• Title/Summary/Keyword: temporary facilities

Search Result 161, Processing Time 0.026 seconds

A Study of Temporary Residence for Disaster Suffers and Development (재난${\cdot}$재해 이재민을 위한 임시주거개발의 필요성에 관한 연구)

  • Lee, Kang-Bok;Kim, Ki-Hyung;Lee, Myung-Sik
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2005.05a
    • /
    • pp.93-97
    • /
    • 2005
  • People can't be free from the panic of flood, war and terrorism which could be fatal for people's life and property in modern society. It is the most important thing that provide food and residence for suffers in disaster areas. When disaster occurred, the emergency public facilities would be the first place that the people stay. However, these also could be destroyed by disaster. In that case, emergency tents or containers could be the major residence for disaster suffers. Because the only concern for planning temporary residence is the matter of supply and efficiency, it is no longer useful after the disaster end. Therefore, temporary residence as well as general residence should be on the basis of social and cultural factors as well as basic and physiological factors. It is very crucial to study the model of temporary residence. It could be the fundamental and necessary for the human being in order to prepare the natural disaster and grand scale accident. The main purpose for this study is examining the temporary residence that satisfy the fundamental, social and cultural factors for disaster sufferers.

  • PDF

A Design Methodology for the Temporary Isolation Room Based on the MERS-Cov Infection Control Guideline - In Case of Temporary Negative Pressure Isolation Room Using Shipping Container - (메르스 감염관리지침에 따른 감염병 임시 격리병동 계획방법에 관한 연구 - 컨테이너를 이용한 음압격리병동을 중심으로 -)

  • Lee, Sang-Hyun;Lee, Jin-Woo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.33 no.12
    • /
    • pp.19-28
    • /
    • 2017
  • The purpose of this study is to propose a design methodology to build temporary isolation rooms when infectious diseases suddenly occur in a certain region, such as the case of MERS-Cov in South Korea in 2015. Although most big hospitals usually have isolation rooms, they are expensive and dangerous to run such facilities on normal and typical days. To deal with these problems in this research, shipping containers are chosen as devices used to build the temporary isolation rooms near the original hospital. To do so, firstly, a prototype for the temporary isolation room was designed with the three part modules. The first part is for the medical team; the second part including the isolation rooms is for patients; the third part is for medical selection rooms to test the specimens. Secondly, the plan was compared with the MERS-Cov infection control guidelines. Finally this prototype is applied into the Yong-in Yon-sei severance hospital and then evaluated through a CFD simulation using STAR-CCM+(ver.9.06) for checking infectious bacterium movement in this prototype. The result showed that the prototype is effectively safe for patients tested as negative, patients waiting to be tested, and the medical team.

A Design and Development of a Temporary Housing System Based on BIM in Advance of Disasters (BIM 기반 재난 대비 임시주거시설 설계 시스템 개발에 관한 연구)

  • Yoon, Seung-Hyun;Choi, Jin-Won;Cho, Su-Yeon
    • Journal of the Korean housing association
    • /
    • v.24 no.1
    • /
    • pp.69-78
    • /
    • 2013
  • Recently, due to the casualties and property damage caused by disasters, it became important to evacuate the victims to a safe place and come up with a space for them to inhabit for a certain period of time. Therefore, this study aims to design and develop a temporary housing system that would quickly provide a safe and comfortable living space until the displaced persons can return to a normal life again when a disaster occurs. As a result, a system of a BIM-based modular housing, a modular town through automatic placement, and a method to calculate the capacity and the total cost was developed. As this system provides the temporary housing facilities and the site in 3D, it can be utilized as a training material on a normal basis, as well as the first case material for rapid decision making when there is a disaster.

APPLICATION OF USN TECHNOLOGY FOR MONITORING EARTH RETAINING WALL

  • Sungwoo Moon;Eungi Choi;Injoon Kang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.517-520
    • /
    • 2013
  • In construction operation, the temporary structure is used to support designed facilities or to provide work spaces for construction activities. Since the structure is used only during the construction operation, the operation may be given insufficient attention. The contractor is likely to try to save cost on the material and labor cost. This contractor's behavior frequently leads to construction accidents. In order to prevent accidents from the failure, the operation should be carefully monitored for identifying the effect of dynamics in the surrounding site area. Otherwise, any unexpected adversary effect could result in a very costly construction failure. This study presents the feasibility of the ubiquitous sensor network (USN) technology in collecting construction data during the construction operation of earth retaining walls. The study is based on the result at the Construction System Integration Laboratory (CSIL) at the Pusan National University. A USN-based system has been developed for monitoring the behavior of the temporary structure of earth retaining walls. The data collected from the sensors were used to understand the behavior of the temporary structure. The result of this study will be used in increasing the safety during the construction operation of retaining walls.

