• Title/Summary/Keyword: temporary retaining structures

Search Result 30, Processing Time 0.026 seconds

SOME PROBLEMS IN DESIGN AND CONSTRUCTION OF TEMPORARY RETAINING STRUCTURES

  • Chung, Hyung-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.87-96
    • /
    • 1990
  • Even though the number of construction cases of temporary retaining structures in urban area are increasing, there still are many problems to be solved in design and construction of temporary retaining structures. In this paper the current design methods are reviewed and their problems are analyzed. Some critical mistakes made by site technicians and engineers are also discussed.

  • PDF

A study on the Remote Control System for Measuring Gradient of temporary earth retaining structure (흙막이 가시설 구조물의 무선원격계측관리시스템에 관한 연구)

  • Woo, Jong-Yeol;Hong, Seong-Wook;Kim, Sang-Won;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.49-52
    • /
    • 2011
  • This study concerned with the retention structures or inverted temporary building for displacement measurement in the underground soil after drilling a vertical tilt sensor attached to the vertical distance required to maintain a real-time measurement and management in order to install the wireless measuring devices installed in the field through remote control and management program for the safety of retaining structures temporary building be found on the internet in real time temporary building the retention is to develop a safety management system. And based on this technology to monitor the future status of the various structures possible to add a variety of sensors and Life Cycle Prediction of the structure and needs to evolve into intelligent systems and wireless networks using wireless communications infrastructure systems based on expanding domestic market penetration by developing instrumentation pioneer in overseas markets as well as the activation can also be judged.

  • PDF

Case Studies on Ground Improvement by High Pressure Jet Grouting(II) Effect on the Ground Reinforcement and Cut off of Ground Water Behind Temporary Retaining Walls (고압분사주입공법에 의한 지반개량사례연구(II) -흙막이벽 배면지반보강 및 차수효과)

  • Yun, Jung-Man;Hong, Won-Pyo;Jeong, Hyeong-Yong
    • Geotechnical Engineering
    • /
    • v.12 no.5
    • /
    • pp.5-16
    • /
    • 1996
  • When braced excavation with temporary retaining wall installation, is performed in loose sand with high ground water level boiling may be induced and considerable damage on the excavation works and structures in the vicinity can take place. Recently, for the purpose of reinforcement of ground and cut-off of ground water behind the temporary retaining wall, high pressure jet grouting is widely used. The purpose of this paper is to investigate the effects of jet grouting on ground reinforcement and cut -off of the ground water behind temporary retaining walls for braced excavation. A series of both laboratory and field tests has been performed. The test results show that high pressure jet grouting has sufficient effects on reinforcement of stiffness of ground and retaining wall. The permeability of the improved ground was 10-f_ 10-3cm l s smaller than those of the original ground. Therefore, the effect on cut off of ground water behind temporary retaining walls could be improved by high pressure jet grouting method.

  • PDF

A Study on the Strength Enhancement of Wale in Temporary Retaining Structures (흙막이 지하 가시설 구조체의 띠장 휨 강성 증대를 위한 연구)

  • Lim, Dong Hwan;Lee, Yong Jun;Ahn, Sang Ro
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3C
    • /
    • pp.91-96
    • /
    • 2009
  • The purpose of this study was to investigate a method for the strength enhancement of wale in temporary retaining structures. Tests on the wale structures strengthened with carbon fibre reinforced plastic (CFRP) strips and prestressed with seven wire strands were conducted. From this test, it is found that the flexural stiffness and strength of the wales strengthened with CFRP strips and seven wire strands were significantly improved compared to the unstrengthened one. The ultimate tensile strains of attached CFRP strips on the steel beam were in the range of 8,000 and $11,000{\mu}{\epsilon}$, and it is noticed that the bonding ability with steel and CFRP strips is good. In this paper, a new method for enhancing the strength of wale in retaining structures is suggested.

Study on the Safety Assurance for the Temporary Structures (가설구조물 안전성 확보 방안 연구)

  • Lee, Jung Seok;Moon, Seong Oh;Youn, Ye Bin;Lim, Nam Gi;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.73-80
    • /
    • 2018
  • According to the statistics publication of KOSHA, more than half of serious accidents at the construction sites were related to the temporary works and/or the temporary structures such as scaffoldings, shores, earth retaining walls, etc. The structural failures are occurred because of the overload acting on the structures or lack of performance of the one or more members of the structures. For the prevention of the collapse accidents relating to the temporary structures at the construction sites, we have to control construction processes not to occur the overload and also to control the performance and quality of each member of the temporary structures. MOLIT has amended the "Construction Technology Promotion Act" on Jan. 7th, 2015 to ensure the structural safety of the temporary structures. According to the Act, the designers of the construction design projects should check the structural integrity of the structures including the temporary structures and the construction companies have to let 'the Relative Professionals' confirm the structural integrity of temporary structures, the shores(${\geq}5m$ high) and the scaffolds(${\geq}31m$ high), before construction. Also, MOLIT has amended the "Regulation for Construction Technology Promotion Act" on Jul. 4th, 2016 for quality management and testing of temporary equipments. According th this regulation, the construction companies and supervisors should manage and test the temporary equipments before using them. In this paper, the standard drawings of the shores(< 5 m high) and the scaffolds(< 31 m high) and the amended "Business Guideline for Quality Management of Construction Work" are presented. As the result of this study, MOLIT noticed the amended "Business Guideline for Quality Management of Construction Work" on Jul. 1st, 2017.

