• Title/Summary/Keyword: system operation

Search Result 20,265, Processing Time 0.04 seconds

Development of the Automatic Hauling Operation System by Three boats for Anchovy Boat Seine (기선권현망어업의 3척식 자동화 양망시스템 개발)

  • An, Young-Su;Jang, Choong-Sik;Lee, Myeong-Kyu
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.41 no.2
    • /
    • pp.147-155
    • /
    • 2005
  • This study was conducted in order to improve the automatic fishing operation system for anchovy boat seine by comparison with the fishing gear geometry and efficiency using the labor saving nets and the combined type net with midwater trawl. Field experiments were carried out to observe the geometry of nets and improve the fishing operation system by catcher boats. The vertical net opening of fore wing net, square, fore bag net and after bag net of the combined type net were varied in the range of 9.9~12.9. 16.2~28.2, 6.8~12.1 and 9.5~15.2m respectively, when the towing speed was 1.0m/sec and the distance between boats were 100m, 200m, 300m. The vertical net opening of the combined type nets was gradually decreased as function of with increasing the distance between catcher boats. Labor saving net which was maintained the net opening and towing depth stable was more suitable for the automatic hauling operation system by improvement of bag net rather than the combined type nets which was impossible in swallow depth and near to anchovy school. 3 boats hauling operation system of the labor saving net was carried out by crane with power block in 2 catcher boats for improvement of hauling operation and pushing equipment of anchovy cooking system in the processing boat for maintain more anchovy in dry frame. From the results of field experiments, 3 boats hauling operation system with power block and improved cooking system was very 3 boats hauling operation system with power block and improved cooking system was very useful and more practical as hauling time 20~35min and No. of fishermen 12~13 in comparison with the traditional system such as hauling time 30~50 min and No. of fishmen 28~38.

Development of an operation and control software for electro-hydraulic (전자유압식 CVT의 운용 및 제어 소프트웨어 개발과 실시간 제어)

  • Kwan, H. B.;Kim, K. W.;Kim, H. S.;Eun, T.;Park, C. I
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.36-46
    • /
    • 1993
  • In CVT vehicle, the engine speed is completely decoupled from the vehicle speed within the range from maximum transmission ratio to minimum transmission ratio. This allows the engine to operate in optimal state(e.g. best fuel economy or maximum power mode.) In this study, the CVT control algorithm for optimal operation of engine is suggested. In order to implement the real time digital control of electro-hydraulic CVT system, a software called CVTCON has been developed. CVTCON also includes the CVT operation module, (2) system test module, (3) system control module and (4) data management module. By using the CVTCON and the electro-hydraulic CVT system, two modes of experiments were carried out: constant throttle opening mode and acceleration mode. From the experimental result, it was found that the algorithm suggested in this study showed optimal operation of the CVT system.

  • PDF

RELIABLE OPERATION IN COMS GROUND CENTERS

  • Lim, Hyun-Su;Ahn, Sang-Il
    • Proceedings of the KSRS Conference
    • /
    • 2007.10a
    • /
    • pp.496-499
    • /
    • 2007
  • The COMS ground segment will operate the geostationary satellite continuously 24h/7days and deliver processed data to end-users with respect to the predefined schedule without delay. For reliable operation, each COMS ground center has internally dual-configuration for critical systems but impossible to every components. Any unexpected failure or regular maintenance to the single configured antenna system may lead the interruption of COMS service and operation. The natural disaster or external attack can destroy one ground center and the operation will be stopped. Therefore COMS program implements backup system remotely located in other centers. Even considering foreign geostationary systems, it's the best solution guaranteeing consistent system operation against internal failure or external disaster.

  • PDF

A Technical Review on the Structure Design Criteria for a Catenary System with Maximum Design Speed of 200 km/h (200 km/h급 전차선로 구조강도 설계기준에 관한 기술적 검토)

  • 조용현;이기원;권삼영;최강윤;창상훈
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.273-280
    • /
    • 2001
  • In this study, a comparison between the structural design criteria for a catenary system with the maximum design speed of 100km/h and that of 300km/h was performed in order to establish that of 200km/h. According to the result, catenary design criteria for 300km/h operation is more conservative than that for 100km/h operation. This result shows that higher wind pressure and safety factor are adopted to catenary design for 300km/h operation. So, for the purpose of the economic structural design for catenary system, it is necessary to review the adoption possibility of catenary system for 100km/h operation first. In order to review the adoption possibility for catenary system for 100km/h operation, design criteria for 300km/h operation should be chosen for safer catenary structure.

