• Title/Summary/Keyword: supply chain planning

Search Result 203, Processing Time 0.025 seconds

A Fuzzy Multi-Objective Linear Programming Model: A Case Study of an LPG Distribution Network

  • Ozyoruk, Bahar;Donmez, Nilay
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.3
    • /
    • pp.319-329
    • /
    • 2014
  • Supply chain management is a subject that has an increasing importance due to the developments in the global markets and technology. In this paper, a fuzzy multi-objective linear programming model is developed for the supply chain of a company dealing with procurement, storage, filling, and distribution of liquefied petroleum gas (LPG) in Turkey. The model intends to determine the quantities of LPG to be procured, stored, filled to cylinders, and transported between the plants and demand centers for six planning periods. In this model, which aims to minimize both total costs (sum of procurement, storage, filling, and transportation costs) and total transportation distances, demand quantities of the main demand centers and decision maker's aspiration levels about objective functions are fuzzy. After comparing the results obtained from the model with those obtained by using different methods, it is concluded that the proposed method can be applied to real world problems practically and it may be used in this type of problems in order to generate an efficient solution.

A Study on Production Planning with Reliable Satisfaction for Due Date(Focused on a Automobile Components Manufacturer) (납기 신뢰성 확보를 위한 생산계획 수립에 관한 연구(자동차 부품업체 중심으로))

  • Choi, Yoon-Jeong;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.139-147
    • /
    • 2006
  • In case of domestic automobile manufacturers introducing and running a make-to-order production system, JIT system is to provide a necessary number of components at a right place in time which is a specific supply chain management, is different from other occupations. This study is for establishing a efficient production planning and finding a management method to correspond with a manufacturing system and diversified supply chain management and building an information system to support it. For this, we analyze the relevant business process and utilize various informations occur in supply chain of domestic automobile components manufacturer. It will contribute to not only reliability improvement of production management system but also satisfaction for due date of products.

Implementation of a CPFR Based on a Business Process Management System (비즈니스 프로세스 관리 시스템을 기반으로 한 CPFR의 구현)

  • Han, Yong-Ho
    • The Journal of Information Systems
    • /
    • v.17 no.4
    • /
    • pp.321-340
    • /
    • 2008
  • Collaborative planning, forecasting and replenishment (CPFR) is the most recent successful management initiative that provides supply chain collaboration. By adopting CPFR, companies can dramatically improve the effectiveness of supply chain. The CPFR process has three major sub-processes; planning, forecasting and replenishment, which are formed by a number of steps. Despite the existence of a detailed and comprehensive process model, which is published by the Voluntary Interindustry Commerce Standards Association, in practice CPFR can take a number of different forms. Therefore, this research suggests that business process management system (BPMS) can be utilized as a base system on which a CPFR is consistently constructed and implemented, regardless of a number of its possible forms. We illustrate how a CPFR protype is implemented by using a BPMS and then describe how the prototype is agilely extended to adopt a variety of changes of CPFR collaboration process.

Development of Supply Chain Management Simulator (SCM 시뮬레이터 개발)

  • Lim, Seok Jin;Mo, Chang-U
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.04a
    • /
    • pp.355-365
    • /
    • 2013
  • Many manufacturing industries need more efficient organization since the customer expects a greater response to orders Due to this increased expectation, a supply chain management (SCM) has become one of the most important methods of competitive advantage in business today. This study has developed a simulator for the supply chain management problem. The simulator designed to help determine considering to the capacities and the costs of production and distribution facilities. The simulator developed using commercial simulation tool ARENA and the results of computational experiments for a simple example were given and discussed to validate the developed simulator. The simulator can be used to decide an realistic production-distribution planning in the area.

  • PDF

A Study on the Production Planning for Satisfaction of the Due Date - with a Automobile Components Manufacturer (납기 안정성 확보를 위한 생산계획 수립에 관한 연구 - 자동차부품업체 중심으로)

  • Choi, Yoon-Jeong;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.193-200
    • /
    • 2006
  • In case of domestic automobile manufacturers introduce and run a order production method, JIT system is to provide a necessary number of components for a right place timely which is a specific supply chain management is different from other occupations. This study is for establishing a efficient production planning and finding a management method to correspond with a manufacturing system and diversified supply chain management and building an information system to support it. For this, analyze the relevant business process and utilize various informations occur in supply chain of domestic automobile components manufacturer. It will contribute to not only reliability improvement of production management system but also satisfaction for due date of products.

