• Title/Summary/Keyword: time schedule

Search Result 1,356, Processing Time 0.027 seconds

A Study on Traveling Schedule Guidance Method for Free Independent Traveler in Busan (개별 여행자를 위한 관광 순회 일정 안내 방법에 관한 연구 - 부산광역시를 사례지역으로 -)

  • Lee, Seong-Kyu;Kim, Young-Seup;Suh, Yong-Cheol
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.2
    • /
    • pp.133-145
    • /
    • 2010
  • Recently, due to advances in information technologies, the trend of tour types has been changing from package tour to independent tour. Independent tour is a tour which a traveler collect airplane ticket, travel destinations, sightseeing time, transport, lodging and plan traveling schedules by oneself. But the traveler has many difficulties for predicting tour schedules, due to lack of adequate information of travel destinations. In this study, traveling schedule prediction method which to minimize the cumulative fatigue of tourist for use of unnecessary transport is proposed using travelling salesman problem algorithm. It is considered moving time between sightseeing, sightseeing time on destination and traveling time for a day.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

Kiln Drying Schedule Modification for Pitch Pine Using Drying Resistance (리기다소나무의 건조저항(乾燥抵抗)을 이용한 건조(乾燥)스케쥴 개량(改良))

  • Lee, Kyung-Sub;Jung, Hee-Suk
    • Journal of the Korean Wood Science and Technology
    • /
    • v.16 no.2
    • /
    • pp.69-78
    • /
    • 1988
  • For the modification of kiln drying schedule, rela ons between drying resistance R and moisture content or drying times were found 2.5cm-and 5.0cm-thick pitch pine (Pinus rigida Mill.) board and dimension lumber by the conventional kiln drying schedule until the average moisture content was 10%. The results of this study were as follows. 1. Drying resistance increased curvilinearly as moisture content decreased, and was higher for dimension lumber than for board at a given moisture content. The relationships between drying resistance and moisture content for the conventional kiln drying schedule and thickness of lumber were 1) $R_{2.5}=6.795\times10^3M^{-1.27^{**}}$ for 2.5cm-thick board by the conventional kiln drying schedule. 3) $R_{5.0}=5.206\times10^4M^{-1.55^{**}}$ for 5.0cm-thick dimension lumber by the conventional kiln drying schedule. 2. As drying time increased, moisture content decreased and drying resistance increased at the same time. Gradient of slope for dimension lumber was gentler than board. 3. The predicted drying times to 10% moisture content with the conventional kiln drying schedule were a little shorter than actual drying times with relatively small error. 4. It is necessary for the conventional kiln drying schedule to be modified to provide the desired final moisture content at minimum drying time with no significant degrade under severe drying conditions. 5. The kiln factors for 2.5cm-thick board and 5.0cm-thick dimension lumber with the conventional kiln drying schedule were 1.112, 1.136, respectively.

  • PDF

Scheduling of a Casting Sequence Under Just-In-Time (JIT) Production (적시 생산 방식에서의 주조공정 스케줄링)

  • Park, Yong-Kuk;Yang, Jung-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.3
    • /
    • pp.40-48
    • /
    • 2009
  • In this article, scheduling of a casting sequence is studied in a casting foundry which must deliver products according to the Just-in-time(JIT) production policy of a customer. When a foundry manufactures a variety of casts with an identical alloy simultaneously, it frequently faces the task of production scheduling. An optimal casting schedule should be emphasized in order to maximize the production rate and raw material efficiency under the constraints of limited resources; melting furnaces and operation time for a casting machine. To solve this practical problem-fulfilling the objectives of casting the assigned mixed orders for the highest raw material efficiency in a way specified by the customer's JIT schedule, we implement simple integer programming. A simulation to solve a real production problem in a typical casting plant proves that the proposed method provides a feasible solution with a high accuracy for a complex, multi-variable and multi-constraint optimization problem. Employing this simple methodology, a casting foundry having an automated casting machine can produce a mixed order of casts with a maximum furnace utilization within the due date, and provide them according to their customer's JIT inventory policy.

A Case Study on the Improvement of General Hospital Outpatients Waiting Time using TOC Methodology (제약이론(TOC)을 이용한 종합병원 외래 환자 대기시간 개선에 대한 연구)

  • Park, Chan-Seok;Koh, Seok-Ha
    • Korea Journal of Hospital Management
    • /
    • v.16 no.1
    • /
    • pp.77-100
    • /
    • 2011
  • The purpose of this study is to the improvement of general hospital outpatients waiting time using Theory Of Constraints(TOC) methodology and to the development of a Reception Desk in general hospital. This study is to provide decision-making guidelines for hospital managers and to provide feedback for the efficiency of job process. The target people of the study are outpatients and Cashiers on Chungnam national university hospital in Daejeon. The methods of study are summarized as follows. First, The team managers from a Reception Desk group were appointed. This team managers have the adjustment authority to the Outpatients schedule of doctor and Cashier members. Second, The consolidation of the general Reception desk and special inspection the Reception Desk. A movement line and waiting time of patients were simple and fast to accept. As a result of study, it shows that the TOC is the method for a job process and waiting time improvement, patients' satisfaction increase and we need an objective measurement indexes in the medical treatment industry.

