• Title/Summary/Keyword: task rescheduling

Search Result 5, Processing Time 0.022 seconds

Task Rescheduling Using a Coordinator in a Structural Decentralized Control of Supervisory Control Systems

  • Lee, Sang-Heon;Kim, Ill-Soo;Kai C. Wong
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.5 no.2
    • /
    • pp.22-31
    • /
    • 2004
  • A problem of task rescheduling using a coordinator in a structural decentralized control of supervisory control theory is formulated. we consider that the overall system is divided into a number of local systems. Using an example of a chemical batch reaction process, it has shown that after local supervisors have been established for a given task, a coordinator can be used to solve some rescheduling problems among local plants for new or modified tasks. The coordination system models the interactions of local plants, and is consisting of only the shared events of local plants, so simpler to synthesize. A coordinator is designed based on the specifications given for the coordination system. Under the 'structural' conditions developed in this paper, the combined concurrent actions of the coordinator with the existing local supervisors will achieve the rescheduling requirements. Again since the conditions are structural (not specification-dependent), once the coordination architecture has been established, it can be used for a number of different tasks without further verifications.

Fuzzy PSO Congestion Management using Sensitivity-Based Optimal Active Power Rescheduling of Generators

  • Venkaiah, Ch;Vinod Kumar, D M
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.1
    • /
    • pp.32-41
    • /
    • 2011
  • This paper presents a new method of Fuzzy Particle Swarm Optimization (FPSO)-based Congestion Management (CM) by optimal rescheduling of active powers of generators. In the proposed method, generators are selected based on their sensitivity to the congested line for efficient utilization. The task of optimally rescheduling the active powers of the participating generators to reduce congestion in the transmission line is attempted by FPSO, Fitness Distance Ratio PSO (FDR-PSO), and conventional PSO. The FPSO and FDR-PSO algorithms are tested on the IEEE 30-bus and Practical Indian 75-bus systems, after which the results are compared with conventional PSO to determine the effectiveness of CM. Compared with FDR-PSO and PSO, FPSO can better perform the optimal rescheduling of generators to relieve congestion in the transmission line.

Energy-efficient Reconfigurable FEC Processor for Multi-standard Wireless Communication Systems

  • Li, Meng;der Perre, Liesbet Van;van Thillo, Wim;Lee, Youngjoo
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.17 no.3
    • /
    • pp.333-340
    • /
    • 2017
  • In this paper, we describe HW/SW co-optimizations for reconfigurable application specific instruction-set processors (ASIPs). Based on our previous very long instruction word (VLIW) ASIP, the proposed framework realizes various forward error-correction (FEC) algorithms for wireless communication systems. In order to enhance the energy efficiency, we newly introduce several design methodologies including high-radix algorithms, task-level out-of-order executions, and intensive resource allocations with loop-level rescheduling. The case study on the radix-4 turbo decoding shows that the proposed techniques improve the energy efficiency by 3.7 times compared to the previous architecture.

Implementation of MAPF-based Fleet Management System (다중에이전트 경로탐색(MAPF) 기반의 실내배송로봇 군집제어 구현)

  • Shin, Dongcheol;Moon, Hyeongil;Kang, Sungkyu;Lee, Seungwon;Yang, Hyunseok;Park, Chanwook;Nam, Moonsik;Jung, Kilsu;Kim, Youngjae
    • The Journal of Korea Robotics Society
    • /
    • v.17 no.4
    • /
    • pp.407-416
    • /
    • 2022
  • Multiple AMRs have been proved to be effective in improving warehouse productivity by eliminating workers' wasteful walking time. Although Multi-agent Path Finding (MAPF)-based solution is an optimal approach for this task, its deployment in practice is challenging mainly due to its imperfect plan-execution capabilities and insufficient computing resources for high-density environments. In this paper, we present a MAPF-based fleet management system architecture that robustly manages multiple robots by re-computing their paths whenever it is necessary. To achieve this, we defined four events that trigger our MAPF solver framework to generate new paths. These paths are then delivered to each AMR through ROS2 message topic. We also optimized a graph structure that effectively captures spatial information of the warehouse. By using this graph structure we can reduce computational burden while keeping its rescheduling functionality. With proposed MAPF-based fleet management system, we can control AMRs without collision or deadlock. We applied our fleet management system to the real logistics warehouse with 10 AMRs and observed that it works without a problem. We also present the usage statistic of adopting AMRs with proposed fleet management system to the warehouse. We show that it is useful over 25% of daily working time.

Energy Expenditure of Male Blue Collar Workers (생산직 남성근로자의 작업 중 에너지 소모량)

  • Woo, Ji Hoon;Kang, Dongmug;Shin, Yong Chul;Kim, Myeong Ock;Son, Min Jung;Kim, Boo Wook;Cho, Byung Mann;Lee, Su Ill
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.16 no.2
    • /
    • pp.183-192
    • /
    • 2006
  • Predicting energy expenditure (EE) is important to prevent work-related musculoskeletal disorders (WMSDs). The problem to predict EE is that the standard of EE is based on western data. The authors checked average EE by job categories to provide basic data for suggesting proper work intensity for Korean workers. This study was conducted from 2003 to 2005. Study subjects were recruited from 4 car parts assembly plant, 2 car assembly plant, 2 Heavy machine manufacturing plant and 2 shipyards. Total study subjects were 515 male workers. To estimate VO2max, sub-maximal test was conducted to measure VO275%max by bicycle ergometer (Combi Co, Aerobike 75XL II). Heartbeats were recorded with heartbeat recorder (Polar Electro Co, Finland, S810) during work. EE of work was calculated by recorded heartbeat and individual regression equation which was derived from sub-maximal test. Subjects were classified into 4 industry and 8 work posture, 23 job task categories. Mean EEs (S.D.) according to industry classification (kcal/min) were 4.9 (0.7), 4.8 (0.7), 4.9 (0.7), 5.0 (0.9), and 4.0 (0.5) for Car Part manufacture, Car Assembly, Ship Building, Heavy Machinery Manufacture, and Hospital Office, respectively. The results suggest that Korean male workers of exceeding to the NIOSH criteria will be needed to plan for job rescheduling to maintain $worker^{\circ}$Øs health. Further study to establish Korean work intensity standard would be needed.