The Performance Analysis to Identify the Reuse and Assembly Impact of Temporary Equipment

  • Bae, Sung-Jae;Park, Jun-Beom;Kim, Jung-Yeol;Kim, Young-Suk;Kim, Jun-Sang;Jo, Jae-Hun
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1252-1252
    • /
    • 2022
  • Temporary work that utilizes temporary equipment (e.g., system scaffold and system pipe support) in construction work is one of the most vulnerable work from a safety perspective in South Korea. Typically, temporary equipment is reused at construction sites. The Korea Occupational Safety and Health Agency announced guidelines regarding the performance standards for reusable temporary equipment to prevent the accidental collapse of temporary facilities. Nevertheless, temporary facilities' collapse still occurs, which could be attributed to a degradation in the performance due to the reuse of temporary equipment. Therefore, this study investigated the performance of simple temporary structures assembled with new and reused equipment. To this end, an experimental module was designed based on previous research cases, and two experimental models were constructed, in which one was assembled using new equipment (Model A), and the other was built using reused equipment (Model B). To determine the performance of each model, a load test was conducted to measure the maximum load that each model could withstand. The experimental results revealed that the maximum load of Model B was 15% lower than that of Model A. This indicates that there is a meaningful performance difference between those two models. Based on this result, the authors decided to perform additional tests with more realistic models than previous ones. The new experimental module was designed to ensure compliance with the Korean design guidelines. In this presentation, the authors show details of the first tests and their results and plan for the additional test.

  • PDF

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

Development of Individual Temporary Equipment Material/Quality/Delivery Management Standards(Guide) for Temporary Equipment Rental Company (가설기자재 임대업체를 위한 개별 가설기자재 자재/품질/납품관리 기준(Guide) 개발)

  • Lee, Junho;Kim, Junsang;Yoou, Geonhee;Cho, Sehyun;Kim, JungYeol;Kim, Youngsuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.1
    • /
    • pp.62-72
    • /
    • 2024
  • Due to the distribution structure of domestic temporary equipment, quality control of temporary equipment is essential because more than 80% of temporary equipment is repeated and reused. Due to this importance, the Ministry of Land, Infrastructure and Transport has proposed quality management standards for temporary equipment for 10types of temporary equipments, including steel pipe support, but the overall quality of temporary eqipment cannot be confirmed because the quality is managed through sampling quality tests. In addition, although quality control standards exist for temporary material rental company, practical utilization was investigated and analyzed to be very low as they are mainly presented based on qualitative inspection standards by visual inspection. Therefore, the purpose of this study is to develop individual temporary material/quality/delivery management standards (Guides) for temporary equipment rental company to preemptively secure the quality of temporary equipment before bringing them into the construction site. If the standards developed through this study are applied to domestic temporary equipment rental companies, it is expected that high-quality temporary equipment with secured quality will be brought into the construction site as the quality of temporary equipment quality of domestic medium and small temporary equipment rental companies is improved safety accidents related to temporary structures.

Feasibility Analysis for the Introduction of Safety Certification System for Assembled Temporary Equipment and Materials (조립된 가설기자재 안전인증제도 도입의 타당성 분석)

  • Jeong, Seong Choon;Kwon, Jun Hyuk;Won, Jeong Hun;Kwon, Yong Jun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.32-42
    • /
    • 2020
  • In this study, in order to secure the necessity of introducing the safety certification system for the assembled temporary equipment and materials, the feasibility of the introduction was analyzed through literature review, structural analysis, and actual experiments and surveys related to the assembled temporary equipment and materials. In the previous studies, it was found that the research on the assembled temporary equipment and materials was insufficient, and it was possible to grasp the necessity of introducing the safety certification system for the assembled temporary equipment and materials. In addition, in the results of the serious accident analysis, it was found that the soundness of the temporary equipment and materials is determined by the structural characteristics after it was assembled. As a result of the feasibility analysis of the introduction of the safety certification of the assembled temporary equipment and materials through structural analysis, it is possible to effectively and rationally reflect the main geometrical influence factors, and to introduce the safety certification system that can test the procedures and procedures of the assembled temporary equipment and materials and based on it. It was found that there is a need. As a result of feasibility analysis on the necessity of introducing the safety certification system for assembled temporary equipment and materials through actual experiments, the existing single member performance evaluation has limitations in evaluating the structural performance of the assembled temporary equipment and materials. It was found that there is a need to introduce a safety certification system. As a result of gathering opinions on the feasibility of introducing the safety certification system for assembled temporary equipment and materials of manufacturers and users through the survey, it was found that the overall positive response result was high and the effectiveness was high.

