The Development of Simulation Model for Calculating Hoisting Time of Double-Cage Construction Lift in Supertall Building Construction (Double-Cage 건설용 리프트의 양중시간 산정을 위한 시뮬레이션 모델 개발)
-
- Proceedings of the Korean Institute of Building Construction Conference
- /
- 2016.05a
- /
- pp.64-65
- /
- 2016