• Title/Summary/Keyword: supply water

Search Result 3,509, Processing Time 0.025 seconds

Evaluation of Supplying Instream Flow by Operation Rule Curve for Heightening Irrigation Reservoir (이수관리곡선에 의한 증고저수지의 하천유지유량 공급 가능성 평가)

  • Lee, Jae-Nam;Noh, Jae-Kyoung
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.481-490
    • /
    • 2010
  • Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water levels will be heightened from EL. 100.1 m to EL. 102.1 m, and total storages from 21.75 $Mm^3$ to 26.67 $Mm^3$. The simulation for reservoir inflow was conducted by DAWAST model. The annual average irrigation water was estimated to 33.19 $Mm^3$ supplied to 2,975 ha and the instream flows could be allocated with 0.14 mm/d from October to April with annual average of 2.52 $Mm^3$. The operation rule curve was drawn using inflow, irrigation, and instream flow requirements data. The reservoir water storage was simulated on a daily basis in case of both normal and withdrawal limit operation. In case of normal operation, the annual average irrigation water supply increased from 31.95 $Mm^3$ to 33.32 $Mm^3$, the instream water supply from 2.40 $Mm^3$ to 2.44 $Mm^3$, the water storages from 15.74 $Mm^3$ to 19.88 $Mm^3$, and the water supply reliability from 77.3 % to 81.6 %. In case of operation with withdrawal limit, the amount of instream water supply was 2.52 $Mm^3$ from reservoir regardless of the condition while the water storage increased from 16.77 $Mm^3$ to 20.65 $Mm^3$. The irrigation water supply capacity was appropriate for the case of normal operation with 2 m heightened condition. The present instream water supply capacity was 35,000 $m^3$/d (6.86 $Mm^3$/y) while 42,000 $m^3$/d (8.36 $Mm^3$/y) in 2 m heightened condition in case of withdrawal limit operation.

Mineral Components of Water Supply Plants and Spring Waters in Northern Gyeonggi Area (경기북부지역 정수장 및 약수터의 미네랄 성분 분포 연구)

  • Song, Hee-Il;Lim, Han-Su;Park, Gyoung-Su;Park, Hyun-Goo;Lee, Hyun-Jin;Jo, Mi-Hyun;Kim, Young-Yeon;Oh, Jo-Gyo
    • Journal of Environmental Health Sciences
    • /
    • v.45 no.3
    • /
    • pp.238-246
    • /
    • 2019
  • Objective: The purpose of this study was to investigate the distribution of mineral components, health and taste index for water supply plants, spring water located in northern Gyeonggi area and bottled waters in market to analyze Ca, K, Mg Na, Si, $F^-$ and $SO_4{^{2-}}$. Method: The samples were source and tap water in 15 water supply plants over 9 river basin, 172 spring water and 20 bottled water. The Ca, K, Mg Na and Si were analyzed by ICP-OES. The $F^-$ and $SO_4{^{2-}}$ were determined by Ion Chromatograph. Then, taste and health index were calculated using Hashimoto equation. Results: The average concentration of major minerals showed in same order of Ca > Na > Mg > K for all kinds of drinking water from water supply plants, spring waters and bottled waters. Total concentration of major minerals (Ca, K, Mg, Na) was calculated that showed 26.79 mg/L of tap water, 21.81 mg/L of spring water, 32.94 mg/L of bottled water on average. So, the spring waters indicated the lowest minerals sum. The tap water from water supply plants was categorized to Group I, II for 33.3, 44.4% according to K-index and O-index. Otherwise, spring water was classified as Group I, II for 44.0, 46.3%. Conclusion: According to the results of K and O-index, water from water supply plant showed higher K-index which means good for the health. Otherwise, spring water indicated higher O-index that people can feel more delicious than tap water. Futhermore, the mineral distribution of source water from water supply plants and spring water had indicated high correlation with geological effect.

Development of a Concentration Prediction Model for Disinfection By-product according to Introduce the Advanced Water Treatment Process in Water Supply Network (고도정수처리에 따른 상수도 공급과정에서의 소독부산물 농도 예측모델 개발)

  • Seo, Jeewon;Kim, Kibum;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.5
    • /
    • pp.421-430
    • /
    • 2017
  • In this study, a model was developed to predict for Disinfection By-Products (DBPs) generated in water supply networks and consumer premises, before and after the introduction of advanced water purification facilities. Based on two-way ANOVA, which was carried out to statistically verify the water quality difference in the water supply network according to introduce the advanced water treatment process. The water quality before and after advanced water purification was shown to have a statistically significant difference. A multiple regression model was developed to predict the concentration of DBPs in consumer premises before and after the introduction of advanced water purification facilities. The prediction model developed for the concentration of DBPs accurately simulated the actual measurements, as its coefficients of correlation with the actual measurements were all 0.88 or higher. In addition, the prediction for the period not used in the model development to verify the developed model also showed coefficients of correlation with the actual measurements of 0.96 or higher. As the prediction model developed in this study has an advantage in that the variables that compose the model are relatively simple when compared with those of models developed in previous studies, it is considered highly usable for further study and field application. The methodology proposed in this study and the study findings can be used to meet the level of consumer requirement related to DBPs and to analyze and set the service level when establishing a master plan for development of water supply, and a water supply facility asset management plan.

