined for various residential types. The operating modes of TABS for these residential types are estimated by using a dynamic computational simulation method. The results indicate that the operating modes of TABS can be determined by residential type and occupancy schedule. The load handled ratio by TABS is set up differently according to the cooling load profile obtained from residential type and occupancy schedule. By using TABS, energy consumption could be reduced by 20% compared to PTAC.

화물열차 증편일정 결정모형 (Additional Freight Train Schedule Generation Model)

  • 김영훈;임석철
    • 한국산학기술학회논문지
    • /
    • 제15권6호
    • /
    • pp.3851-3857
    • /
    • 2014
  • 화물열차를 이용하는 화주의 화물열차 수요는 기간에 따라 변동성이 크나 화주의 요구에 따라 화물열차 스케줄을 조정하거나 증편하는 것은 상당한 시간이 소요된다. 그 이유는 해의 범위가 폭발적으로 증가하고 선로용량, 운영규정, 기존열차와의 경합 등을 고려해야하기 때문이다. 그러나 국내 철도 운영사에서 화물열차 증편일정 조정 업무는 지속적으로 발생하고 있으며, 담당자의 경험적인 역량으로 해결해 왔다. 본 논문에서는 증편되는 화물열차의 운행 가능성을 판단하고, 증편요청열차들이 기존 열차의 운행시간 지연을 최소로 하면서 가급적 많은 추가 스케줄을 생성할 수 있는 모형을 제시한다. 제시된 모형은 시공간 네트워크로 문제를 표현하고 다중상품 흐름문제로 모델링하여 열생성 기법으로 해를 구하였다. 제시된 모형으로 3가지 실험을 수행하였으며, 복잡한 문제의 경우에도 계산시간상 실용적임을 확인하였다.

정시성 확보를 위한 버스노선 당 적정 운행시간 산정 연구 (Study on the Optimum Route Travel Time for Bus to Improve Bus Schedule Reliability)

  • 김민주;이영인
    • 한국ITS학회 논문지
    • /
    • 제16권6호
    • /
    • pp.112-123
    • /
    • 2017
  • 정부의 대중교통활성화 정책과 이용자들의 승용차에서 버스나 지하철로의 수단 전환으로, 대중교통의 정확한 배차시간과 도착시간의 확보가 중요해졌다. 서울시에서 제공하는 버스운행관리시스템(BMS : Bus Management System) 자료를 이용하여, 실시간 버스위치, 배차간격, 운행이력 등의 정보를 알 수 있다. 본 연구에서는 BMS 자료를 이용하여 안전운행을 하면서 정시성도 확보할 수 있는 방안을 제안하고자 한다. 다른 연구와는 다르게, 버스 정류장 사이 구간을 5개의 지점과 6개의 시간으로 나누어, 각각의 시간을 BMS 자료를 이용하여 산정하였다. 또한, 각 시간에 영향을 주는 주된 원인을 살펴보고, 요소별 평균, 표준편차, 변동계수를 이용하여 정류장 별 정시성과 안전성, 이동성을 모두 확보한 버스 노선의 적정 운행시간을 제안하였다.