• 제목/요약/키워드: task planning

검색결과 532건 처리시간 0.03초

Development of PC-based Radiation Therapy Planning System

  • Suh, Tae-Suk;P task group, R-T
    • 한국의학물리학회:학술대회논문집
    • /
    • 한국의학물리학회 2002년도 Proceedings
    • /
    • pp.121-122
    • /
    • 2002
  • The main principle of radiation therapy is to deliver optimum dose to tumor to increase tumor cure probability while minimizing dose to critical normal structure to reduce complications. RTP system is required for proper dose plan in radiation therapy treatment. The main goal of this research is to develop dose model for photon, electron, and brachytherapy, and to display dose distribution on patient images with optimum process. The main items developed in this research includes: (l) user requirements and quality control; analysis of user requirement in RTP, networking between RTP and relevant equipment, quality control using phantom for clinical application (2) dose model in RTP; photon, electron, brachytherapy, modifying dose model (3) image processing and 3D visualization; 2D image processing, auto contouring, image reconstruction, 3D visualization (4) object modeling and graphic user interface; development of total software structure, step-by-step planning procedure, window design and user-interface. Our final product show strong capability for routine and advance RTP planning.

  • PDF

이동 Robot를 위한 경로계획법 (Path planning method for mobile robot)

  • 범희락;조형석
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.722-725
    • /
    • 1990
  • This paper proposes a new path planning method for obstacle avoidance of mobile robot. In order to achieve easy planning of the path, a simple representation of the empty space is achieved based on thinning algorithm. The proposed Planning technique facilitates the direct use of information obtained by camera. Comparing to the V-graph method, the task of determining the shortest path from the resulting skeleton of empty space is optimized in terms of number of computation steps. The usefulness of the proposed method is ascertained by simulation.

  • PDF

휴리스틱스(Heuristics)를 활용한 지능형 굴삭 시스템의 Task Planning System 개발 (Development of Task Planning System for Intelligent Excavating System Applying Heuristics)

  • 이승수;김정환;강상혁;서종원
    • 대한토목학회논문집
    • /
    • 제28권6D호
    • /
    • pp.859-869
    • /
    • 2008
  • 현재 전 세계적으로 이미 대부분 산업에서의 생산라인은 자동화되었으며 이는 생산성 및 경제성의 향상, 산업 재해에 대한 안전성 확보, 품질 향상 및 경쟁력 향상 등 많은 이익을 가져왔다. 그러나 건설 산업에서 자동화는 일반적인 산업생산라인과 달리 끊임없는 불확정적인 사건의 발생과 이에 따른 지능적 판단 및 처리 능력의 필요성으로 인한 해결해야 할 많은 어려움이 따르기 때문에 여전히 건설 기계장비 사용을 통한 노동력 투입에 의존하고 있다. 이러한 문제를 해결하기위하여 유럽, 미국, 일본 등 선진국에서 건설 자동화를 위한 끊임없는 연구가 진행 중이며 도로 포장, 다짐 및 작업프로세스가 비교적 단순한 반복형 작업에 대하여 자동화가 많이 이루어 졌지만 건설 현장에서 가장 비중을 많이 차지하는 토공 작업에 대하여 아직 자동화 연구가 미흡하다. 토공 작업의 자동화를 위해서는 획득된 지형정보를 분석하여 효율적인 작업 계획의 수립이 수행되어야 하며, 이를 위해 숙련된 작업자의 휴리스틱스(heuristics)를 활용하면 보다 시행착오가 적고 안전하며 효율적인 작업계획을 수립할 수 있을 것이다. 따라서 본 연구에서는 지능형 굴삭 시스템의 효율적인 작업계획의 수립을 위한 시스템인 지능형 Task Planning System의 구성 체계 및 각 단계마다 적용된 휴리스틱스(heuristics)에 대하여 소개하여 본다.

시간 제한 조건을 고려한 유전 알고리즘 기반 다수 무인기 임무계획기법 (Genetic algorithm based multi-UAV mission planning method considering temporal constraints)

  • 정병민;장대성;황남웅;김준원;최한림
    • 항공우주시스템공학회지
    • /
    • 제17권2호
    • /
    • pp.78-85
    • /
    • 2023
  • 다수 무인기 체계에서 임무할당은 임무 수행 능력을 결정하는 중요한 요인이다. 본 논문은 유전 알고리즘에 기반한 임무계획기법을 제안한다. 본 기법을 통해 제한 조건을 만족하면서, 임무 완료 시간을 최소화하는 해를 구할 수 있다. 임무 할당 문제의 최적해를 구하기 위해서는 계산량이 많이 필요하므로 본 기법이 해를 구하는 대안이 될 수 있다. 본 기법은 현실 세계의 다양한 종류의 무인기, 임무, 제한 조건을 고려하였다. 제안된 기법은 각 무인기의 임무 시퀀스와 제한 조건 만족을 위한 임무 별 대기 시간을 도출한다. 다양한 수치적 시뮬레이션 결과를 통해 임무 종료 시간을 최소화하는 임무계획 기법의 성능을 확인하였다.

