SIEMENS DCS 환경에서 화력발전소 성능감시 시스템 구현 (Implementation of Performance Monitoring System for Thermal Power Plant in SIEMENS DCS)

  • 김승민;문태선;조창호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.37-37
    • /
    • 2000
  • This paper introduces the Performance Monitoring System(PMS) in a thermal power plant. The purpose of the PMS is to offer the operator current performance information of plant which could be an index of plant status or information to improve plant efficiency. The PMS of Bukcheju thermal power plant unit #2&3 is implemented under the SIEMENS DCS which supplies about 150 function blocks for performance calculation and all measured signals. The performance of unit, boiler, turbines, feedwater heaters, condenser, airpreheaters, feedwater pumps will be monitored and updated for every 5 minutes in PMS of Bukcheju TPP.

  • PDF

Cyclic loading test of abnormal joints in SRC frame-bent main building structure

  • Wang, Bo;Cao, Guorong;Yang, Ke;Dai, Huijuan;Qin, Chaogang
    • Earthquakes and Structures
    • /
    • 제20권4호
    • /
    • pp.417-430
    • /
    • 2021
  • Due to functional requirements, SRC column-RC beam abnormal joints with characteristics of strong beam weak column, variable column section, unequal beam height and staggered height exist in the Steel reinforced concrete (SRC) frame-bent main building structure of thermal power plant (TPP). This paper presents the experimental results of these abnormal joints through cyclic loading tests on five specimens with scaling factor of 1/5. The staggered height and whether adding H-shaped steel in beam or not were changing parameters of specimens. The failure patterns, bearing capacity, energy dissipation and ductile performance were analyzed. In addition, the stress mechanism of the abnormal joint was discussed based on the diagonal strut model. The research results showed that the abnormal exterior joints occurred shear failure and column end hinge flexural failure; reducing beam height through adding H-shaped steel in the beam of abnormal exterior joint could improve the crack resistance and ductility; the abnormal interior joints with different staggered heights occurred column ends flexural failure; the joint with larger staggered height had the higher bearing capacity and stiffness, but lower ductility. The concrete compression strut mechanism is still applicable to the abnormal joints in TPP, but it is affected by the abnormal characteristics.

화력발전소 건설사업의 해양환경 환경영향평가 가이드라인(안) 연구 (A Study on Environmental Impact Assessment Guidelines for Marine Environments in Construction Projects of Thermal Power Plant)

  • 맹준호;김은영;강태순;손민호
    • 환경영향평가
    • /
    • 제26권1호
    • /
    • pp.78-92
    • /
    • 2017
  • 화력발전소 건설사업의 환경영향평가는 해당 사업으로 인해 주변 해양환경에 미치는 영향을 명확히 파악하고, 환경영향을 최소화함으로써 연안의 지속가능한 발전의 순기능을 담당하는데 있다. 이에 본 연구에서는 화력발전소 건설사업으로 인한 해양환경에 미치는 영향을 정확히 평가하고 이에 근거한 저감방안을 마련하기 위하여 화력발전소에 특화된 환경영향평가 가이드라인(안)을 마련하고자 하였다. 환경부, 산업통상자원부, 화력발전소 공기업 5사 담당자 및 해양물리, 해양동 식물 관련 전문가로 구성된 포럼을 통해 과학적이고 효율적인 해양환경 환경영향평가 가이드라인을 제시하였으며, 최근 7년간(2009년~2015년) 접수된 화력발전소 환경영향평가서 15개를 분석하여 해양환경 항목의 문제점을 도출하고, 환경영향평가서 작성규정, 국내 및 국외 환경조사 가이드라인, 화력발전소 환경영향평가 검토의견 등 광범위한 정보 수집을 시행하였다. 이 내용을 토대로 해양물리, 해양동 식물 관련 환경영향평가 가이드라인(안)을 마련하였다.

Seismic analysis of RC tubular columns in air-cooled supporting structure of TPP

  • Wang, Bo;Yang, Ke;Dai, Huijuan;Bai, Guoliang;Qin, Chaogang
    • Earthquakes and Structures
    • /
    • 제18권5호
    • /
    • pp.581-598
    • /
    • 2020
  • This paper aims to investigate the seismic behavior and influence parameters of the large-scaled thin-walled reinforced concrete (RC) tubular columns in air-cooled supporting structures of thermal power plants (TPPs). Cyclic loading tests and finite element analysis were performed on 1/8-scaled specimens considering the influence of wall diameter ratio, axial compression ratio, longitudinal reinforcement ratio, stirrup reinforcement ratio and adding steel diagonal braces (SDBs). The research results showed that the cracks mainly occurred on the lower half part of RC tubular columns during the cyclic loading test; the specimen with the minimum wall diameter ratio presented the earlier cracking and had the most cracks; the failure mode of RC tubular columns was large bias compression failure; increasing the axial compression ratio could increase the lateral bearing capacity and energy dissipation capacity, but also weaken the ductility and aggravate the lateral stiffness deterioration; increasing the longitudinal reinforcement ratio could efficiently enhance the seismic behavior; increasing the stirrup reinforcement ratio was favorable to the ductility; RC tubular columns with SDBs had a much higher bearing capacity and lateral stiffness than those without SDBs, and with the decrease of the angle between columns and SDBs, both bearing capacity and lateral stiffness increased significantly.

