• Title/Summary/Keyword: surface settlement

Search Result 395, Processing Time 0.026 seconds

A Study on Key Factors of Ground Settlement Due to Shield TBM Excavation using Numerical Analysis and Field Measurement Comparison (수치해석과 현장 계측값 비교를 통한 Shield TBM 지표침하 영향요소 검토)

  • Jun, Gychan;Kim, Donghyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • This study estimates the degree of influence of factors influencing ground surface settlement during tunnel excavation using Shield tunneling trough 3D FE-analyses. Numerical analysis was carried out by considering face pressure, skinplate pressure, excavation length, soil model, element size and soil material properties. Also, Actually constructed shield TBM comparative analysis was conducted by compared with Volume loss model, Pressure model and field measurement data. Skinplate pressure and soil model were the most influential factors, and the analysis results were similar to field measurements when the appropriate skinplate pressure was applied according to the passing stratum.

Safety Evaluation of the Settlement Amount of the Bridge Earthwork Transition Area Using the Ground Penetrating Radar in the Soft Ground Section (연약지반 구간에서 지표투과레이더 활용한 교량 접속부 침하량 안전 평가)

  • Jung, Gukyoung;Jo, Youngkyun;Kim, Sungrae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.17-22
    • /
    • 2022
  • To reduce the bump of bridge/earthwork transition area caused by the settlement of the soft ground during public use, the road agencies have been continuously overlay or repavement at those areas. In this study, the vehicle-mounted ground penetrating radar with 1GHz air-coupled antenna was used to estimate the settlement amount of those areas for nine bridges built in the soft ground. Results shows that it is possible to effectively measure the thickness of pavement up to a depth of 1 m on an asphalt road with ground penetrating radar technology that can inspect under the road surface. Distinctively deformation of the road surface, the variation in the thickness of the pavement measured at bridge/earth transition areas is equivalent to a minimum of 50 mm and a maximum of 600 mm, and there is a risk of cavity in the ground. The difference in the increased pavement thickness is 50~250 mm for each bridge connection, which may cause the differential settlement. In this study, by using the result of the ground penetration radar, a plan for improving drivability and maintenance of the settlement is suggested and applied to the field.

A study on key factors of ground surface settlement due to shield TBM excavation using 3-dimension numerical analysis (3차원 수치해석을 이용한 Shield TBM 굴진시 지표침하 주요 영향요소 분석)

  • Jun, Gy-Chan;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.305-317
    • /
    • 2015
  • This paper is to perform 3-dimensional numerical analysis considering face pressure, backfill pressure, excavation length, soil model and element size for selecting key factors of ground surface settlement due to shield TBM advancement. According to the numerical analysis results, backfill pressure and soil model are governing factors inducing ground surface settlement. To complement this study, the ground conditions and characteristics of the boring machine will be considered using numerical analysis.

Characteristics of Structure Settlement due to Urban Railway Construction on Reclaimed Land (해안매립지반의 도시철도 시공에 따른 구조물 침하 특성 분석)

  • Shin, Eun-Chul;Rim, Yong-Kwan;Park, Jeong-Jun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.1
    • /
    • pp.23-33
    • /
    • 2012
  • The stability of urban railway foundation can be a problem due to the excessive settlement. The settlement at the base of railway is monitored by the installed settlement gauges. The piezometer and pore water pressure measurement device are installed to measure the variation of pore water pressure and ground water table during the continuous pullout of sheet piles which were used for the braced cut. The settlement of railway is predicted with using the computer program CAIN RDA. The input data for the numerical analysis are obtained from the field soil exploration data and soil properties. The surcharged load from landscaping over the ground surface and the weight of train are taken into account for the estimation of settlement. As a result of numerical analysis, the range of settlement for six different Sites is from 5.94 cm to 12.77 cm. Thus, the settlement level at Site 2 is occurred 12.77 cm which is higher than the allowable settlement of 10 cm.

Evaluation of surface displacement equation due to tunnelling in cohesionless soil

  • Mazek, Sherif A.
    • Geomechanics and Engineering
    • /
    • v.7 no.1
    • /
    • pp.55-73
    • /
    • 2014
  • The theoretical predictions of ground movements induced by tunnelling are usually based on the assumptions that the subsoil has the same soil densities. The theoretical prediction does not consider the impact of different sand soil types on the surface settlement due to tunnelling. The finite elements analysis (FEA) considers stress and strength parameters of the different sand soil densities. The tunnel construction requires the solution of large soil-structure interaction problem. In the present study, the FEA is used to model soil-tunnel system performance based on a case study to discuss surface displacement due to tunnelling. The Greater Cairo metro tunnel (Line 3) is considered in the present study as case study. The surface displacements obtained by surface displacement equation (SDE) proposed by Peck and Schmidt (1969) are presented and discussed. The main objective of this study is to capture the limitations of the parameters used in the SDE based on the FEA at different sand soil densities. The study focuses on the parameters used in the SDE based on different sand soil densities. The surface displacements obtained by the FEA are compared with those obtained by the SDE. The results discussed in this paper show that the different sand soil densities neglected in the SDE have a significant influence on the surface displacement due to tunnelling.