디자인 프로젝트 관리 시스템(DPMS)의 구성 (Construction for the Design Project Management System(DPMS))

  • 우흥룡
    • 디자인학연구
    • /
    • 제12권3호
    • /
    • pp.227-234
    • /
    • 1999
  • 본 논문은 디자인 프로젝트 관리의 리엔지니어링으로서 프로젝트의 기획, 조직, 일정, 그리고 제어하는 통합적인 어플리케이션 소프트웨어 개발의 기초모델을 설정하고, 이를 토대로 프로젝트 관리 시스템의 연구/개발을 목표로 삼고 있다. 프로젝트의 성과, 소요기간, 소요예산, 그리고 소요자원 등을 관리하는 과정이 프로젝트 매니지먼트 기술의 근간을 이루는 것으로, 디자인 프로젝트 상의 수많은 정보를 적시에 효율적으로 처리함으로써 프로젝트를 성공으로 이끌 수 있게 된다. 한편, 디자인프로젝트의 관리를 집단의사결정에 의해 처리함으로써 신뢰도와 합리성의 제고는 물론, 이를 통한 사기앙양이 기대된다. 따라서, 여기에서 야기되는 의사집합의 곤란, 시간손실, 구성원의 갈등 등의 프로젝트 관리에서 비롯되는 부수적인 문제도 전자의 기본적인 관리요소와 함께 통합하여 디자인 프로젝트 관리 시스템(DPMS)을 연구/개발하였다. DPMS 시스템은 디자인 프로젝트의 선정과 디자인 프로젝트의 기획/실행관리/ 평가로 주요 모듈을 설정함으로써 프로젝트 매니저는 해당 프로젝트 과업(Task)과 활동(Activity)에 대한 팀의 운용을 융통성 있게 관리할 수 있게 된다. 이와 더불어 프로젝트 관리를 On-Line DBMS 시스템 환경 상에 운용되도록 하여 정보의 재생산성, 운용의 동시성, 그리고 보안성 등을 도모하였다.

  • PDF

도시 가족계획요원의 직무수행에 영향을 미치는 요인에 관한 연구 -서울특별시 동단위 가족계획카드관리요원을 중심으로- (A Study on the Factors which Influenced the Performance of Urban Family Planning Health Personnels' Function - Around the FP health personnels in the Seoul metropolitan city-)

  • 이명숙;문형화
    • 한국보건간호학회지
    • /
    • 제3권2호
    • /
    • pp.143-156
    • /
    • 1989
  • This study was done in order to analyze the factors which influenced the performance level of urban family planning health personnels' task. Interview survey was done during the period May, 1989. Interviewee were 130 family planning health personnels among total of 140 family planning health personnels in Seoul metropolitan city area. The internal consistency reliability was tested by Cronbach’s Alpha and the construct validity of the survey tool was tested by Factor analysis. Multiple stepwise regression analysis was used to identify major factors influenced to perform family planning health personnels' task. The results of this study were summarized as follows: 1. The internal consistency reliability was high and very significant (Cronbach's Alphs=0.8445, p<0.0000). 2. The construct validity was high and very significant. This analysis was contained 5 factors; registering and keeping of eligible woman records, health educating for FP & MCH, referral for vasectomy and tubal ligation and loop, supplying contraceptive appliances, sending moved-out eligible woman records. 3. Among a total of 15 contents of their functions recording of daily report and monthly report (76.2%), classifying and keeping of records(66.2%), registering of eligible woman records(60.85ti), distribution of leaflets and pamplets(54.6%), counselling & supervision about family planning(53.8%) were actively performed. Sending moved-out eligible woman records(60.8%), health education for community people(49.2%), referring contraceptors' side-effects were poorly performed. 4. The factors which influenced the performance level of urban family planning health personnels' function were age, marital status, educational level, certification, number of residents, number of eligible women, job car-eer, work responsibility, job satisfaction knowledge, position, cooperation of community people, cooperation of Dong Office, cooperation of Health Center. These 14 variables were able to explain job function from 21.4% of follow-up care of contraceptor to 9.1% of classifying & keeping of eligible woman records.