  • PDF

A Hybrid Heuristic Approach for Supply Chain Planningwith n Multi-Level Multi-Item Capacitated Lot Sizing Model (자원제약하의 다단계 다품목 공급사슬망 생산계획을 위한 휴리스틱 알고리즘)

  • Shin Hyun-Joon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 2006
  • Planning distributed manufacturing logistics is one of main issues in supply chain management. This paper proposes a hybrid heuristic approach for the Multi-Level, multi-item Capacitated Lot Sizing Problem (MLCLSP) in supply chain network. MLCLSP corresponds to a mixed integer programming (MIP) problem. With integer variable solutions determined by heuristic search, this MIP problem becomes linear program (LP). By repeatedly solving the relaxed MIP problems with a heuristic search method in a hybrid manner, this proposed approach allocates finite manufacturing resources fur each distributed facilities and generates feasible production plans. Meta heuristic search algorithm is presented to solve the MIP problems. The experimental test evaluates the computational performance under a variety of problem scenarios.

  • PDF

A Study on a Real Time Freight Delivery Planning for Supply Center based on GIS (GIS기반의 실시간 통합화물운송시스템 계획에 관한 연구)

  • 황흥석;김호균;조규성
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.75-89
    • /
    • 2002
  • According to the fast-paced environment of information technology and improving customer services, the design activities of logistics systems improve customer centric services and delivery performance implementing e-logistics system. The fundamental design issues that arise in the delivery system planning are optimizing the system with minimum cost and maximum throughput and service level. This study is concerned with the integrated model development of delivery system with customer responsive service level for DCM, Demand Chain Management. We used a two-step approach for this study. First, we formulated the supply. center facility planning using stochastic set-covering problem and assigned the customers to the supply center using clustering algorithm. Second, we developed vehicle delivery planning for a supply center based on GIS, GIS-VRP. Also we developed a GUI-type computer program for proposed method for supply center problem using GIS and Geo-DataBase of Busan area. The computational results showed that the proposed method was very effective on a set of test problems.

Study of Supply-Production-Distribution Routing in Supply Chain Network Using Matrix-based Genetic Algorithm (공급사슬네트워크에서 Matrix-based 유전알고리즘을 이용한 공급-생산-분배경로에 대한 연구)

  • Lim, Seok-Jin;Moon, Myung-Kug
    • Journal of the Korea Safety Management & Science
    • /
    • v.22 no.4
    • /
    • pp.45-52
    • /
    • 2020
  • Recently, a multi facility, multi product and multi period industrial problem has been widely investigated in Supply Chain Network(SCN). One of keys issues in the current SCN research area involves minimizing both production and distribution costs. This study deals with finding an optimal solution for minimizing the total cost of production and distribution problems in supply chain network. First, we presented an integrated mathematical model that satisfies the minimum cost in the supply chain. To solve the presented mathematical model, we used a genetic algorithm with an excellent searching ability for complicated solution space. To represent the given model effectively, the matrix based real-number coding schema is used. The difference rate of the objective function value for the termination condition is applied. Computational experimental results show that the real size problems we encountered can be solved within a reasonable time.

A Case Study of Supply Chain Management System of LG Siltron, Korea (실리콘 웨이퍼 공급사슬관리 시스템 구축에 관한 연구: (주) LG 실트론 사례를 중심으로)

  • Lee, Ho-Chang
    • IE interfaces
    • /
    • v.18 no.3
    • /
    • pp.234-246
    • /
    • 2005
  • A silicon wafer is a highly customized product made to the individual order varying its electrical and physical characteristics. Therefore, it has distinctive supply chain structure that is different from highly standardized commodity product. For high-volume/high-standardization product, it is general that a main stream of information flow initiated by the production planning of the manufacturers is usually directed to push both ways in a supply chain: upstream to the suppliers and downstream to the customers. Contrastingly, for low-volume/high-customization product, the information flow triggered by the fluctuating customer demand usually propagates upward to the suppliers through the manufacturers. Furthermore, for R &D based hi-technology product like silicon wafer, the interactive information feedback mechanism between manufacturer and customer, which is essential to the new product development process, is to be embedded in the supply chain. This article is a case study of supply chain management system of LG Siltron, a major Korean silicon wafer manufacturer. The SCM system entails special information structure fitting well typical high-variety/high-customization product, and also gives application possibilities to the R&D based high-technology product made to the individual customer order.

A Case Study on the Virtual Process for Order-Management of a Process-Oriented Parts-Supply Company (장치산업형 부품공급업체의 주문관리를 위한 가상 프로세스에 관한 사례 연구)

  • Choe, Gyeong-Il
    • Asia pacific journal of information systems
    • /
    • v.7 no.1
    • /
    • pp.151-163
    • /
    • 1997
  • This paper deals with a reference model for a process-oriented parts supply company From the view point of SCM(Supply Chain Management), the model focuses on the integration of order management and manufacturing information. The model, considering the characteristics of manufacturing processes, separates the execution level from the planning level, and then introduces a virtual process to efficiently link the two levels. The model is operated to maximize its flexibility by the separation of planning and execution. A case study shows that our model significantly increases the productivity of the company.

  • PDF