• Title/Summary/Keyword: the constraint method

Search Result 1,684, Processing Time 0.033 seconds

Location Analysis for Developing Small Hydropower Using Geo-Spatial Information System (지형공간정보체계를 활용한 소수력 개발의 입지분석)

  • Yi, Choong-Sung;Kim, Kil-Ho;Lee, Jin-Hee;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.12
    • /
    • pp.985-994
    • /
    • 2007
  • Small hydropower is the one of the cleanest one among new and renewable energy with less green house gas emissions. Recently, the necessity of developing small hydropower is emerging since its remaining potential resources in this country are abundant. However, a survey or research on the small hydropower development has been hardly performed since the 1990#s. These circumstances encourages a systematic approach for the small hydropower development. The purpose of this study is to propose a methodology of the location analysis for developing small hydropower. To this end, constraint and location criteria with weights are established and quantification method of each factor is presented. Especially, the analysis procedure is established on the basis of GSIS. Also the study focus on raising the objectivity and precision of analysis by developing system model with automatic search. The proposed methodology is applied to Bochung stream in Keum Riverbasin. The result selects the four and two locations of dam type and run-of-river type respectively. This study will be beneficial to the future activation of small hydropower development as a fundamental work.

An Application of loop-loop EM Method for Geotechnical Survey (지반조사를 위한 loop-loop 전자탐사 기법의 적용)

  • You Jin-Sang;Song Yoonho;Seo1 Soon-Jee;Song Young-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.4 no.2
    • /
    • pp.25-33
    • /
    • 2001
  • Loop-loop electromagnetic (EM) survey in frequency domain has been carried out in order to provide basic solution to geotechnical applications. Source and receiver configuration may be horizontal co-planar (HCP) and/or vertical co-planar (VCP). Three quadrature components of mutual impedance ratio for each configuration are used to construct the subsurface image. For the purpose of obtaining the model response and validating the reasonable performance of the inversion, we obtained each responses of two-layered and three-layered earth models and two-dimensional (2-D) isolated anomalous body. The response of 2-D isolated anomalous body has been calculated using extended Born approximation for the solution of 2.5-D integral equation describing EM scattering problem. As a result of the least-squares inversion with variable Lagrangian multiplier, we could construct more resolvable image from HCP data than VCP data. Furthermore, joint inversion of HCP and VCP data made better stability and resolution of the inversion. Resistivity values, however, did not exactly match the true ones. Loop-loop EM field data was obtained with EM34-3XL system manufactured by Geonics Ltd. (Canada). Electrical resistivity survey was conducted on the same line for the comparison in advance. Since the constructed image from loop-loop EM data by 2-D inversion algorithm showed almost similar resistivity distribution to that from electrical resistivity one, we expect the developed 2.5-D loop-loop EM inversion program can be applied for the reconnaissance site survey.

  • PDF

A New Clock Routing Algorithm for High Performance ICs (고성능 집적회로 설계를 위한 새로운 클락 배선)

  • 유광기;정정화
    • Journal of the Korean Institute of Telematics and Electronics C
    • /
    • v.36C no.11
    • /
    • pp.64-74
    • /
    • 1999
  • A new clock skew optimization for clock routing using link-edge insertion is proposed in this paper. It satisfies the given skew bound and prevent the total wire length from increasing. As the clock skew is the major constraint for high speed synchronous ICs, it must be minimized in order to obtain high performance. But clock skew minimization can increase total wire length, therefore clock routing is performed within the given skew bound which can not induce the malfunction. Clock routing under the specified skew bound can decrease total wire length Not only total wire length and delay time minimization algorithm using merging point relocation method but also clock skew reduction algorithm using link-edge insertion technique between two nodes whose delay difference is large is proposed. The proposed algorithm construct a new clock routing topology which is generalized graph model while previous methods uses only tree-structured routing topology. A new cost function is designed in order to select two nodes which constitute link-edge. Using this cost function, delay difference or clock skew is reduced by connecting two nodes whose delay difference is large and distance difference is short. Furthermore, routing topology construction and wire sizing algorithm is developed to reduce clock delay. The proposed algorithm is implemented in C programming language. From the experimental results, we can get the delay reduction under the given skew bound.