  • PDF

Behavior Case Study of Temporary Structures during Underground Extension Work by Field Measurement (현장계측을 통한 지하증축공사 중 가설구조물의 거동 사례연구)

  • Kim, Uiseok;Min, Byungchan;Kang, Minkyu;Kim, Dongkwan;Choi, Hangseok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.8
    • /
    • pp.5-13
    • /
    • 2020
  • During the construction of underground space expansion of old facilities, it is necessary to secure temporary residence space for existing residents as well as noise and vibration issues during construction, and in the case of commercial, industrial, and social use, damage is expected from suspension of the use of facilities. There is a need for a technology that minimizes noise and vibration during underground expansion, enabling the use of existing facilities even during construction. In this study, a practical underground extension model is proposed by analyzing the behavior of the temporary structure and the surrounding ground as a result of measurement at each construction stage for a actual construction site. In order to solve the problems that occurred during construction, the basement slabs were placed in advance after the initial excavation. The measurement results (building inclinometer, crack measurement system, structure inclinometer and surface settlement meter) at the site were reviewed to analyze the behavior of the temporary structure and surrounding ground. As a result, it was confirmed that the inclinometer of the building and the structural inclinometer showed a tendency that the displacement after the slab line was placed was reduced or converged. The placement of basement slabs during underground extension not only relived the noise and vibration problems during construction, but also secured the stability of structures.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

A Basic Study on the BIM-based AR(Augmented Reality) System for Safety Management (안전관리를 위한 BIM적용 증강현실 시스템 적용 방안에 관한 기초연구)

  • Lee, Jong-Hoon;Choi, Ju-Won;Seo, Hee-Chang;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.147-148
    • /
    • 2012
  • According to the analysis report of construction fall accident, situation not installed safety facilities caused the largest of disaster in temporary structure. Therefore, actionable measures will be needed identifying the installation of safety facilities immediately. In this study proposed plan by the safety facilities to effectively visualize, supervision can be easily for reduce fall accident. This system can be used BIM and augmented reality technology by combining in the field in real-time. Through this study, safety facilities management is improved and expected to prevent a accident.

  • PDF

Architectural Design Elements for Hazard-Resistant and Reduction House (방재 및 감재주택을 위한 건축 계획 요소의 설정)

  • Kim, Hyeong-Eon
    • KIEAE Journal
    • /
    • v.16 no.6
    • /
    • pp.77-82
    • /
    • 2016
  • Purpose: Almost every research carried out in our country against the natural disaster is focused on the temporary facilities such as temporary housing, emergency shelter and as a result, it is very hard to find out researches on the ordinary houses which installed integrated systems of hazard-resistant against the natural disaster. Method: To conduct this research, categorizing process for design, structural, environmental and installation elements found in the Hazard-Resistant and Reduction House built for sale in Japan was performed. Result: In this study, several design concepts and subordinate items are recommended for hazard-resistant housing. First, design concept of 'Preparedness' which means security and access to the storage storing goods especially food & beverage for the emergencies is needed. The subordinate items consist of security of stocking space, diversified and circular storage system, and safety storage system. Second, design concept of 'Security' which means security of physical safety space and rapid recovery to returning to daily life against natural disaster is needed. The subordinate items consist of many items including not only structure and facilities but also architectural design method. And finally, design concept of 'Maintenance, Support and Return' which means minimizing the physical and psychological damages and support safety and physical conditions of the victims from the impact of the disaster to returning to daily life is needed. The subordinate items consist of high efficiency insulation/airtightness design, microclimate design, combination of photovoltaic system and storage battery, non-power appliance system against the power failure, storing system for drinking water, rainwater storing and utilization system.

The Utilization Method of Unsold/Unused Land in Urban Development Project Areas : Estimating Feasibility of Temporary Commercial Parking Lots Using CVM (조건부가치측정법(CVM)을 활용한 개발사업지구 내 유휴부지 유료주차장 활용방안 연구)

  • Kim, Tae Gyun;Park, Ji Eun;Yun, Jeong Ran
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.57-66
    • /
    • 2019
  • In this study, the author suggests utilizing unsold and unused land as temporary commercial parking lots as a way to raise funds for active public transport use. In addition, reasonable parking fee scheme is suggested by estimating marginal parking fee and marginal parking distance for the commercial parking lots based on the CVM. The author conducts a survey to investigate citizens' opinion on utilizing unsold and unused land in the urban development project area as temporary commercial transport facilities such as parking lots. Based on survey outcome, travel behavior and requirements are analyzed and marginal parking fee and marginal parking distance are estimated through the Contingent Valuation Method (CVM). The results are as follows: in the single-bounded dichotomous choice model, people are willing to pay 216 KRW for 165m in average for 10 minutes and their willingness to pay goes down against reaching distance to the parking lots from 365 KRW for 50m, 295 KRW for 100m, 173 KRW for 200m, and 51 KRW for 300m; in the double-bounded dichotomous choice model, people are willing to pay 285 KRW for 165m in average for 10 minutes and their willingness to pay goes down as well against reaching distance to the parking lots from 310 KRW for 50m, 297 KRW for 100m, 272 KRW for 200m and 248 KRW for 300m. It is clearly appeared that people's willingness to pay goes higher as distance to reach the parking lots goes shorter.

A Study on the Direction of System Improvement for the Utilization of Residential Spaces of the Emergency Evacuation Facilities in Responding to War (비상대피시설의 거주 공간 활용을 위한 제도 개선 방향 설정에 관한 연구)

  • Kim, Yujin;Hwang, Eunkyoung;Ham, Eungu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.78-86
    • /
    • 2013
  • Caused by the Cheonanham attack and the Yeonpyeongdo bombardment occurred a few years ago, and the recent North Korea's nuclear test, the war crisis between South and North Korea has been increasing. Accordingly, an interest in obtaining a temporary residential space, for the case of the outbreak of war, where people can reside safely over a period of time has been escalating. However, in the disaster relief planning guidelines of the National Emergency Management Agency, the standards on the temporary residential spaces in preparation for storm and flood or earthquake are included, but the standards on the ones in responding to war are not yet equipped. In particular, the standards on the underground temporary residential spaces that can accommodate massive victims should be developed in preparation. In this study, through a requirements analysis based on the survey of war victims and a comparative analysis between disaster-related laws and regulations, the direction of relevant system improvement for the utilization of temporary residential spaces in responding to war is established.