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

A Study on the Improvement Plan of Reusable Pipe Support Certification System (재사용 파이프서포트 인증제도의 개선방안 연구)

  • Moon, Seong-Oh;Lim, Nam-Gi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.4-5
    • /
    • 2020
  • Pipe support is a representative structure that supports slab formwork, and it is a representative temporary equipment that has been systematically managed since the 1990s when the domestic temporary equipment performance test system was introduced. Nevertheless, it is also a reality that many of the products in circulation are used products that are reused and do not meet the performance of the initial manufacturing stage. However, if only new products are insisted, it could lead to delays in the process due to an increase in construction costs and difficulties in timely delivery. On the contrary, it is not acceptable for the safety of the construction site to use products of low quality without verification procedures or standards. Therefore, this study attempts to grasp the management system such as safety certification for temporary equipment and the actual condition of quality control to maintain performance, and propose improvement plans.

  • PDF

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.

A Study for Evaluation of Performance and Influence Factors for Steel Pipe Supports ( I ) (강제파이프서포트의 성능평가 및 영향요인에 대한 연구( I ))

  • Hwang Jung-Hyun;Shin Sang-Tae;Yun Sang-Moon;Kim Kyung-Hwa
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.2 s.80
    • /
    • pp.139-146
    • /
    • 2004
  • Recently, interest on the performance of the construction temporary equipment have been greatly increased. Since the application of the 'Performance Test Code' for the equipment in 1992 according to the Industrial Safety and Health Act, a basic study of Steel Pipe Supports have been carried out for the last 2 years based on the Performance Test Results. The present code specification for the Steel Pipe Supports and research status are introduced. So far, total 849 specimen have been examined on their outer and inner pipe's length, thickness, their overlapping length, and their load carrying capacities. The test was conducted separately into two groups - used and new equipment, and it was found that the used ones revealed a decrease on their load carrying capacity, almost $10\%$ compared to the new ones. Considering this fact, it is strongly recommended to ensure the quality of the equipment before use at the jobsite. First of all, based on this basic investigation, the statistical values on the Steel Pipe Supports are suggested and further analysis on the effect of each component is in progress. It is, however, expected that this report can be used as a basic information on the Steel Pipe Supports.

The Classification Plan on Safety Certification System of Temporary Equipment (건설 가설재의 안전인증 분류방안)

  • Park, Sang-Wook;Park, Jun-Mo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.794-799
    • /
    • 2008
  • At the point of changing from the capacity qualification of temporary equipments for building to safety certification system, the meaning of qualification and the present state of main products are evaluated for Capacity qualification system and compare with related system in developed country. These suggest classification of temporary equipments for building construction in safety certification. Now, present state of the capacity qualification system is estimated; according to the reforming system from restating law in 2003, there are a lot of changing of application in every 3 years because of that. The ability of Making business is improved by checking again but, there are limitation to constantly keep the safety as the system to approve form about sent imitation products. Changing from the capacity qualification system to safely certification system make to include the structure of the qualification system and make a plan standard. It make least panic in the building market and set up some standards for capacity by changing building circumstance. The classification of temporary equipment for building construction in safety certification from the module of quotation form classify each duty quotation item, self-regulation safely verification item and option quotation item, these will more improve the system form and quality of temporary equipment for building than before.

  • PDF

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.