  • PDF

Optimum Drying Conditions of On-Farm Red Pepper Dryer (고추건조기의 최적운전조건)

  • Lee, Dong-Sun;Keum, Dong-Hyuk;Park, Noh-Hyun;Park, Mu-Hyun
    • Korean Journal of Food Science and Technology
    • /
    • v.21 no.5
    • /
    • pp.676-685
    • /
    • 1989
  • Optimal operating conditions of on-farm red pepper dryer were searched by using the simulation-optimization algorithm combining the drying and quality deterioration models of red pepper with Box's complex method. Determination of control variables such as air temperature, air recycle ratio and air flow rate was based on a criterion of minimizing energy consumption under the constrainst conditions that satisfied the specified color retention of carotenoids. As quality constraint was stricter, energy consumption increased and total drying time decreased with lower recycle ratio and higher air flow rate Product mixing during drying was found to be able to improve the energy efficiency and product quality. Currently used air flow rate was assessed to be increased for the optimal operation. Two stage drying at the fixed optimal air flow rate was proven to be useful means for further saying of energy consumption. In the optimal bistaged drying, the second stage began at about one third of the total drying time and low air temperature in the first stage Increased to a high value and air recycle ratio increased slightly in the second stage. Optimal control variable scheme could be explained by the dryer performance and the carotenoids destruction kinetics in red pepper drying.

  • PDF

Design of Synchronous 256-bit OTP Memory (동기식 256-bit OTP 메모리 설계)

  • Li, Long-Zhen;Kim, Tae-Hoon;Shim, Oe-Yong;Park, Mu-Hun;Ha, Pan-Bong;Kim, Young-Hee
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.7
    • /
    • pp.1227-1234
    • /
    • 2008
  • In this paper is designed a 256-bit synchronous OTP(one-time programmable) memory required in application fields such as automobile appliance power ICs, display ICs, and CMOS image sensors. A 256-bit synchronous memory cell consists of NMOS capacitor as antifuse and access transistor without a high-voltage blocking transistor. A gate bias voltage circuit for the additional blocking transistor is removed since logic supply voltage VDD(=1.5V) and external program voltage VPPE(=5.5V) are used instead of conventional three supply voltages. And loading current of cell to be programmed increases according to RON(on resistance) of the antifuse and process variation in case of the voltage driving without current constraint in programming. Therefore, there is a problem that program voltage can be increased relatively due to resistive voltage drop on supply voltage VPP. And so loading current can be made to flow constantly by using the current driving method instead of the voltage driving counterpart in programming. Therefore, program voltage VPP can be lowered from 5.9V to 5.5V when measurement is done on the manufactured wafer. And the sens amplifier circuit is simplified by using the sens amplifier of clocked inverter type instead of the conventional current sent amplifier. The synchronous OTP of 256 bits is designed with Magnachip $0.13{\mu}m$ CMOS process. The layout area if $298.4{\times}314{\mu}m2$.

Exception based Dynamic Service Coordination Framework for Web Services (웹 서비스를 위한 예외 상황 기반 동적 서비스 연결 프레임워크)

  • Han Dong-Soo;Lee Sung-Doke;Jung Jong-Ha
    • Journal of KIISE:Software and Applications
    • /
    • v.33 no.8
    • /
    • pp.668-680
    • /
    • 2006
  • Web services on the Internet are not always reliable in terms of service availability and performance. Dynamic service coordination capability of a system or an application invoking Web services is essential to cope with such unreliable situations. In dynamic service coordination, if a Web service does not respond within a specific time constraint, it is replaced with another Web service at run time for reliable invocation of Web services. In this paper, we develop an exception based dynamic service coordination framework for Web services. In the framework, all necessary information for dynamic service coordination is explicitly specified and summarized as a set of attributes. Then classes and workflows, supporting dynamic service coordination and invoking Web services, are automatically created based on these attributes. Developers of Web services client programs can make the invocations of Web services reliable by calling the methods of the classes. Some performance loss has been observed in the indirect invocation of a Web service. However, when we consider the flexibility and reliability gained from the method, the performance loss would be acceptable in many cases.

Optimal Design of Deep-Sea Pressure Hulls using CAE tools (CAE 기법을 활용한 심해 내압구조물의 최적설계에 관한 연구)

  • Jeong, Han Koo;Henry, Panganiban
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.6
    • /
    • pp.477-485
    • /
    • 2012
  • Geometric configurations such as hull shape, wall thickness, stiffener layout, and type of construction materials are the key factors influencing the structural performance of pressure hulls. Traditional theoretical approach provides quick and acceptable solutions for the design of pressure hulls within specific geometric configuration and material. In this paper, alternative approaches that can be used to obtain optimal geometric shape, wall thickness, construction material configuration and stiffener layout of a pressure hull are presented. CAE(Computer Aided Engineering) based design optimization tools are utilized in order to obtain the required structural responses and optimal design parameters. Optimal elliptical meridional profile is determined for a cylindrical pressure hull design using metamodel-based optimization technique implemented in a fully-integrated parametric modeler-CAE platform in ANSYS. While the optimal composite laminate layup and the design of ring stiffener for a thin-walled pressure hull are obtained using gradient-based optimization method in OptiStruct. It is noted that the proposed alternative approaches are potentially effective for pressure hull design.

