• Title/Summary/Keyword: the bidding process

Search Result 119, Processing Time 0.027 seconds

The Research About Suitability of The Cost of Work According to The Alteration of Design Literature (설계도서 변경에 의한 실 공사비의 책정에 관한 연구)

  • Im, Chil-Soon;Lee, Gyu-Chel
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.3
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

Status and Response Strategies of Carbon Labeling in Landscape Architecture (조경분야 탄소성적표지제도 적용실태 및 대응전략)

  • Kim, Jeong-Ho;Yoon, Yong-Han
    • Journal of Environmental Science International
    • /
    • v.24 no.6
    • /
    • pp.709-720
    • /
    • 2015
  • After analyzing the actual acquisition status of carbon labeling by year and by product for the past four years, as well as its certification in the construction-related sectors of greenhouse gas emission, this study attempted to present the problems and coping strategies upon issuing the carbon labeling certification in the landscape architecture. During the period of this analysis, the carbon labelings were acquired by 134 enterprises, 267 workplaces, and 735 products, while the percentage of acquisition was highest in the regular non-durable goods(49%), followed by energy-consuming durable goods(26%), regular production goods (19%), regular durable goods(3%), and service(3%). Furthermore, the acquisition certifications in construction sectors, were highest in the various pipes/panel(8 cases), followed by concrete(6 cases), gypsum board(4 cases), and landscape architecture materials(2 cases). The landscape architecture only had two cases in the acquisition certification for the first time in 2012, which accounted for 0.27% of the entire certification products, due to the uncertainty in the process, the lack of professionalism, and the lack of comprehension. However, the study conducted on the coping strategies for carbon labeling in the landscape architecture revealed the following: (1) regular reporting system management through the division of labor in the head office and factories, (2) the building of objective DB through the adoption of data management programs such as SAP, (3) continuous promotion and vitalization of the incentive system, (4) the adoption of mandatory or preferential application system in landscaping projects, management, and bidding, (5) enhancement of elasticity in deliberation of certification by recruiting experts in the landscape architecture sectors, and (6) provision of incentives for the cooperative firms acquiring the certification and support for their participation.

A Case of Evaluation of the G2B System by Analysing Operational DB Data (DB운영 데이터 분석을 통한 G2B 시스템 평가 사례)

  • Lim, Gyoo-Gun;Lee, Dae-Chul
    • Journal of Information Technology Services
    • /
    • v.11 no.2
    • /
    • pp.243-258
    • /
    • 2012
  • The G2B system is one of the important information systems in the e-government implementation. It is difficult to measure the cost reduction effect of the system introduction because there are many participants in the complex procurement processes. Previous approaches of the performance evaluation of such processes have been based on conducting some surveys and interviews with statistical methods. Therefore there have been some limitations in the verification of feasibility. Therefore this study tries to suggest a case of performance evaluation about the cost reduction in using of the G2B system by analyzing operational DB data from the G2B system. This study analyzed the procurement processes of G2B system according to 'goods' and 'facilities/services' and classified the procurement processes into 12 sub-processes. By developing an evaluation model for the cost reduction of e-procurement, we derived the whole cost reduction effect was 8,000 billon Won for the use of Korea KONEPS G2B system in 2008. Specially the cost reduction in the private sector was 6,600 billion Won. It was mainly due to the decrease of the offline visits to the related organizations to participate a bidding process. Moreover, the cost reduction of using shopping mall was 1,000 billion Won among the total 1,400 billion Won in the whole public sector. The main contribution of this paper is to show the more objective evaluation result of the use of e-procurement, which verifies the necessity of G2B system.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Uncertainty Factors affecting Bid Price from Pre-bid Clarification Document of Transport Construction Projects