The Application of KOESWall System as a Temporary Structure (임시구조물로서 분리형 보강토 옹벽의 적용사레)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.09a
    • /
    • pp.53-58
    • /
    • 2000
  • The KOESWall system that minimizes the horizontal deformation of reinforced wall effectively was developed bt E&S Eng. Co., Ltd. in 1999. Due to its systematical feature i.e. isolated construction method. KOESWall system is able to use as temporary structures more economically without the facing block. In this report, it is shown that the case history of KOESWall as a temporary soil retaining structure and the field measuremnets.

  • PDF

The Development and Application of KOESWall System (분리형 보강토 옹벽의 개발 및 적용사례)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.323-328
    • /
    • 2001
  • In the ordinary reinforced earth wall, which was constructed by incremental construction method, the horizontal deformation of the facing due to the compaction induced horizontal earth pressure was unavoidable. Thus the KOESWall system which are adopted the isolated construction method was developed by I&S Eng. Co., Ltd. in 1999. Due to its systematical feature, KOESWall system is able to minimizes the horizontal deformation of reinforced wall effectively and it can be used as temporary structures more economically without the lacing block. In this report, it is shown that the concept and case histories of KOESWall system as a retaining structures.

  • PDF

A Case Study on the Self-Supported Earth Retaining Wall with Different Formations (다양한 형태의 2열 자립식 흙막이 공법 시공사례 연구)

  • Sim, Jae-Uk;Kim, Kyoung-Chul;Son, Sung-Gon;Park, Young-Jin;Im, Jong-Chul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1039-1049
    • /
    • 2010
  • Excavation support systems are the temporary earth retaining structures that can prevent the lateral movement of soils. The systems are initially performed before other construction operations and have a great impact on the entire construction period. The temporary support system in Korea have been carried out generally along with installing supports, which are struts, tiebacks, and rakers. However, most of existing support systems in application relatively have limitations such as cost increase, construction configuration, and displacement occurred with support systems. Thus, a new retaining support system (referred to as the SSR, New Construction Technology No. 533) was developed to solve the aforementioned problems. This study introduces the design, construction, and maintenance of the SSR system under the different construction conditions. The behavior and characteristics of the SSR system were identified based on the case studies.

  • PDF

Design Optimization of Earth Retaining Walls Using the Taguchi Method (다구찌 기법을 활용한 흙막이 가설공법 최적설계 방안)

  • Moon, Sungwoo;Kim, Sungbu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.83-89
    • /
    • 2017
  • Temporary structures provide the accessible working area when building a permanent building structure in the construction operation. Executed in a natural environment, the temporary structure is prone to the external influence factors of underground water, soil conditions, etc. These factors should be carefully considered in designing the temporary structure. The objective of this study is to apply the external influence factors in designing a more reliable earth retaining wall. The research methodology is based on the Taguchi method that has been studied to improve product quality in the industry. An orthogonal array was developed to analyze the interaction between the external influence factors and the internal influence factors. A sample case study demonstrated that the Taguchi method can be used in planning a more reliable temporary structure for earth retaining walls.

Stability Evaluation of Earth Retaining Structure using Tower Truss System (새로운 무지보 흙막이 공법의 안정성 평가)

  • Kim, Young-Seok;Kim, Ju-Hyong;Kim, Young-Nam;Kim, Seong-Hwan;Lee, Sung-Reol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1324-1329
    • /
    • 2009
  • Needs for underground space development and utilization have been increasing in urban area. The conventional strutting method in excavation is effective to restrain the ground movements and displacements of earth structures but inefficient for workers because of small working space. The conventional earth reinforcement methods such as earth-anchor and soil-nailing also have limitation to apply in urban area due to threats to stability of adjacent buildings around excavation boundaries. Recently, many types of earth retaining structures are being developed to overcome disadvantages of conventional excavation methods in urban area. In this study, a series of numerical analyses were performed with MIDAS GTS, geotechnical analysis program and MIDAS Civil, structural analysis design program to evaluate behavior and stability of the new type of non-supporting earth retaining structure, called Temporary Tower System (TTS), consisting of tower truss structures with much economical and spatial advantage.

  • PDF