  • PDF

The Sixth-Grade Students' Conceptions of a Scientist's Time Use (초등학교 6학년생들의 과학자의 생활시간에 대한 인식)

  • Jang, Myoung-Duk;Lee, Myeong-Je
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.6
    • /
    • pp.1118-1130
    • /
    • 2004
  • This article aims to (a) investigate children's images of a scientist's life style by comparing children's drawings about a scientist's schedule with those about a company employee's schedule in a weekday and on Sunday; and (b) examine the usefulness of 'Drawing A Scientist's Schedule (DASS)' test as a new instrument of learners' conceptions of a scientist and his/her work. To do those, thirty sixth- grade children participated in this study. The children, 15 boys and 15 girls, were selected from a classroom of an elementary school located in Gongju city. The children's drawings were analyzed in conjunction with individual interviews. The interviews facilitated the clarification of any ambiguous attributes of the drawings by questioning after their completion. Several significant conclusions can be drawn from this work: First, the children conceived that a scientist has more mandatory time, and less necessary and leisure time than does a company employee. Interestingly, many children thought that a scientist has similar life style on Sunday to that in a weekday, unlike a company employee. Second, in case of necessary time use in a weekday and on Sunday, the difference between a scientist and a company employee results from their sleeping time. Also, the children showed more various conceptions of a scientist's sleeping time than those of a company employee's sleeping time. Third, in case of mandatory time use, the children conceived that a scientist spends more time for his/her occupational work and less time for his/her housework activities than does a company employee. Fourth, the children's drawings showed that there is difference between a scientist's and a company employee's leisure time use and activities. Finally, the DASS test indicated its possibility and usefulness as an instrument for investigating learners' images on a scientist and his/her work. The instrument exhibited several distinctive children's conceptions that is difficult in identifying by using the DAST, a popular instrument.

A Selected Multicast Polling Scheme for IEEE 802.11 Point Coordination Function

  • Lee Sang Don;Cho Chi Woo;Kim Kyung Jun;Kim Hyun Sook;Han Ki Jun
    • Proceedings of the IEEK Conference
    • /
    • 2004.08c
    • /
    • pp.536-539
    • /
    • 2004
  • IEEE 802.11 Point Coordination Function (PCF) mode is defined to support time bounded traffic, such as voice in wireless LANs. The poll scheduling plays an important role in IEEE 802.11 PCF mode operation. This paper proposed a Multicast Polling Scheme (MPC) to increase the performance of wireless LANs. Moreover, we proposed a polling schedule scheme for our proposed multi-poll to serve real-time traffic. The results show that the proposed mechanism is more efficient than the original IEEE 802.11 PCF.

  • PDF

A study on the genetic algorithms for the scheduling of parallel computation (병렬계산의 스케쥴링에 있어서 유전자알고리즘에 관한 연구)

  • 성기석;박지혁
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1997.10a
    • /
    • pp.166-169
    • /
    • 1997
  • For parallel processing, the compiler partitions a loaded program into a set of tasks and makes a schedule for the tasks that will minimize parallel processing time for the loaded program. Building an optimal schedule for a given set of partitioned tasks of a program has known to be NP-complete. In this paper we introduce a GA(Genetic Algorithm)-based scheduling method in which a chromosome consists of two parts of a string which decide the number and order of tasks on each processor. An additional computation is used for feasibility constraint in the chromosome. By granularity theory, a partitioned program is categorized into coarse-grain or fine-grain types. There exist good heuristic algorithms for coarse-grain type partitioning. We suggested another GA adaptive to the coarse-grain type partitioning. The infeasibility of chromosome is overcome by the encoding and operators. The number of processors are decided while the GA find the minimum parallel processing time.

  • PDF

Development of Integrated Simulator for AC Traction Power Supply System (윈도우즈 기반의 교류 전기철도 급전시스템 통합 시뮬레이터 개발)

  • Kim, Joo-Rak;Kim, Jung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.76-81
    • /
    • 2010
  • This paper describes the development of integrated simulator with GUI(Graphic User Interface) for traction power supply system. This simulator consists of a lot of calculation modules such as TPS, train time schedule, line constant, and power supply system analysis. Each module has input and output structure respectively. The algorithms of all modules have confirmed the validity to comparison with field test that is performed on both high speed railway line and conventional line.

Scheduling of Welding Robots for Shipyard Sub-assembly Process (조선 소조립 공정의 자동화를 위한 용접 로봇 스케줄링)

  • Kang, Jang-Ha;Park, Sung-Soo;Park, Kyung-Chul;Do, Ki-Sang
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.25 no.1
    • /
    • pp.21-34
    • /
    • 1999
  • We consider a scheduling problem arising in a shipyard subassembly welding process. There are four welding robots of gantry type, which perform the welding process for the subassemblies. Because the robots perform the welding operations at the same time, there is a possibility of collision between adjacent robots depending on the welding schedule. In this paper, we propose a heuristic method to find a welding schedule which does minimize the welding completion time while avoiding collision among the robots. The method consists of two phases: assignment and scheduling. In the assignment phase, we assign each welding line to a proper robot. In the scheduling phase, we determine the welding schedules for the robots so that collision is avoided. Computational experiences with the data which reflect the real situation are reported.

  • PDF