• Title/Summary/Keyword: subway tunnel

Search Result 381, Processing Time 0.022 seconds

Identification of Noise Characteristics for Subway Train Passing through the Underground Tunnel (터널통과 전동차 내외부 소음 특성 규명)

  • Cho, Jun-Ho;Lee, Kyu-Jin;Jung, Woo-Sung;Hong, Chull-Kee
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11b
    • /
    • pp.340-345
    • /
    • 2002
  • Passengers in automobile or train are exposed to a worse noise environment when they are in the tunnel than in the open field. This is due to a relatively higher space density of sound energy by multiple reflection phenomenon of noise generated by operation of transportation vehicles from tunnel wall compared to open field. In this study, noise characteristics of subway train running through a tunnel were investigated at straight/curved track and tunnel type(semi circular/box). Also the noise measured simultaneously at inner and outer sides of train running through a tunnel, so that the coherence of the various noise sources of subway train to inner noise was evaluated.

  • PDF

Design and Construction of a Large Section Tunnel for a Subway Station (지하철 대단면 터널의 설계와 시공관리 사례)

  • 문상조;장석부;정준화
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.285-292
    • /
    • 1999
  • Recent development cases of transportation utilities using tunnelling method in metropolitan sites have been increased due to the heavily complex environments and restrictions of construction works. The progress of tunnel design and construction to be supported by the tunnel analysis and measurement techniques using computers have increased adoptions of large section tunnels. In this paper, many factors to be considered in designing large section tunnels are discussed and the case of the construction of the subway station tunnel which is recently completed is introduced. This tunnel has a width of 24 m, a height of 16 m, and a excavation section area of 366 ㎡.

  • PDF

Case Study on defects of Tunnel Drainage in Subway (지하철의 터널 배수체계에 따른 결함 사레)

  • Kim Suk-Cho;Lee Jae-Uk;Cho Sung-Woo;Shin Yong-Suk
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.292-298
    • /
    • 2005
  • Tunnel in subway should be designed as a water-proof type tunnel as much as possible but it is difficult to make it come true due to several facts, such as construction technique and cost. A drainage type tunnel as a substitute of a water-proof tunnel lead to the increase of water pressure on the concrete lining that make bad effect to tunnel structure when it has some problem to operate the drainage system. Throughout studying about cases on defects of tunnel drainage in subway We hope it contributes to tunnel maintenance.

  • PDF

Mechanical evolution law and deformation characteristics of preliminary lining about newly-built subway tunnel closely undercrossing the existing station: A case study

  • Huijian Zhang;Gongning Liu;Weixiong Liu;Shuai Zhang;Zekun Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.5
    • /
    • pp.525-538
    • /
    • 2023
  • The development of a city is closely linked to the construction and operation of its subway system. However, constructing a new subway tunnel under an existing station is an extremely complex task, and the deformation characteristics and mechanical behavior of the new subway tunnel during the excavation process can greatly impact the normal operation of the existing station. Although the previous studies about the case of underpass engineering have been carried out, there is limited research on the condition of a newly-built subway tunnel that closely undercrossing an existing station with zero distance between them. Therefore, this study analyzes the deformation law and mechanical behavior characteristics of the preliminary lining of the underpass tunnel during the excavation process based on the real engineering case of Chengdu Metro Line 8. This study also makes an in-depth comparison of the influence of different excavation methods on this issue. Finally, the accuracy of numerical simulation is verified by comparing it with on-site result. The results indicate that the maximum bending moment mainly occurs at the floor slab of the preliminary lining, while that of the ceiling is small. The stress state at the ceiling position is less affected by the construction process of the pilot tunnel. Compared to the all-in-one excavation method, although the process of partial excavation method is more complicated, the deformation of preliminary lining caused by it is basically less than the upper limit value of the standard, while that of the all-in-one excavation method is beyond standard requirements.

A Study of Heat and Smoke Exhaust to Subway Tunnel Direction (지하철 터널부로의 열 및 연기배출에 관한 연구)

  • Rie, Dong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.1-8
    • /
    • 2004
  • This study aims to derive the operation method of a comprehensive ventilation system which is capable of providing passengers with safe exit paths from platforms in onboard fire situations. To accomplish this, the airflow distributions in subway platforms under 6 types of tunnel vent system were calculated in addition to having analyzed diffusion behaviors of smoke and heat exhaust in such states by performing 6 kinds of different ventilation scenarios in a 3-D Fire Dynamic Simulation (FDS) simulation model. In order to recommend the mechanical smoke exhaust operation mode, Subway Environmental Simulation(SES) is used to predict the airflow of the inlet and outlet tunnel for the subway station to clarify the safety evaluation fir the heat and smoke exhaust on subway fire events.