  • PDF

다층 환경에서의 라스트 마일 배송 서비스를 위한 경로 계획 및 엘리베이터 탑승 알고리즘 (Route Planning and Elevator Boarding Algorithms for Last Mile Delivery Service in Multi-floor Environments)

  • 이대규;강규리;김태진;심현철;정훈;김은혜
    • 로봇학회논문지
    • /
    • 제18권1호
    • /
    • pp.10-17
    • /
    • 2023
  • Recently, robots have been actively utilized for logistics and delivery services in various places such as restaurants, hotels, and hospitals. In addition, it provides a safer environment, convenience, and cost efficiency to the customers. However, when it comes to autonomous delivery in a multi-floor environment, the task is still challenging. Especially for wheeled mobile robots, it is necessary to deal with elevators to perform the last-mile delivery services. Therefore, we present a multi-floor route planning algorithm that enables a wheeled mobile robot to traverse an elevator for the delivery service. In addition, an elevator boarding mission algorithm was developed to perceive the drivable region within the elevator and generate a feasible path that is collision-free. The algorithm was tested with real-world experiments and was demonstrated to perform autonomous postal delivery service in a multi-floor building. We concluded that our study could contribute to building a stable autonomous driving robot system for a multi-floor environment.

와이블 분포의 형상모수와 정비비용을 고려한 Hard Time 예방정비업무의 효용성에 관한 연구 (The Usefulness of Hard Time Task for Weapon System in Considering Shape Parameter of Weibull Life Time Distribution and Maintenance Cost)

  • 김만수;지웅기
    • 한국산학기술학회논문지
    • /
    • 제17권1호
    • /
    • pp.274-283
    • /
    • 2016
  • 본 논문은 복잡해지는 군수분야에서 효율적이고 효과적인 예방정비업무 할당을 위해 Hard Time업무의 최적 주기산정 및 이를 통한 경제적 효용성을 분석하는데 연구 목적이 있다. 본 연구는 기존 연구에서 제시하는 예방정비 주기 선정방법의 한계점을 분석하였다. 또한 일반적인 Wearout 고장 특성을 설명하는 와이블 수명분포에서 다양한 형상모수 조건과 예방정비비용과 고장정비비용 조건을 가정한 시뮬레이션을 통해 가상의 시스템에 대한 정비활동을 모의하여 총 정비비용의 추의를 분석하였다.

격자 지도 기반의 다수 무인 이동체 임무 할당 및 경로 계획 (Task Allocation and Path Planning for Multiple Unmanned Vehicles on Grid Maps)

  • 정병민;장대성;황남웅;김준원;최한림
    • 항공우주시스템공학회지
    • /
    • 제18권2호
    • /
    • pp.56-63
    • /
    • 2024
  • 무인 이동체의 안전성이 점차 증대되면서 빌딩과 같은 장애물이 많은 도심환경에서의 무인 이동체의 활용이 증가할 것으로 예상된다. 도심 환경에서 다수의 무인 이동체가 운용될 경우, 임무 할당 뿐만 아니라 정적 및 동적 장애물 회피와 더불어 상호 충돌 회피가 가능한 경로를 생성하는 알고리듬이 필요하다. 본 논문에서는 임무 할당 및 경로 계획을 수행하는 알고리듬을 제안한다. 장애물 및 경로 계획을 효율적으로 수행하기 위해 맵을 격자 기반으로 구성한 다음 경로를 도출하였다. 동적인 환경에서 빠르게 재계획하기 위해 계산 시간 단축에 집중하였다. 시뮬레이션을 통해 작은 규모의 문제에서 장애물 회피 및 상호 충돌 회피 방안에 대해 설명하였고, 큰 규모의 문제에서 임무 전체 종료 시간(Makespan)을 관찰하여 성능을 확인하였다.

속도분리를 이용한 여유자유도 로봇의 최적 경로계획 (An Optimal Trajectory Planning for Redundant Robot Manipulators Based on Velocity Decomposition)

  • 이지홍;원경태
    • 제어로봇시스템학회논문지
    • /
    • 제5권7호
    • /
    • pp.836-840
    • /
    • 1999
  • Linear motion and angular motion in task space are handled separately in joint velocity planning for redundant robot manipulators. In solving inverse kinematic equations with given joint velocity limits, we consider the order of priority for linear motion and angular motion. The proposed method will be useful in such applications where only linear motions are important than angular motions or vice versa.

  • PDF