Bagged Auto-Associative Kernel Regression-Based Fault Detection and Identification Approach for Steam Boilers in Thermal Power Plants

  • Yu, Jungwon;Jang, Jaeyel;Yoo, Jaeyeong;Park, June Ho;Kim, Sungshin
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1406-1416
    • /
    • 2017
  • In complex and large-scale industries, properly designed fault detection and identification (FDI) systems considerably improve safety, reliability and availability of target processes. In thermal power plants (TPPs), generating units operate under very dangerous conditions; system failures can cause severe loss of life and property. In this paper, we propose a bagged auto-associative kernel regression (AAKR)-based FDI approach for steam boilers in TPPs. AAKR estimates new query vectors by online local modeling, and is suitable for TPPs operating under various load levels. By combining the bagging method, more stable and reliable estimations can be achieved, since the effects of random fluctuations decrease because of ensemble averaging. To validate performance, the proposed method and comparison methods (i.e., a clustering-based method and principal component analysis) are applied to failure data due to water wall tube leakage gathered from a 250 MW coal-fired TPP. Experimental results show that the proposed method fulfills reasonable false alarm rates and, at the same time, achieves better fault detection performance than the comparison methods. After performing fault detection, contribution analysis is carried out to identify fault variables; this helps operators to confirm the types of faults and efficiently take preventive actions.

소수력 발전소 건설에 의한 삼천포 화력발전소 방류수로 흐름변화 예측 (Prediction of the Flow Pattern Changes using FLOW-3D Model in the Effluent Region of the Samcheonpo Thermal Power Plant (TPP))

  • 조홍연;정신택;김정대;강금석
    • 한국해안해양공학회지
    • /
    • 제18권4호
    • /
    • pp.338-347
    • /
    • 2006
  • 삼천포 화력발전소에서는 냉각수로 이용되고 방류되는 해수를 이용한 소수력 발전소가 건설되고 있다. 소수력 발전소는 발전량을 최대화하기 위해서는 규모를 크게 하는 것이 바람직하나, 소수력 발전소가 방류수로의 기능을 저해하지는 않는 범위에서 결정하여야 하기 때문에 적정규모를 결정하기 위해서는 수리학적인 고려가 필요하다. 본 연구에서는 현재 방류수로의 흐름특성 자료를 이용하여 3차원 흐름모형인 FLOW3D모형을 구축하고, 구축된 모형을 이용하여 소수력 발전소의 규모에 따른 방류수로 상류 지점의 수위 증가 양상을 예측하였으며, 발전소 건설에 따른 흐름변화 양상도 분석하였다 삼천포 소수력발전소 건설은 상류의 수위증가를 유발하며, 설계유량 156톤/초, 발전소 가동보 높이 3.8 m 기준에 대한 방류수로 Weir 상류지점의 수위는 4.97 m로 현 상태 4.32 m 보다 65 cm 정도 증가하는 것으로 파악되었다.

삼천포 화력발전소 방류수로 및 방류해역의 흐름 관측 및 특성분석 (Flow Measurement and Characteristic Analysis in the Effluent Regions of the Samcheonpo Thermal Power Plant(TPP))

  • 조홍연;정신택;강금석
    • 한국해안해양공학회지
    • /
    • 제18권4호
    • /
    • pp.329-337
    • /
    • 2006
  • 삼천포 화력발전소에서 냉각수로 이용되고 방류되는 해수를 이용한 소수력 발전소가 삼천포 해역에 건설되고 있다. 본 연구에서는 소수력 발전소가 건설되는 지점, 즉 방류수로 및 방류해역의 흐름을 관측하고 흐름특성을 분석하였다. 방류수로의 흐름은 냉각수 방류량에 의한 영향이 지배적이며, 공간적으로는 냉각수가 합류되는 Weir 상류구간, 합류된 냉각수가 방류수로를 통하여 배출되는 Weir 하류구간, 방류해역으로 구분할 수 있다. Weir 상류 지점은 측면에서 유입되는 냉각수로 인하여 유량이 점차 증가하나, 수로의 폭이 증가하기 때문에 수위 변화가 미미한 지역이며, Weir 하류지점은 월류된 냉각수가 사류(super-critical flow)구간을 거쳐서 수리학적 도약으로 인한 강한 연직방향의 요동을 보이며 방류해역으로 이동하는 구간이다. 한편, 방류수에 의한 영향으로 외해방향으로의 해수흐름이 형성되나 유속은 조위의 승강운동에 크게 영향을 받는 것으로 파악되었다. 또한, 방류해역의 조위는 통영 검조소에 비하여 평균조차는 약 10% 크게 나타나고 있으며, 파랑전파에 의한 영향은 미미한 정도로 파악되었다.