A Study on the Total Head Decision of Pump for Regional Water Supply Facilities (광역상수도용 펌프의 전양정 결정에 관한 연구)

  • Kim, Kyung-Yup;Suh, Sang-Ho;Lee, Jung-Woo;Roh, Hyung-Woon;Kim, Sang-Gyun
    • 유체기계공업학회:학술대회논문집
    • /
    • 2001.11a
    • /
    • pp.165-170
    • /
    • 2001
  • An extensive range of pumping facilities are employed in the regional water supply system in metropolitan areas, and optimization and the systematic combination of the Pump facilities have direct bearing on the stability and economy of the water supply system concerned. These systems must be able to guarantee stability, efficiency and offer high reliability. Preparation of metropolitan area regional water supply system construction project must include a basic plan which takes into account the suitability of pumping facilities to be used, the environment in which facilities will be installed, man-power requirements and basic operational and management policies. This paper contains over-all analysis of the management of metropolitan area regional water supply systems as like Jayang, Paldang 1st pump station. In the study, it aims to prepare counterplan which will be operated and managed the pump upon the operational conditions and to suggest the proposal for water facilities codes to decides total head of pump in Korea.

  • PDF

An Evaluation Method of Water Supply Reliability for a Dam by Firm Yield Analysis (보장 공급량 분석에 의한 댐의 물 공급 안전도 평가기법 연구)

  • Lee, Sang-Ho;Kang, Tae-Uk
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.5 s.166
    • /
    • pp.467-478
    • /
    • 2006
  • Water supply reliability for a dam is defined with a concept of probabilistic reliability. An evaluation procedure of the water supply reliability is shown with an analysis of long term firm yield reliability. The water supply reliabilities of Soyanggang Dam and Chungju Dam were evaluated. To evaluate the water supply reliability, forty one sets of monthly runoff series were generated by SAMS-2000. HEC-5 model was applied to the reservoir simulation to compute the firm yield from a monthly data of time series. The water supply reliability of the firm yield from the design runoff data of Soyanggang Dam is evaluated by 80.5 % for a planning period of 50 years. The water supply reliability of the firm yield from the historic runoff after the dam construction is evaluated by 53.7 %. The firm yield from the design runoff is 1.491 billion $m^3$/yr and the firm yield from the historic runoff is 1.585 billion $m^3$/yr. If the target draft Is 1.585 billion $m^3$/yr, additional water of 0.094 billion $m^3$ could be supplied every year with its risk. From the similar procedures, the firm yield from the design runoff of Chungju Dam is evaluated 3.377 billion $m^3$/yr and the firm yield from the historic runoff is 2.960 billion $m^3$/yr. If the target draft is 3.377 billion $m^3$/yr, water supply insufficiency occurs for all the sets of time series generated. It may result from overestimation of the spring runoff used for design. The procedure shown can be a more objective method to evaluate water supply reliability of a dam.

Evolution of Water supply system! Smart Water Management for customer - Smart Water City Pilot Project - (수도 서비스의 진화! 소비자 중심의 스마트 물 관리 - Smart Water City 시범사업 -)

  • Kim, Jae-Bog
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.4
    • /
    • pp.511-517
    • /
    • 2015
  • Korea's modern waterworks began with construction of DDukdo water treatment plant in 1908 and has been growing rapidly along with the country's economic development. As a result, water supply rates have reached 98.5% based on 2013. Despite multilateral efforts for high-quality water supply, such as introduction of advanced water treatment process, expansion of waterworks infrastructure and so on, distrust for drinking tap water has been continuing and domestic consumption rate of tap water is in around 5% level and extremely poor comparing to advanced countries such as the United States(56%), Japan(52%), etc. Recently, the water management has been facing the new phase due to water environmental degradation caused by climate change, aging facilities, etc. Therefore, K-water has converted water management paradigm from the "clean and safe water" to the "healthy water" and been pushing the Smart Water City(SWC) Pilot Project in order to develop and spread new water supply models for consumers to believe and drink tap water through systematic water quality and quantity management combining ICT in the whole water supply process. The SWC pilot projects in Pa-ju city and Go-ryeong county were an opportunity to check the likelihood of the "smart water management" as the answer to future water management. It is needed to examine the necessity of smart water management introduction and nationwide SWC expansion in order to improve water welfare for people and resolve domestic & foreign water problems.

