• Title/Summary/Keyword: time schedule

Search Result 1,354, Processing Time 0.025 seconds

Optimized Exposure-time Scheduling scheme for Implementation of the Photopolymer-based Multiview VHOE (포토폴리머 기반의 다시점 VHOE 광학판 구현을 위한 최적 노출시간 스케줄링 기법)

  • Kim, Seung-Cheol;Koo, Jung-Sik;Cho, Byung-Chul;Kim, Eun-Soo
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.04b
    • /
    • pp.132-135
    • /
    • 2002
  • In this paper, a new method to implement the photopolymer-based VHOE using the optimized exposure time schedule is proposed. The cumulative grating strength dependence on the exposure energy is mathematically modeled by using the fourth-order polynomial function and then using this model, the optimized exposure-time schedule of the photopolymer for recording the given multiple gratings is calculated.

  • PDF

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

A maximal-Flow Scheduling Using time Expanded Network in a track (시간 전개형 네트워크를 이용한 선로의 최대흐름 스케쥴링)

  • 이달상;김만식
    • Journal of Korean Society of Transportation
    • /
    • v.8 no.2
    • /
    • pp.67-75
    • /
    • 1990
  • This paper treats the problem to schedule for trains with how transit priority so as to maximizing the number that can be sent during given time periods without interfering with the fixed schedule for train with high transit priority in a track. We transform the this problem into Time Expanded Network without traverse time through application of Ford and Fulkerson Model and construct the Enumeration Algorithm for solutions using TENET Generator (TENETGEN). Finally, we compare our algorithm with Dinic's Maximal-Flow Algorithm and examine the avaliability of our procedures in personal computer.

  • PDF

A Method of Applying Work Relationships for a Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.31-39
    • /
    • 2010
  • As the linear scheduling method has been used since the Empire State Building linear schedule in 1929, it is being applied in various fields, such as construction and manufacturing. When addressing concurrent critical paths occurring in a linear construction schedule, empirical researches have stressed resource management, which should be applied for optimizing workflow, ensuring flexible work productivity and continuous resource allocation. However, work relationships have been usually overlooked in making the linear schedule from an existing network schedule. Therefore, this research analyzes the previous researches related to the linear scheduling model, and then proposes a method that can be applied for adopting the relationships of a network schedule to the linear schedule. To this end, this research considers the work relationships occurring in changing a network schedule into a linear schedule, and then confirms the activities movement phenomenon of linear schedule due to workspace change, such as physical floors change. As a result, this research can be used as a basic research in order to develop a system generating a linear schedule from a network schedule.

Effect of job satisfaction on turnover intention and intention to stay in dental hygienists (치과위생사의 직무만족이 이직의도와 근속의사에 미치는 영향)

  • Park, Ji-Hyeon;Cho, Young-Sik
    • Journal of Korean society of Dental Hygiene
    • /
    • v.20 no.1
    • /
    • pp.95-106
    • /
    • 2020
  • Objectives: This study was conducted to investigate the effects of dental hygienists' job satisfaction on turnover intention and intention to stay. Methods: A survey was conducted targeting 273 dental hygienists in dental clinics. The study data were u analyzed using PASW Statistics 20.0 Results: The level of job satisfaction of dental hygienists was 3.30±0.50, and the highest ranked item in the survey was 'I am satisfied with my relationships with patients' 3.72±0.73. Job satisfaction according to general characteristics showed significant differences in age, marriage, education, career, current work experience, position, and schedule for future turnover. The turnover intention according to general characteristics showed significant difference in age and schedule for future turnover. The intention to stay according to general characteristics showed significant differences in age, marriage, education, career, current work experience, number of dentists, number of dental hygienists, and schedule for future turnover. The factors affecting turnover intention were schedule for future turnover, income, co-worker relation and professional time, while those affecting intention to stay were overall professional satisfaction, co-worker relation, schedule for future turnover, professional time, income, number of dental hygienists, patient relations and current work experience. Conclusions: Job satisfaction factors that had a common effect on turnover intention and intention to stay were schedule for future turnover, income, co-worker relation and professional time. To reduce turnover and encourage longevity, adequate pay and positive interpersonal relationships are necessary.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Dongeui Visual-PERT/CPM for R&D Project Management (연구개발 프로젝트관리를 위한 시각화모델)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

Risk-averse Inventory Model under Fluctuating Purchase Prices (구매가격 변동시 위험을 고려한 재고모형)

  • Yoo, Seuck-Cheun;Park, Chan-Kyoo;Jung, Uk
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.4
    • /
    • pp.33-53
    • /
    • 2010
  • When purchase prices of a raw material fluctuate over time, the total purchasing cost is mainly affected by reordering time. Existing researches focus on deciding the right time when the demand for each period is replenished at the lowest cost. However, the decision is based on expected future prices which usually turn out to include some error. This discrepancy between expected prices and actual prices deteriorates the performance of inventory models dealing with fluctuating purchase prices. In this paper, we propose a new inventory model which incorporates not only cost but also risk into making up a replenishment schedule to meet each period's demand. For each replenishment schedule, the risk is defined to be the variance of its total cost. By introducing the risk into the objective function, the variability of the total cost can be mitigated, and eventually more stable replenishment schedule will be obtained. According to experimental results from crude oil inventory management, the proposed model showed better performance over other models in respect of variability and cost.

Maximal-Flow-Problem with transit priority in a track (통과 우선순위가 있는 선로의 최대 흐름문제)

  • 이달상;김만식
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.111-117
    • /
    • 1990
  • This paper treats the problem to schedule for train with low transit priority so as to maximizing the number that can be sent during given time without interfering with the fixed schedule for train with high transit priority in a track. We transform the this problem into Time-Expanded Network without traverse time through application of Ford-Fulkerson Model, develop a TENET GENerator(TENETGEN) and obtain the data of TENET using developed TENETGEN. Finally, we seek the optimal solution to these data with Dinic's Maximal-Flow Algorithm and examine the availability of our procedures in personal computer.

  • PDF

The effect of short and long duration sintering method on microstructure and flexural strength of zirconia (단시간과 장시간의 소결방법에 따른 지르코니아의 굴곡 강도와 미세구조의 변화)

  • Lee, Ha-Bin;Lee, Tae-Hee;Kim, Ji-Hwan
    • Journal of Technologic Dentistry
    • /
    • v.42 no.2
    • /
    • pp.73-79
    • /
    • 2020
  • Purpose: The aim of this study was to investigate the influence of short and long duration sintering on microstructure and flexural strength of zirconia. Methods: To conduct three-point bending test, Zirconia specimens are milled according to ISO 6872 guidelines(N=18, n=9 per group). Two specimens group(n=8) is sintered for 10 hours(Standard schedule) and 3 hours(Speed schedule) at the peak temperature of 1550℃ with silicon carbide sintering furnace. Flexural strength of specimens are measured by instron. After coating each specimen(n=1), microstructure of specimens is observed using Scanning Electron Microscope(SEM). T-test was utilized to statistically assess the data. Results: The mean and standard deviation value of the flexural strength for standard schedule group are 578.15±57.48Mpa, that of speed schedule are 465.9±62.34Mpa. T-test showed significant differences in flexural strength between two zirconia specimen group which applied standard schedule and speed schedule respectively(p<0.05). Conclusion: The result of this study showed that the increase in sintering time led to increased grain size, and also to a positive effect on the flexural strength.