  • Jang, YeEun;Kim, HaYoung;Yi, June-Seong;Lee, Bum-Sik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.238-244
    • /
    • 2022
  • Civil projects are associated with many uncertainties because they involve a long duration, many resources, a large area, and many supply chains. Therefore, the price of a civil project is not simply proportional to the quantity and unit price of the item but has a variable value, including uncertainty risk. This study investigates the influence of the uncertainty factors in the pre-bid clarification document on bid price formation during the project bidding phase. To this end, civil projects from the California Department of Transportation (Caltrans) were used as research data. This study randomly selected fifty sample data from each of twelve counties from 2008-to 2020: six hundred. The authors observed that each project sample had 0 to n query cases due to uncertainty. Then, this study examined the project uncertainty cases and categorized them into the following four uncertainty factors: 'conflict' (UF1), 'impossibility' (UF2), 'lack' (UF3), and 'missing' (UF4). Under the extracting process, the cases are classified into four uncertainty factors. With the project not containing any uncertainty factors as a control group, the project containing these uncertainty factors was designated as an experimental group. After comparing the bidder's price, the experimental group's bid price was higher than the control group's. This result suggests that uncertainty factors in bid documents induce bidders to set a high bid price as a defense against uncertainty.

  • PDF

A Mobile Multimedia Auction System (모바일 멀티미디어 경매 시스템)

  • Ahn, Hoo-Young;Ryu, Ki-Young;Park, Young-Ho;Ha, Sun-Tae
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.13 no.5
    • /
    • pp.320-332
    • /
    • 2007
  • Recently, new interests on digital contents and UCC(User Created Content)s are growing fast through the development of internet. However, there have been many side-effects on those interests. The representative problems are perversing illegal copies and the distributions for personal valuable digital contents to unauthorized anonymous users. These decrease creation of good digital contents by interfering with the growth of information technology industry and the content provider#s creative will. To resolve these problems, in the paper, we propose a novel auction system for multimedia contents and bidding processes. The system applies the concept of used goods onto digital contents. Especially, the auction system is based on mobile environment. Finally, the performance evaluation shows that those main auction process algorithms indicate the time complexity of logarithm scale for insertions and searches. Therefore, the performance of the system is not significantly influenced by the amount of contents even though the volume of contents in the system is increasing.

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

A Study on the Satisfaction Level of the National Defense Electronic Procurement System Service by Applying the SERVQUAL Model (SERVQUAL 모형을 적용한 국방전자조달 서비스에 대한 만족도 분석)

  • Min, Wonbae;Kang, Seokjoong;Lee, Bumkoo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.2
    • /
    • pp.488-495
    • /
    • 2014
  • The national defense electronic procurement system is an information system supporting DAPA, services (Army, Navy and Air Force), and the procurement companies in the electronic bidding. It has contributed greatly to improving the efficiency of the national defense electronic procurement process by providing various information services based on inter-operation among the related parties. However the national defense electronic procurement system is expected to be upgraded to the next version in accord with rapidly evolving infrastructure based on high technology and increasing various communication channels. This paper investigates the satisfaction level of the system users and proposes directions for the next-generation procurement portal.

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

Design and Implementation of Intelligent Agent based Margin Push Multi-agent System for Internet Auction (인터넷 경매를 위한 지능형 에이전트 기반 마진 푸쉬 멀티에이전트 시스템 설계 및 구현)

  • Lee, Geun-Wang;Kim, Jeong-Jae;Lee, Jong-Hui;O, Hae-Seok
    • The KIPS Transactions:PartD
    • /
    • v.9D no.1
    • /
    • pp.167-172
    • /
    • 2002
  • Recently, some of people are keep in research and development of the further more efficient and convenient auction systems using intelligent software agents in electronic commerce. The purpose of this thesis is that a simple auction system has web bulletin boards, is aided by intelligent agent, and generates pertinent auction duration time and starting price for auction goods of auctioneer into a auction system, then the auctioneer gets the highest margin. The seller who want to sell goods, is using internet sends mail that has information for goods to agent of internet auction system. The agent undertake filtering process for already learned information about similar goods. And it calculate duration time and start price from stored bidding history database. In this thesis we propose a mailing agent system pushing information in internet auction that enables to aid decision for auctioneer about the starting time and price which delivers the highest margin.