Assessment of Water Distribution and Irrigation Efficiency in Agricultural Reservoirs using SWMM Model (SWMM 모형을 이용한 농업용 저수지 용수분배 모의 및 관개효율 평가)

  • Shin, Ji-Hyeon;Nam, Won-Ho;Bang, Na-Kyoung;Kim, Han-Joong;An, Hyun-Uk;Do, Jong-Won;Lee, Kwang-Ya
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.3
    • /
    • pp.1-13
    • /
    • 2020
  • The management of agricultural water can be divided into management of agricultural infrastructure and operation to determine the timing and quantity of water supply. The target of water management is classified as water-supply facilities, such as reservoirs, irrigation water supply, sluice gate control, and farmland. In the case of agricultural drought, there is a need for water supply capacity in reservoirs and for drought assessment in paddy fields that receive water from reservoirs. Therefore, it is necessary to analyze the water supply amount from intake capacity to irrigation canal network. The analysis of the irrigation canal network should be considered for efficient operation and planning concerning optimized irrigation and water allocation. In this study, we applied a hydraulic analysis model for agricultural irrigation networks by adding the functions of irrigation canal network analysis using the SWMM (Storm Water Management Model) module and actual irrigation water supply log data from May to August during 2015-2019 years in Sinsong reservoir. The irrigation satisfaction of ponding depth in paddy fields was analyzed through the ratio of the number of days the target ponding depth was reached for each fields. This hydraulic model can assist with accurate irrigation scheduling based on its simulation results. The results of evaluating the irrigation efficiency of water supply can be used for efficient water distribution and management during the drought events.

The Analysis on the Correlationship for Rousing Demands and Water Supply Ratio (주택수요 예측을 위한 주택량과 상수도보급률의 상관성 분석)

  • Yang Seung-Won;Park Keun-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.61-68
    • /
    • 2005
  • The analysis described in this paper indicate the existence of a correlationship for housing demand and water supply ratio. Using subjective statistical data for the trend of population on regional area, water supply ratio and the number of households, the paper examines the correlationship of forecasting factors for apartments in the ways in which the tendency of demands for apartments and water supply ratio have been analyzed within small and mediumsized city. Differences in the correlationship on the several scale of a city are also taken into account in the analysis. The summary table of the tendency for housing supplies, population and water supply ratio on each scale of a city was generated using data from LAIB. This study attempted to address certain factors that are measurable within a specified paradigm, in order to investigate the extent to which the expectation of apartment supplies can be estimated from the correlationship of water supply ratio. Therefore, it can be suggested that the limited scale of a city are set to maintain the correlationship for housing demands and water supply ratio.

Comparison of Water Quality Between Private and Simple-Piped Drinking Water Supply in Rural Community (농촌지역 개인소유 음용수와 간이상수도의 수질에 대한 비교 연구)

  • 이진헌;이인숙
    • Journal of Environmental Health Sciences
    • /
    • v.20 no.1
    • /
    • pp.54-61
    • /
    • 1994
  • This study was carried out to investigate the degree of contamination in private-drinking water supply (PDWS) and simple-piped water supply (SPWS), and to compare of water quality between them for 3 years from 1990 to 1992. The results of the study were as follows: 1. Private-drinking water supply (PDWS) (1) Field-Site (ㄱ) The items which were very significantly over the criteria (p<0.01), were temp., pH, NO-N, standard plate count (S.P.C.) and Coliform. (ㄴ) No. of households which were over the criteria, were 11.2~51.7% in temp., pH, NH$_3$-N and NO$_2$-N, and 83.1~93.3% in NO-N, S.P.C. and Coliform. (2) Moutain-Site (ㄱ) The items which were over the criteria, were NO$_2$-N (p<0.05), S.P.C. (p<0.01) and Coliform (p<0.01). (ㄴ) No. of households which were over the criteria, were 33.6 ~ 75.6% in NO$_2$-N, S.P.C. and Coliform. (3) No. of households which were fit to the criteria of all items, were 9.0% in field-site and 14.1% in mountain-site. 2. Simple-piped water supply (SPWS) (1) The items which were very significantly over the critera (p<0.01), were standard plate count (S.P.C.) and Coliform. (2) The water qualities of adjacent and remote samples were better than those of source samples. (3) Residual chloride was not detected in any sample. In conclusion, rural community requires to be continually performed the policy of safety drinking water supply, and to be devised an epoch-making counterplan for the level-up of simple-piped water supply (SPWS), espically on the method of disinfection.

  • PDF