A Method for Protein Functional Flow Configuration and Validation (단백질 기능 흐름 모델 구성 및 평가 기법)

  • Jang, Woo-Hyuk;Jung, Suk-Hoon;Han, Dong-Soo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.15 no.4
    • /
    • pp.284-288
    • /
    • 2009
  • With explosively growing PPI databases, the computational approach for a prediction and configuration of PPI network has been a big stream in the bioinformatics area. Recent researches gradually consider physicochemical properties of proteins and support high resolution results with integration of experimental results. With regard to current research trend, it is very close future to complete a PPI network configuration of each organism. However, direct applying the PPI network to real field is complicated problem because PPI network is only a set of co-expressive proteins or gene products, and its network link means simple physical binding rather than in-depth knowledge of biological process. In this paper, we suggest a protein functional flow model which is a directed network based on a protein functions' relation of signaling transduction pathway. The vertex of the suggested model is a molecular function annotated by gene ontology, and the relations among the vertex are considered as edges. Thus, it is easy to trace a specific function's transition, and it can be a constraint to extract a meaningful sub-path from whole PPI network. To evaluate the model, 11 functional flow models of Homo sapiens were built from KEGG, and Cronbach's alpha values were measured (alpha=0.67). Among 1023 functional flows, 765 functional flows showed 0.6 or higher alpha values.

Optimum Design of Two Hinged Steel Arches with I Sectional Type (SUMT법(法)에 의(依)한 2골절(滑節) I형(形) 강재(鋼材) 아치의 최적설계(最適設計))

  • Jung, Young Chae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.65-79
    • /
    • 1992
  • This study is concerned with the optimal design of two hinged steel arches with I cross sectional type and aimed at the exact analysis of the arches and the safe and economic design of structure. The analyzing method of arches which introduces the finite difference method considering the displacements of structure in analyzing process is used to eliminate the error of analysis and to determine the sectional force of structure. The optimizing problems of arches formulate with the objective functions and the constraints which take the sectional dimensions(B, D, $t_f$, $t_w$) as the design variables. The object functions are formulated as the total weight of arch and the constraints are derived by using the criteria with respect to the working stress, the minimum dimension of flange and web based on the part of steel bridge in the Korea standard code of road bridge and including the economic depth constraint of the I sectional type, the upper limit dimension of the depth of web and the lower limit dimension of the breadth of flange. The SUMT method using the modified Newton Raphson direction method is introduced to solve the formulated nonlinear programming problems which developed in this study and tested out throught the numerical examples. The developed optimal design programming of arch is tested out and examined throught the numerical examples for the various arches. And their results are compared and analyzed to examine the possibility of optimization, the applicablity, the convergency of this algorithm and with the results of numerical examples using the reference(30). The correlative equations between the optimal sectional areas and inertia moments are introduced from the various numerical optimal design results in this study.

  • PDF

Prediction of Expected Residual Useful Life of Rubble-Mound Breakwaters Using Stochastic Gamma Process (추계학적 감마 확률과정을 이용한 경사제의 기대 잔류유효수명 예측)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.31 no.3
    • /
    • pp.158-169
    • /
    • 2019
  • A probabilistic model that can predict the residual useful lifetime of structure is formulated by using the gamma process which is one of the stochastic processes. The formulated stochastic model can take into account both the sampling uncertainty associated with damages measured up to now and the temporal uncertainty of cumulative damage over time. A method estimating several parameters of stochastic model is additionally proposed by introducing of the least square method and the method of moments, so that the age of a structure, the operational environment, and the evolution of damage with time can be considered. Some features related to the residual useful lifetime are firstly investigated into through the sensitivity analysis on parameters under a simple setting of single damage data measured at the current age. The stochastic model are then applied to the rubble-mound breakwater straightforwardly. The parameters of gamma process can be estimated for several experimental data on the damage processes of armor rocks of rubble-mound breakwater. The expected damage levels over time, which are numerically simulated with the estimated parameters, are in very good agreement with those from the flume testing. It has been found from various numerical calculations that the probabilities exceeding the failure limit are converged to the constraint that the model must be satisfied after lasting for a long time from now. Meanwhile, the expected residual useful lifetimes evaluated from the failure probabilities are seen to be different with respect to the behavior of damage history. As the coefficient of variation of cumulative damage is becoming large, in particular, it has been shown that the expected residual useful lifetimes have significant discrepancies from those of the deterministic regression model. This is mainly due to the effect of sampling and temporal uncertainties associated with damage, by which the first time to failure tends to be widely distributed. Therefore, the stochastic model presented in this paper for predicting the residual useful lifetime of structure can properly implement the probabilistic assessment on current damage state of structure as well as take account of the temporal uncertainty of future cumulative damage.