$621^{\circ}C$급 화력발전용 소재 실기규모 Mock-up품 구조용접부 특성평가 (Characteristic Evaluation of mock-up Structural Welding between casting and pipe for USC TPP)

  • 이명열;지병하;송근호;김정태
    • 대한용접접합학회:학술대회논문집
    • /
    • 대한용접접합학회 2007년 추계학술발표대회 개요집
    • /
    • pp.39-41
    • /
    • 2007
  • In this study, actual scale welding were conducted at the USC thermal power plant turbine and main steam pipe casting candidate mock up material 9Cr-1.5Mo-CoVNbNB steel(CB2) and 9Cr-0.5Mo-MVNbN steel(P92). And to evaluate the welding process for the actual production, mechanical property testes were conducted for the weld metal. The Mock-up welding condition successfully led to an excellent structural welding joint between casting and pipe material.

  • PDF

Kalina 사이클의 효율 향상 방안 및 성능 비교 (Improvement of Efficiency of Kalina Cycle and Performance Comparison)

  • 윤정인;손창효;최광환;손창민;설성훈;이호생;김현주
    • 한국태양에너지학회 논문집
    • /
    • 제35권5호
    • /
    • pp.11-19
    • /
    • 2015
  • In this paper, EP-Kalina cycle applying liquid-vapor ejector and motive pump is newly proposed. In this EP-Kalina cycle, the liquid-vapor ejector is used to increase pressure difference between inlet and outlet of the turbine. Also the motive pump enhances the performance of liquid-vapor ejector, resulting in increase of system efficiency of OTEC cycles. The comparison cycles in this study are basic, Kalina, EKalina and EP-Kalina ones. The pump work, net power, APRe, APRc, TPP and system efficiency of each cycle are compared. In case of net power, EP-Kalina cycle is lowest among the cycles due to the application of the motive pump. But, the net power difference of cycles seems to be minor since the pump work of cycles is merely about 1kW, compared to turbine gross power of 20kW. The system efficiency of EP-Kalina cycle shows 3.22%, relatively 44% higher than that of basic OTEC cycle. Therefore, the system efficiency is increased by applying the liquid-vapor ejector and the motive pump. Additional performance analysis is necessary to optimize the proposed EP-Kalina cycle.

마할라노비스 거리를 이용한 증기보일러 튜브의 고장탐지방법 (Fault Detection Method for Steam Boiler Tube Using Mahalanobis Distance)

  • 유정원;장재열;유재영;김성신
    • 한국지능시스템학회논문지
    • /
    • 제26권3호
    • /
    • pp.246-252
    • /
    • 2016
  • 화력발전소의 설비들은 매우 높은 온도와 압력의 환경에서 운전되므로, 설비고장은 상당한 인적 물적 손실로 이어진다. 그러므로 발전설비의 비정상정인 동작 상태를 사전에 확인할 수 있는 고장탐지 시스템이 필수적이다. 본 연구에서는, 화력발전소 증기보일러의 고장탐지를 위해서 마할라노비스 거리(Mahalanobis distance, MD)를 이용하였다. MD 기반의 고장탐지방법에서는, 비정상샘플은 정상샘플들로부터 멀리 떨어져 있다고 가정한다. 정상상태로 동작중인 대상시스템으로부터 수집된 다변량 샘플을 이용하여 평균벡터와 공분산행렬을 계산하고, MD값의 문턱값을 설정한다. 검증단계에서는, 평균벡터와 검증샘플들 간의 MD를 구한 후, 계산된 MD 값이 미리 설정된 문턱값보다 높으면 알람신호가 발생하게 된다. MD 기반의 고장탐지방법의 성능을 검증하기 위해서, 200MW 유연탄 화력발전소의 증기보일러 튜브누설로 인해서 발전정지 된 사례를 사용하였다. 실험결과는 MD 기반의 고장탐지기법이 발전정지가 발생하기 이전의 이상징후를 성공적으로 탐지할 수 있음을 보여준다.