  • PDF

A Study on Improvement Method of the Subway Signalling System Using Automatic Train Operation Device (자동열차운전장치를 이용한 도시철도 신호설비의 개량방안에 관한 연구)

  • Kang Sung-Gu;Choi Seung-Ho;Cho Bong-Kwan
    • Proceedings of the KSR Conference
    • /
    • 2003.10c
    • /
    • pp.145-150
    • /
    • 2003
  • The national subway went under construction in 1971, and after three years of endeavor, Seoul subway line number one opened for traffic in 1974. Line number two went under construction in 1978 and it opened for traffic in 1984. With the use of safety operation for more than 20 years, the life cycle nearly came to an end. Therefore the improvements for the safety operation are unavoidable. The total system should not be affected when the new and conventional systems are overlapped, the system operation is in the initial stage, and it confronts the situation of abnormal operation. However, there is a total lack of experience in construction and improvement for the trains that are in the use of large transport and density headway. In this paper, we propose an improvement method of the subway signalling system using ATO (Automatic Train Operation control scheme) to which the latest Digital ATC is applied, and examine the first application model of ATO system.

  • PDF

Tele-Operation System for Excavator using LTE Communication (LTE 통신을 사용한 건설용 굴삭기 원격조종시스템 개발)

  • Lee, Seung Chol;Kang, Byoung Hun
    • The Journal of Korea Robotics Society
    • /
    • v.16 no.3
    • /
    • pp.232-237
    • /
    • 2021
  • In this research, a real-time tele-operation system for unmanned excavator using the LTE communication system is suggested. The distance between the operator and the excavator is limitless as long as the LTE communication available. The motion and video data of the excavator is synchronized using the Vehicle Control Unit (VCU) and streamed to the operator for immersion feeling. The video is played on the operator's monitor and the motion data is used to regenerate the excavator movement on the developed master platform. In general, a excavator is tele-operated using RF signal and the maximum distance for direct control is limited to within a hundred meter. In this research, the immersion tele-operation system is suggested for excavator operation within an 100ms time delay using the developed master platform, the VCU and LTE communication. A successful test run of the suggested tele-operation system has already been performed between an operator in Songpa (Seoul) and a excavator in Ansan (Gyeonggi-do) which is approximately 35 km apart.

A Study on Bundang-line Urban Transit Operation Mode and Operation Algorithm Analysis of an ATC System (분당선 도시철도 운전모드와 ATC 시스템 동작알고리즘에 관한 연구)

  • Kim Jong-ki;Lee Key-soe
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1247-1252
    • /
    • 2004
  • ATC(Automatic Train Control) system employed in Bundang urban transit is operated in accordance with automatic blocking equipment. Using AF(Audio Frequency) track circuits installed at a block section, the block signal is automatically controlled and the safety of train operation is supported. In this paper, we investigate the operation mode of bundang urban transit and analyze the operation algorithm of ATC on-board system.

  • PDF

A Study of Critical Success Factors in System Development Team Operation (시스템 개발프로젝트에 있어서 팀제도 운영의 성공요인분석)

  • 이재정;박문규
    • The Journal of Information Systems
    • /
    • v.8 no.2
    • /
    • pp.169-185
    • /
    • 1999
  • The overall objective of this study is to empirically investigate organizational/managerial factors affecting system development team operation. The contributions of this research project are two-fold. First, this study examined various organizational/managerial factors that made team operation successful. Second, we presented the key success factors among the identified success factors of team operation. A field investigation of 68 system development teams located around YoungNam area indicates that motivation, leadership and egalitarian team culture are success factors of team operation. Especially, key success factors are leadership and egalitarian team culture.

  • PDF

A Strategy for Balanced Power Regulation of Energy Storage Systems in a Distribution System during Closed-Loop Operation

  • Han, Yoon-Tak;Oh, Joon-Seok;Cha, Jae-Hun;An, Jae-Yun;Hyun, Seung-Yoon;Lee, Jong-Kwan;Seo, In-Yong;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.6
    • /
    • pp.2208-2218
    • /
    • 2017
  • To resolve overload in a distribution system, a distribution system operator (DSO) often performs a load transfer using normally open tie points and switches in the distribution line. During this process, the distribution system is momentarily operated in closed-loop operation. A closed-loop current in the distribution system can cause a power failure due to excess breaking current in the circuit breakers and reclosers. Therefore, it is necessary to calculate the closed-loop current exactly. However, if there are a large number of distributed generation (DG) systems in the distribution system, such as energy storage systems (ESS), they might obstruct the closed-loop operation based on bidirectional power flow. For quick and precise operation of a closed-loop system, the ESS has to regulate the power generation while satisfying closed-loop operation in the worst cases. We propose a strategy for balanced power regulation of an ESS. Simulations were carried out using PSCAD/EMTDC, and the results were compared with calculation results.

Power Control Method for Reducing Circulating Current in Parallel Operation of DC Distribution System

  • Shin, Soo-Cheol;Lee, Hee-Jun;Kim, Young-Ho;Lee, Jung-Hyo;Lee, Taeck Kie;Won, Chung-Yuen
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1212-1220
    • /
    • 2013
  • In general, for a large power system like DC distribution system for buildings, several power converters are modularized for parallel operation. However, in parallel operation, inconsistency of parameters in each module causes circulating current in the whole system. Circulating current is directly related to loss, and, therefore, it is most important for the safety of the power system to supply the suitable current to each module. This paper proposes a control method to reduce circulating current caused during parallel operation. Accordingly, the validity of parallel operation system including response characteristics and normal state was verified by simulation and experiment result.