This paper deals with a mathematical approach for finding the time-fractions for the time-fraction based scheduling method in multimedia wireless networks. By introducing a constraint that regulates the performance fairness amongst users, we present a systematic method for harmonizing both the system and user performance. Numerical results show that the time-fraction based scheduling method reinforced with our scheme is very effective especially in multimedia environments.
A scheduling policy or a schedulability test is defined to be sustainable if any task system determined to be schedulable remains so if it behaves "better" than mandated by its system specifications. We provide a formal definition of sustainability, and subject the concept to systematic analysis in the context of the uniprocessor scheduling of periodic and sporadic task systems. We argue that it is, in general, preferable engineering practice to use sustainable tests if possible, and classify common uniprocessor schedulability tests according to whether they are sustainable or not.
Journal of Construction Engineering and Project Management
/
제4권3호
/
pp.53-59
/
2014
Project managers are responsible to conduct project on time with least amount of costs and the most possible quality with respect to shortage of resources and environmental certainties. They have to make the best decision to reach such conflicting objects. In this study the project scheduling with multi goals-multi modes was planned in fuzzy conditions under resource constraints and expanded by fuzzy goal programing (FGP). The project cost was calculated by the price of renewable resources and the quality criteria were evaluated by the quality function deployment method (QFD). Finally the model was verified by a construction case study with 22 activities along with solving by GAMS. The results showed that this model could provide a systematic framework to facilitate the decision making process and made the project managers to be able to schedule the project closer to reality.
This work is concerned with the assignment of the desired eigenstructure for linear time-varying systems such as missiles, rockets, fighters, etc. Despite its well-known limitations, gain scheduling control appeared to be the focus of the research efforts. Scheduling of frozen-time, frozen-state controller for fast time-varying dynamics is known to be mathematically fallacious, and practically hazardous. Therefore, recent research efforts are being directed towards applying time-varying controllers. In this paper, ⅰ) we introduce a differential algebraic eigenvalue theory for linear time-varying systems, and ⅱ) we also propose an eigenstructure assignment scheme for linear time-varying systems via the differential Sylvester equation based upon the newly developed notions. The whole design procedure of the proposed eigenstructure assignment scheme is very systematic, and the scheme could be used to determine the stability of linear time-varying systems easily as well as provides a new horizon of designing controllers for the linear time-varying systems. The presented method is illustrated by a numerical example.
The systematic management of technology infrastructure increasingly becomes critical as it represents the driving power for creating competitive advantage of nations and enterprises. In this sense, public facility and equipment, which is one major asset of technology infrastructure, should be managed effectively, systematically and efficiently to increase its overall equipment effectiveness. However, the manual and off-line communication was the unique way to communicate between the suppliers who provide facilities in the public sector and the customers who utilize the facilities in the industrial sector. This communication way caused invisibility of available usage time and increase of idle time, thereby decreasing the equipment effectiveness. This paper presents an web-based scheduling system that enables real-time collaboration and information sharing for increasing the equipment effectiveness. The designed system performs scheduling, facility management, order management and customer relationship management in an on-line platform, and carries out the processing and storing of relevant information in an integrated database. The paper includes a development approach to identify business process models and standardized system models by using object-modeling technique. The deliverable of the present work will contribute to increasing the equipment effectiveness by enhancing visibility, transparency and predictability by means of the integration with a legacy Enterprise Resource Planning.
It is a fundamental requirement for the medium-sized manufacturing company with multiple-types of products and mixed process flows to have a real time feedback system for systematic production scheduling and process control to maximize the productivity and delivery achievement. However it is very inferior in actual condition to make infrastructure for a systematic production scheduling and process control in middle-sized manufacturing company, Proposed in this paper is an MES implementation approach for the successful construction of MES infrastructure, implementation and operation in medium-sized manufacturing companies with multiple-types of products and mixed process flows.
