• Title/Summary/Keyword: test pile

Search Result 1,139, Processing Time 0.024 seconds

A case study on the evaluation of pile damage during driving by PDA testing. (PDA 시험을 이용한 말뚝손상 판단에 관한 사례 연구)

  • 송명준;박영호;이영남
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.334-341
    • /
    • 2002
  • Nowadays, owing to the development of analysis techniques for PDA test, we can evaluate the serious damage of pile during driving in site. In this study, we checked the damage of pile by pulling it out after evaluation of the pile damage during driving by PDA testing. After that, almost damaged pile was checked and the outline depth of damage could be verified. To increase the quality of driven pile, we have to increase the number of PDA testing for drivability analysis with checking the damage especially for preliminary pile driving and dynamic load test for checking the bearing capacity and consider the application of driving by energy monitoring.

  • PDF

A Case Study of High Capacity Bi-Directional High Pressure Pile Load Test (초고용량 양방향 말뚝재하시험(BDH PLT) 수행사례 분석)

  • Kim, Sang-Il;Lee, Min-Hee;Jeong, Sung-Min;Jeong, Eun-Taeg;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1156-1163
    • /
    • 2010
  • The bi-directional high pile load test(BDH PLT) does not have weaknesses found in the existing bi-directional low pile load test(BDL PLT); it has strong economics, is unbound by load capacity limit and secures quality stability of working piles. In this study, Verification the field found a very high capacity level of stability and reliability of the BDH PLT, as well as outstanding field applicability. Field verifications reaffirmed the advantage of the BDH PLT device, which was capable of loading 90 MN capacities as maximum. It was also found to be durable enough to load high capacity with ease.

  • PDF

INVESTIGATION OF THE PILE MOVEMENT DUE TO TUNNELLING BY MODEL TEST AND NUMERICAL ANALYSIS

  • Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09c
    • /
    • pp.104-110
    • /
    • 2010
  • In this study, a series of two-dimensional model test and numerical analysis was carried out to investigate the pile movement due to tunnelling in soft ground. The model test consists of 21 cases according to locations of the pile tip over the centre position of model tunnel. To identify both the pile and ground movements a close-range photogrammetric technique was adopted in the model test. The results from the model test were compared to the two-dimensional finite element analysis using the CRISP program. It was found that the rotation point on the pile was significantly affected by factors such as the offset distance from the model tunnel and the volume loss that occurred during the tunnelling operation.

  • PDF

Simple Pile Loading Test(SPLT) Technique, Principle and Application (간편한 말뚝 재하시험(SPLT)의 개요와 적용)

  • 이명환;이장덕
    • Geotechnical Engineering
    • /
    • v.6 no.4
    • /
    • pp.53-64
    • /
    • 1990
  • There have been numerous methods proposed to predict the pile bearing capacity, but except for the prediction by the pile loading test, not one method is suitable to give a reliable result. Even so, the pile loading test has seldom been performed due to the time and money consuming procedures. In this research, a new way of carrying out the pile loading test, "Simple Pile Loading Test(SPLT)" is introduced. In SPLT technique, the test pile is designed to have a separable shoe with a reduced sized sliding core, so that the skin friction acts as the reaction force to cause the pile tip settlement. Therefore the preparation, installation, loading and unloading of the loading frames and the kentledge can be eliminated.liminated.

  • PDF

Bearing capacity Calculation of Displacement in-situ Concrete Pile (비배토 현장타설 콘크리트 말뚝의 지지력 산정에 관한 연구)

  • 박종배;박태순
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03a
    • /
    • pp.65-84
    • /
    • 2000
  • Europe and US which have more restrictive regulations than Korea about the noise and vibration during construction are using Auger-cast Pile to reduce the problem relating with noise and vibration. However Auger-cast Pile has problems like difficult quality control and low bearing capacity. In Europe, Displacement in-situ concrete Pile has been used to sove that problems since 1990s, and Korea has performed the test construction in 1997 and it has been used as the real structural foundation since 1998. Test and real construction results verified that the allowable capacity of the pile(diameter = 410mm) is between 70 and 100ton. Though De Beer & Van Imps design method utilizing CPT result is used to calculate the bearing capacity of the Displacement in-situ Pile, Korea is dependant upon the SPT as the sounding test, so design method utilizing SPT result is necessary to promote the application of the pile. To find out reasonable design method using SPT result, rearing capacity of the pile constructed in sand and clay in Korea was calculated using Meyerhof, SPT-CPT translation method, Nordlund, Douglas and DM-7 method, and the calculation results were compared to the load test result. Analysis result shows that SPT-CPT translation method is more reliable than others and economical design can be possible because it considers efficiently the friction capacity of Displacement in-situ Pile.