Time-Temperature Curve for Fire Safety Assessment of Metropolitan Transit Tunnels (도시철도 터널구조체의 내화안정성 평가를 위한 표준시간-온도곡선 적용)

  • Won, Jong-Pil;Choi, Min-Jung;Lee, Su-Jin;Lee, Sang-Woo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.118-122
    • /
    • 2010
  • The study presents a standard time-temperature curve to evaluate the fire performance of subway tunnel structures. The central subway section is 135km long in Korea, the fourth longest in the world. The number of subway tunnels has been increasing rapidly and fire risk is proportional to the tunnel length. However, an adequate time-temperature curve for subway tunnel fires does not exist. Therefore, we studied a proposed foreign fire design model for which the heat rate is based on the traffic, and we present an appropriate time-temperature curve for Korean subway tunnels. The ISO 834 curve was used as a fire design model and the temperature distribution in the tunnel was estimated using numerical analysis. This led to a proposal for effective measures against subway tunnel fires.

Full-Scale Test of Smoke-Control Performance of a Subway Tunnel (지하철 본선터널 제연성능 실물 실험)

  • Park, Won-Hee;Lee, Duck-Hee;Jung, Woo-Sung
    • Fire Science and Engineering
    • /
    • v.25 no.4
    • /
    • pp.94-102
    • /
    • 2011
  • Hot smoke test is done in a subway tunnel. Alcohol trays of 1.0 MW and smoke generators are used for generating hot smoke. The fans equipped with the tunnel are successively run 9 min after smoke generation. It is verified how hot smoke is controlled by fans. Velocity and direction of flow, temperature and smoke density are measured and analyzed for smoke control performance of the tunnel with fans and analyzed from the fire-safety-point of view. Velocity of smoke flow is obtained by using measured velocity and temperature at the ceiling of the tunnel. The time when smoke-control flow is builded up is different for the different positions. Velocity distributions at various positions will be used for the boundaries and the comparison data in numerical simulations for evaluation on smoke-control facilities of subway tunnel.

CONSTRUCTION OF SUBWAY TONNEL BENEATH EXISTING VEHICLE UNDERPASS

  • Kim, In-Kuin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.25-34
    • /
    • 1990
  • For the construction of twin single track subway tunnels by NATM within close proximity of existing vehicle underpass in the highly congested area of downtown Seoul, finite element analyses were performed to evaluate the ground responses during tunnelling and also the stability and safety of the underpass structure and subway tunnels. Results of the analyses indicated the need to improve the soil beneath the underpass, and pre-grouting was carried out prior to the tunnel excavation. During tunnel construction field measurement program was implemented to confirm the results of anslyses and to control the tunnel construction procedures, thus ensuring stability of the existing structres.

  • PDF

A Study for the Effect of Sound Absorbing Materials in the Tunnel (터널내의 흡음재 부착 효과 연구)

  • Park, Han-Lim;Lee, Duck-Joo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.750-750
    • /
    • 2001
  • Todays, according to development of traffics, there are so many tunnels around us. Tunnels are used for trains, subway trains, cars, etc. Especially for subway, all of its routes are tunnels. So the noise of the subway train cannot radiated out of the station and the noise level in the station and train cabin is so high. There are some methods to reduce this noise and one of them is using absorbing materials. But the area of the tunnel and station is very large, so it is important to determine the effective position and amount of absorbing materials before attaching them. In this study, we studied the effect of sound absorbing materials in the tunnel using boundary element method. We applied BEM for general boundary conditions. With BEM calculations, we found the effect of absorbing materials and effective positions for the subway tunnel and station.

  • PDF

Estizmation of Structure Stability on the Ground to Vibration from Dual Composite Tunnels (이중 복합터널 상부구조물의 진동에 대한 안정성 평가)

  • Shin, S.M.;Jang, Y.S.;Lee, W.J.;Kwon, S.J.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1244-1250
    • /
    • 2008
  • The site of interest is a residence redevelopment area which has excavation construction with cut-off walls. The site is located over Dong-Mang-Bong tunnel and Seoul No. 6 subway tunnel. This study analyzed numerically the influence of vibrations from No. 6 subway tunnel to the basement of the redeveloped apartment away from the distance about 11m. Kyoung-bu highspeed railway's time history model with linearly reduced maximum acceleration is applied to take into the subway maximum speed of 75km/h. The maximum velocity of vibration for the cross section of the interest was estimated as 0.28cm/sec which satisfied the allowable standard of 0.5cm/sec for apartment and residence of Seoul.

  • PDF