• Title/Summary/Keyword: supervisory control system

Search Result 262, Processing Time 0.025 seconds

Wide-Area SCADA System with Distributed Security Framework

  • Zhang, Yang;Chen, Jun-Liang
    • Journal of Communications and Networks
    • /
    • v.14 no.6
    • /
    • pp.597-605
    • /
    • 2012
  • With the smart grid coming near, wide-area supervisory control and data acquisition (SCADA) becomes more and more important. However, traditional SCADA systems are not suitable for the openness and distribution requirements of smart grid. Distributed SCADA services should be openly composable and secure. Event-driven methodology makes service collaborations more real-time and flexible because of the space, time and control decoupling of event producer and consumer, which gives us an appropriate foundation. Our SCADA services are constructed and integrated based on distributed events in this paper. Unfortunately, an event-driven SCADA service does not know who consumes its events, and consumers do not know who produces the events either. In this environment, a SCADA service cannot directly control access because of anonymous and multicast interactions. In this paper, a distributed security framework is proposed to protect not only service operations but also data contents in smart grid environments. Finally, a security implementation scheme is given for SCADA services.

Evaluation of Robust Performance of Fuzzy Supervisory Control Technique (퍼지관리제어기법의 강인성능평가)

  • Ok, Seung-Yong;Park, Kwan-Soon;Koh, Hyun-Moo
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.5 s.45
    • /
    • pp.41-52
    • /
    • 2005
  • Using the variable control gain scheme on the basis of fuzzy-based decision-making process, Fuzzy supervisory control (FSC) technique exhibits better control performance than linear control technique with one static control gain. This paper demonstrates the effectiveness of the FSC technique by evaluating the robust performance of the FSC technique under the presence of uncertainties in the models and the excitations. Robust performance of the FSC system is compared with that of optimally designed LQG control system for the benchmark cable-stayed bridge presented by Dyke et al. Parameter studies on the robust performance evaluation are carried out by varying the stiffness of the bridge model as well as the magnitudes of several earthquakes with different frequency contents. From the comparative study of two control systems, FSC system shows the enhanced control performance against various magnitudes of several earthquakes while maintaining lower level of power required for controlling the bridge response. Especially, FSC system clearly guarantees the improved robust performance of the control system with stable reduction effects on the seismic responses and slight increases in total power and stroke for the control system, while LQG control system exhibits poor robust performance.

Fuzzy Control Through Singularity (특이성에 대한 퍼지 제어)

  • 이혜린;정정주
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.356-356
    • /
    • 2000
  • For irregular nonlinear systems, switching controlk form is proposed recently. This control law is designed to overcome the singularities through the scheme that switches between an approximate tracking law close to the singularities, and an exact tracking law away from the singularities. But, that form has problems which may break the system's stability through unstable control input value at switching procedure. In this paper, We propose new switching control law which supervises approximate tracking control law and exact tracking control law by fuzzy rules to overcome unstability problem in switching procedure.

  • PDF

The development of industrial secure L2 switch and introduction example for management and security improvement of supervisory control network in purification plant (정수장 감시제어망의 관리와 보안개선을 위한 산업용 보안 L2스위치 개발 및 적용사례)

  • Kim, Yunha;Yu, Chool;Oh, Eun;Kim, Chanmoon;Park, Ikdong;Kim, Yongseong;Choi, Hyunju
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.33 no.5
    • /
    • pp.329-339
    • /
    • 2019
  • Recently, the advancement of information and communication technology(ICT) is expanding the connectivity through Internet of Things(IoT), and the media of connection is also expanding from wire/cable transmission to broadband wireless communication, which has significantly improved mobility. This hyperconnectivity has become a key element of the fourth industrial revolution, whereas the supervisory control network of purification plants in korea is operated as a communication network separated from the outside, thereby lagging in terms of connectivity. This is considered the best way to ensure security, and thus there is hardly any consideration of establishing alternatives to operate an efficient and stable communication network. Moreover, security for management of a commercialized communication network and network management solution may be accompanied by immense costs, making it more difficult to make new attempts. Therefore, to improve the conditions for the current supervisory control network of purification plants, this study developed a industrial security L2 switch that supports modbus TCP(Transmission Control Protocol) communication and encryption function of the transmission section. As a result, the communication security performance improved significantly, and the cost for implementing the network management system using Historical Trend and information of HMI(Human Machine Interface) could be reduced by approximately KRW 200 million. The results of this study may be applied to systems for gas, electricity and social safety nets that are infrastructure communication networks that are similar to purification plants.