  • PDF

Reliability Updates of Driven Piles Using Proof Pile Load Test Results (검증용 정재하시험 자료를 이용한 항타강관말뚝의 신뢰성 평가)

  • Park, Jae-Hyun;Kim, Dong-Wook;Kwak, Ki-Seok;Chung, Moon-Kyung;Kim, Jun-Young;Chung, Choong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.324-337
    • /
    • 2010
  • For the development of load and resistance factor design, reliability analysis is required to calibrate resistance factors in the framework of reliability theory. The distribution of measured-to-predicted pile resistance ratio was constructed based on only the results of load tests conducted to failure for the assessment of uncertainty regarding pile resistance and used in the conventional reliability analysis. In other words, successful pile load test (piles resisted twice their design loads without failure) results were discarded, and therefore, were not reflected in the reliability analysis. In this paper, a new systematic method based on Bayesian theory is used to update reliability index of driven steel pile piles by adding more pile load test results, even not conducted to failure, into the prior distribution of pile resistance ratio. Fifty seven static pile load tests performed to failure in Korea were compiled for the construction of prior distribution of pile resistance ratio. Reliability analyses were performed using the updated distribution of pile resistance ratio and the total load distribution using First-order Reliability Method (FORM). The challenge of this study is that the distribution updates of pile resistance ratio are possible using the load test results even not conducted to failure, and that Bayesian update are most effective when limited data are available for reliability analysis or resistance factors calibration.

  • PDF

Analysis of Dynamic Behavior of Pile Driving (타입말뚝의 동적거동 분석)

  • 조천환;이명환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.11a
    • /
    • pp.27-52
    • /
    • 2002
  • Pile driving formula, wave equation analysis of pile driving(WEAP) and dynamic pile loading test have been known to useful tools to appraise the behaviour of pile driving. This paper reviews basic theories of three methods and gives some suggestions to apply them to practice. And also some cases on application of the methods to the sites are discussed in this paper. It appears that it is inevitable for engineers to be experienced well so that the methods can be regarded as useful tools.

  • PDF

Axial Load Transfer Behavior of a Large Diameter Pile socketed into weathered rock (풍화암 소켓 대구경말뚝의 축하중 전이거동)

  • 정창규;임태경;황근배;최용규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.390-397
    • /
    • 2002
  • In this study, static pile load tests with load transfer measurement for a pile socketed into weathered rocks were performed. Axial load transfers during static pile load test were measured and analyzed. Three large diameter piles socketed into weathered rock were behavior behaved as friction pile.

  • PDF

The Behavior of Axial Load Transfer for S.L. Coated Pile And Uncoated Pile (S.L. 도포 및 미도포 말뚝의 축하중전이거동)

  • 배기열;김정환;이민희;최용규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.373-380
    • /
    • 2002
  • In this study, In order to compare the behavior of axail load transfer for S.L. coated piles and uncoated piles installed at a field test site. During static pile load tests, axial load transfer for S.L. coated piles and uncoated piles were measured.

  • PDF

Analytical Study on the Pullout Resistance Characteristics of Bored Pile (매입말뚝의 인발저항특성에 관한 연구)

  • Park, Jong-Bae;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.7 no.4
    • /
    • pp.281-289
    • /
    • 2016
  • Structural experiment result showed that PHC(d=600mm) Pile used as a common compression member could resist 83.6 ~ 91.6 tonf of ultimate tension force, if the adhesion of P.C. bar of PHC pile to the concrete foundation is strengthened. Considering a proper safety factor to ultimate tension strength, PHC pile can substitute the anti-floating anchor, or reduce the number of anchors. For this purpose, pullout resistance behavior of a Bored pile embedded in real ground as well as structural tension strength of PHC pile must be evaluated. This study performed the static pullout tests to evaluate the pullout behavior of bored pile, and compared the test results with design value of side resistance. To evaluate the pullout resistance easily, static pullout test results were compared with dynamic loading test results using PDA. As a result, cement paste of the bored pile was hardened which is after 15 days, LH side resistance design value corresponded well to the Static pullout test results, also to the side resistance evaluated by dynamic loading test.