본 연구는 우리나라 중규모 제조기업에서 전기전자, 기계 및 엔지니어링, 부품 소재산업을 모집단으로 하고 이들 모집단에서 전기전자 부문 12개 기업, 기계 및 엔지니어링 부문 18개 기업, 부품 소재 부문 16개 기업 등을 표본으로 선정하여 이들 표본기업의 기술경영의 실태를 분석하고 기술경영의 펙터가 신제품개발 성과에 미치는 영향을 분석하였다. 분석 결과 기술경영 펙터 중에 CTO를 비롯한 최고경영층의 기술경영에 대한 의지는 비교적 높게 나타났으나 그 외 사업전략과 기술전략의 연계성, 개방형 연구개발 시스템, 체계적 일정관리, 연구개발 인력관리, 제품수명주기관리 시스템 개발과 적용 등은 보통보다 조금 높은 수준인 것으로 나타난 점으로 볼 때 이들 각 분야에 대한 중요성의 인식과 더불어 보다 많은 노력을 강구하여야 할 필요성을 알 수 있다. 또한 가설검정 결과에서 이들 중규모 기업들이 신제품개발성과(신제품개발 기간 단축, 제품수명주기에 부합, 제품경쟁력 증대)를 높이기 위해서는 기술경영에 대한 최고경영층의 확고한 의지와 지원이 따라야 하고 사업전략과 기술전략의 연계성을 반드시 고려하여야 하며 신제품개발 일정관리를 체계적으로 하고 개방형 연구개발 시스템을 강화하며 연구개발 인력관리와 특히 PLM시스템 개발과 적용을 동시에 수행하여야 함을 알 수 있다.
객체지향 개발이 보편화되었지만 객체지향 프로젝트를 지원하는 소프트웨어 관리 기법에 대한 연구가 미흡하다. 또한, 기존의 소프트웨어 관리 기법을 객체지향 프로젝트에 적용하는 것 역시 어려움이 있다. 특히, 늘어가는 객체지향 기반의 대형 프로젝트에 적합한 프로젝트 계획 기법에 대한 연구가 미흡하다. 본 논문에서는 객체지향 프로젝트를 위한 관리 요소 중 스케줄링에 대한 체계화된 기법을 제안한다. 시스템의 기능적인 요구사항이 기술된 Use Case 다이어그램을 이용하여 객체지향 프로젝트 스케줄을 도출해 가는 과정을 Use Case 식별, 상호의존성 분석을 통한 초기 PERT 차트 작성, 각 Use Case의 특성 규명, Iteration 개수 결정, Iteration에 Use Case 할당, 유용한 자원과 제약 사항 고려, Revised PERT 차트 작성의 7 단계로 나누어 제안한다. 각 단계에 내한 입력 물과 중간 산출물, 그리고 수행 지침을 제시한다. 본 논문의 프로젝트 스케줄링 기법은 짧은 개발 기간 동안 고품질의 소프트웨어 생산에 목적을 둔 프로젝트 계획 단계에서 효율적인 기법으로 사용된다.
KSII Transactions on Internet and Information Systems (TIIS)
/
제4권5호
/
pp.691-708
/
2010
An important issue of supporting multi-users with diverse quality-of-service (QoS) requirements over wireless networks is how to optimize the systematic scheduling by intelligently utilizing the available network resource while, at the same time, to meet each communication service QoS requirement. In this work, we study the problem of a variety of communication services over multi-media heterogeneous cognitive OFDM system. We first divide the communication services into two parts. Multimedia applications such as broadband voice transmission and real-time video streaming are very delay-sensitive (DS) and need guaranteed throughput. On the other side, services like file transmission and email service are relatively delay tolerant (DT) so varying-rate transmission is acceptable. Then, we formulate the scheduling as a convex optimization problem, and propose low complexity distributed solutions by jointly considering channel assignment, bit allocation, and power allocation. Unlike prior works that do not care computational complexity. Furthermore, we propose the FAASA (Fairness Assured Adaptive Sub-carrier Allocation) algorithm for both DS and DT users, which is a dynamic sub-carrier allocation algorithm in order to maximize throughput while taking into account fairness. We provide extensive simulation results which demonstrate the effectiveness of our proposed schemes.
This paper presents a systematic approach which determines the optimal period to minimize performance measure subject to the schedulability constraints of a real-time control system by formulating the scheduling problem as an optimal problem. The performance measure is derived from the summation of end-to-end response times of processed I/Os scheduled by the static cyclic method. The schedulability constraint is specified in terms of allowable resource utilization. At first, a uniprocessor case is considered and then it is extended to a distributed system connected through a communication link, local-inter network, UN. This approach is applied to the design of an automotive body control system in order to validate the feasibility through a real example. By using the approach, a set of optimal periods can easily be obtained without complex and advanced methods such as branch and bound (B&B) or simulated annealing.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.