Improvement of RGS performance in SCADA system (SCADA 시스템 RGS 성능개선연구)

  • 우희곤;최성수
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1988.10a
    • /
    • pp.674-677
    • /
    • 1988
  • SCADA (Supervisory Control And Data Acquisition) system for control and supervision of power system is now being operated in KEPCO with high performance. But the performance of RGS(Report Generating System) is comparatively insufficient because the SCADA system was produced for special purpose performing in real time. Therefore, we have performed this study applied for the purpose of processing the statistic data of power network and improving facilities and availabilities of the system.

  • PDF

Time-Coobservability in the Decentralized Supervisory Control of Timed Discrete Event Systems (시간 이산 사건 시스템의 분산 관리 제어에서 시간-상호관측가능성)

  • Park, Seong-Jin;Choi, Ho-Lim
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.15 no.4
    • /
    • pp.396-399
    • /
    • 2009
  • This paper presents the notion of time-coobservability as a core condition far the existence of a decentralized supervisor achieving a given language specification in a timed discrete event system (TDES). A TDES is modeled by the framework of Brandin & Wonham [5], and the decentralized supervisory control architecture presented is extended from the untimed architecture of Yoo & Lafortune [1]. To develop the time-coobservability of a language specification, specifically this paper presents the C&P time-coobservability and D&A time-coobservability in the consideration of the event tick and forcing mechanism of decentralized supervisors.

Analysis of the Cause of the 2008 Financial Crisis using the Supervisory Control Theory (관리제어이론을 이용한 2008년 금융위기의 원인 해석)

  • Park, Seong-Jin
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.20 no.10
    • /
    • pp.995-1001
    • /
    • 2014
  • In the aftermath of the financial crisis of 2008, while numerous members of the general public lost their homes and jobs, many of the largest banks held responsible for the crisis have been successfully rescued by bailouts. In this paper, through the analysis of income inequality, unemployment, tax cuts, and bailouts, we show that the interests of the general public are different from the interests of politicians and bankers. While the small elite group of politicians and bankers could set the deregulation policies with inordinate power based on full information, most people were ignorant and unconcerned about the policies, and hence did not oppose them. Specifically, we model the credit change in the financial markets of the United States by a finite state machine, and design three local supervisors representing three groups with different interests. It is then shown that the deregulation policies were adopted according to the difference of the supervisors' powers.

Research on key management for supervisory control and data acquisition system (원격 감시 제어시스템에서 키 관리 방안 연구)

  • Lee, Keonjik
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.16 no.4
    • /
    • pp.29-42
    • /
    • 2020
  • SCADA (Supervisory Control and Data Acquisition) systems for remote monitoring, data acquisition and control are applied to major industrial infrastructures including power, water and railroad. Recently, there are many researches on key management scheme for secure communication due to change to the open network environment. These systems are located at far distances and are connected to the main control center through various types of communication methods. Due to the nature of these systems, they are becoming the significant targets of cyber attack. We propose an efficient key management scheme which is established on ID-based cryptosystem without an expensive computation on MTU (Master Terminal Unit), Sub-MTU, and RTU (Remote Terminal Unit). The proposed method is secure and effective in key management among multiple legitimate devices.

STUDY ABOUT THE SELECTION OF COMTROL AND INDICATION POINT FOR TOTAL AUTOMATION (전력설비종합자동화를 위한 감시제어포인트 선정에 관한 연구)

  • 이용해;남태현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1989.10a
    • /
    • pp.562-566
    • /
    • 1989
  • The selection of control and indication joints effects the supervisory and control scope of SCADA system. This paper proposes the point selection for the no-man substation. The points of no-man s/s are 3-4times as many ad points of man-substation. And also the considering points are described to implement total automation.

  • PDF

Preparation of Reliable Measurement Data by Using State Estimation (상태추정을 이용한 고 신뢰도 측정데이터 확보방안 연구)

  • Kim, Hong-Rae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1020-1025
    • /
    • 2007
  • EMS(energy management system) and SCADA(supervisory control and data acquisition) systems are used for reliable and efficient operation of electrical power systems. Various functions in EMS such as power flow, contingency analysis, security analysis essentially need accurate data set for reliable operation. State estimation can be a tool for providing these data. In this paper, programs for observability analysis and bad data processing are developed. Fundamental algorithms are introduced and validity of the proposed techniques is inspected with test cases.

  • PDF