Model Test for the Behavior of Retaining Walls Under Surcharge Load (상재하중을 받는 토류벽체의 거동에 관한 모형실험 연구)

  • Jung, On-Su;Huh, Kyung-Han
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.4 s.19
    • /
    • pp.49-57
    • /
    • 2005
  • The purpose of this study is to closely examine the influence of the surcharge load applied to the retaining wall through some model tests, in which wall stiffness in each stage of excavation, horizontal displacement of the retaining wall and surface displacement of the backfill according to wall stiffness and ground conditions, and change and distribution of the earth pressure applied to it were measured and their values were produced, then these values were mutually compared with their theoretical values and their values after analysis of the data obtained at the field, and they were analytically studied, in order to closely examine the influence of the surcharge load applied to the retaining wall. Findings from this study are as follows: The shape of ground surface settlement curve on the model ground under surcharge load, different from the distribution curve of regular probabilities which is of a shape of ground surface settlement under no surcharge load, appears in that settlement in an arching shape shows where the center part of surcharge load shows the maximum settlement. In examining the maximum horizontal displacement with the surcharge load applied to each stage of excavation, it occured at the point of 0.8H(excavation depth) when finally excavated. Regarding the range in which the displacement of the retaining wall increases according to application of surcharge load, the increment of displacement showed till the point of depth which is of two times of the distance of load from the upper part of the wall. Also since each displacement of the foundation plate caused by the ground surface settlement according to each stage of excavation occured most significantly at the final stage. Also since regarding wall stiffness, the wall of its thickness of 4mm(flexible coefficient $p:480m^3/t$), produced maximum 3 times of wall stiffness than its thickness of 9mm(flexible coefficient $p: 40m^3/t$), it was found out that influence of wall stiffness is so significant.

Comparison of Ground Movements in A Single Ground Layer and Multiple Ground Layers due to Nearby Tunnel Excavation (터널굴착으로 발생한 주변 단일지층 및 복합지층 지반에서의 지반변위에 대한 거동비교)

  • Son, Moorak;Yun, Jongcheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3C
    • /
    • pp.167-174
    • /
    • 2010
  • In this study, numerical analysis has been performed to compare the ground movements in a single ground layer and multiple ground layers due to nearby tunnel excavation. The numerical analysis has been conducted in the different ground layer conditions considering different construction conditions (volume loss at excavation face), and the results of the maximum surface settlement and horizontal displacement have been compared considering the ground layer and construction conditions. In addition, the maximum surface settlement from the numerical analysis has been compared with the maximum settlement at tunnel crown considering the ground layer and construction conditions, and the maximum surface settlement has been also compared with the maximum horizontal displacement with the ground layer conditions. Besides, the volume loss($V_L$) at tunnel excavation face has been compared with the total surface settlement volume($V_s$) with the variation of ground layer condition. The results from the numerical analysis have been compared with field measurements and by this comparison it is believed that the numerical results in this study can be utilized practically in analyzing the nearby ground behavior in different ground layer and construction conditions due to tunnel excavation.

A Study on the Prediction Method of Ground Displacement by Deep Excavation (깊은굴착에 의한 지반변위의 예측방법에 관한 연구)

  • 안종필;박경호
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.1-21
    • /
    • 2002
  • Recently, the rapid industrialization and urbanization of the country due to a high economic growth, require optimization, usage and the expansion of underground space. Therefore the consturction of large and deep basements takes place in braced excavated area where their earth retaining structures cause many problems such as settlement and damages of nearby buildings and underground utilities. this study deals with the influence distance of settlement and the amount for settlement based on the measurement which were obtained at five excavation construction sites. Maximum ground surface settlement, (0.28∼0.3)(%)H utilizing depth, is similar to the measurement and the value by Clough's method. It was found that the settlement and the influence distance of settlement calculated by Clough's method were rational.

Effect of Base Roughness of Footing on Settlement Characteristics of Footing (기초저면의 조도가 기초의 침하 특성에 미치는 영향)

  • Yoo, Nam-Jae;Kim, Young-Gil;Park, Byung-Soo
    • Journal of Industrial Technology
    • /
    • v.12
    • /
    • pp.15-23
    • /
    • 1992
  • This research is to investigate the effect of base roughness of footing on characteristics of load-settlement curve. Parametric experiments of small scaled model test were performed with changing the properties of base roughness of model footing; Gluing the vinyl, aluminum, sand paper, sand beneath the model footing surface. The width of model footing and relative density of soil foundation were also changed to investigate their effects on settlement characteristics of footing. The ultimate bearing capacity as well as the initial slope of load-settlement curve obtained from test results were compared with those from limit equilibrium methods proposed by Terzaghi, Hansen and Meyerhof. From test results, it was confirmed that the base roughness affected the failure mechanisms of showing different shapes of slip lines formed beneath the footing.

  • PDF

Numerical Analysis of Tunnelling-Induced Ground Movements (터널굴착으로 발생한 지반거동에 대한 수치해석적 분석)

  • Son, Moo-Rak;Yun, Jong-Cheol
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.396-403
    • /
    • 2009
  • Numerical analysis has been performed to estimate maximum settlement and maximum horizontal displacement due to tunnel excavation varying ground condition, tunnel depth and diameter, and construction condition (volume loss at excavation face). The maximum surface settlement from the numerical analysis has been compared with the maximum settlement at tunnel crown considering ground condition, tunnel depth and diameter, and construction condition, and it has been also compared with the maximum horizontal displacement. The results from the numerical analysis have been compared with field measurements to confirm the applicability and validity of the results and by this comparison it is believed that the numerical results in this study can be utilized practically in analyzing the ground movements due to tunnel excavation.

  • PDF