• Title/Summary/Keyword: subway construction

Search Result 413, Processing Time 0.026 seconds

A Case study on the Improvement of Tunnel Drainage systems (터널 배수처리 및 시설개선방안에 관한 연구)

  • 유상건;박태순;이준석
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.398-403
    • /
    • 2001
  • Since the urban subway is normally constructed under the groundwater level, the drainage system will be one of the most important factors during maintenance period. Therefore, to investigate suitability of the design approach and the construction specification, the inflow and the contents of the groundwater in the Route 5 of Seoul subway system are analysed. From these, the possibility of the design improvement and the economy of the maintenance cost are proposed.

  • PDF

An Analysis of the Passenger Flow Time in the Congested Subway Stations (서울시 혼잡 지하철역의 승하차 시간 분석)

  • Oh Seog-Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.963-970
    • /
    • 2005
  • The dwell time and the passenger flow time are surveyed on the definition, affecting factors, several conclusions, and the forecasting models based on the regression. Also, the results of the field survey and analysis are presented for the congested subway stations in Seoul. It is claimed that the comprehensive research should be fulfilled on the passenger flow for the Korean case itself, since the results are quite different from the results from [1], Moreover, the result is a important factor for the economic assessment of construction or renewal of the rail line.

  • PDF

Standardization of urban transit in Korea and its direction ( I ) (도시철도표준화와 향후 방향(I))

  • 한석윤;홍재성;이호용
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.937-942
    • /
    • 2002
  • As the subway composed of rolling stock, power supply, signalling, infrastructure is complex system, the optimization through standardization is one of the most effective way to reduce the cost of construction and operation. However, the subway in Korea has been built and operated in different kinds of system. In this paper, review for standardization of urban transit in Korea is executed and presented direction to standardization.

  • PDF

Case Studies for Temporary Soil Support Walls of Subway No.9 (지하철 9호선 흙막이 구조물의 설계 사례 분석)

  • 주재건;김영진;김경태
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.96-103
    • /
    • 2002
  • In this study, design concepts of Seoul Subway Construction (901∼914) are reviewed in relation to the cases for temporary soil support wall systems which are revealed in highly developed design competitions such as Turnkey and Alternative based on. Especially soil and rock properties, various design schemes for dealing with soil and water pressures, new technology adopted etc are discussed very profoundly and broadly for the better understanding and additional clues for constructing new design technologies.

  • PDF

Regional Groundwater Flow Characteristics due to the Subway System in Seoul, Korea (지하철에 의한 서울특별시 광역 지하수 유동 특성)

  • Shin, Esther;Kim, Hyoung-Soo;Ha, Kyoochul;Yoon, Heesung;Lee, Eunhee
    • Journal of Soil and Groundwater Environment
    • /
    • v.20 no.3
    • /
    • pp.41-50
    • /
    • 2015
  • Hydrogeologic environment of the Mega City such as Seoul, suffers from rapid changes caused by urbanization, construction of underground subway or buildings, and contaminant loading by diverse anthropogenic activities. Understanding the present condition of groundwater environment and water budget is necessary to prevent natural and manmade disasters and to prepare for sustainable water resource management of urban environment. In this study, regional groundwater flow and water budget status of Seoul was analyzed using numerical simulation. Modeling result indicated that groundwater level distribution of Seoul generally followed the topography, but the significant decreases in groundwater level were observed around the subway network. Steady-state water balance analysis showed groundwater recharge by rainfall and leakage from the water supply network was about 550,495 m3/day. Surface water inflow and baseflow rate via Han River and major streams accounted for 799,689 m3/day and 1,103,906 m3/day, respectively. Groundwater usage was 60,945 m3/day, and the total groundwater leakage along the subway lines amounted to 114,746 m3/day. Modeling results revealed that the subway could decrease net groundwater baseflow by 40%. Our study result demonstrated that the subway system can have a significant influence on the groundwater environment of Seoul.

Major causes of failure and recent measurements of tunnel construction (터널시공 중 붕락발생 원인과 최신 보강기술)

  • Park, Bong-Ki;Hwang, Je-Don;Park, Chi-Myeon;Kim, Sang-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.140-153
    • /
    • 2005
  • During the tunnel construction the major failure mode can be categorized as: tunnel failure just after the tunnel excavation without support, failure after application of shotcrete and finally failure after setting the concrete lining. The failure mode just after the tunnel excavation without support, can be further classified as : bench failure, crown failure, face failure, full face failure, failure due to weak strata and failure due to overburden. Moreover the failure after application of shotcrete is classified as heading face failure, settlement of shotcrete support, local failure of shotcrete lining and invert shotcrete. To find out the major causes of tunnel collapse, the investigation was done in case of the second phase of Seoul subway construction. The investigation results depicted that the major causes of tunnel collapse were due to the weak layer of rock/fault and sudden influx of ground water from the tunnel crown. While the investigation results of the mountain road tunnels construction have shown that the major causes of tunnel failure were inadequate analysis of tunnel face mapping results, intersection of faults and limestone cavities. In this paper some recent measurement in order to mitigate such tunnel collapse are presented

  • PDF

An Investigation of Rider Behavior to Transfer Seoul Metropolitan Transit Using Public Transport Card Data (교통카드 데이터를 이용한 수도권 광역급행철도 환승행태에 관한 연구)

  • Gun ki Jung;Dong min Lee;Sun hoon Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.146-164
    • /
    • 2022
  • Recently, the Korean government promoted the construction of metropolitan express subway to connect major transportation hub in the metropolitan area within 30 minutes. Most stations of the metropolitan express subway are connected to existing subway stations, so the importance of transfer increased. Although many studies have been conducted on the effect of transfer penalty on route choice, there are few studies on the transfer behavior of the metropolitan express subway. Therefore, in this study, a transfer behavior analysis was conducted on the Shinbundang Line, a representative metropolitan express subway. To analyze the transfer behavior according to the degree of traffic congestion and the presence of fare payment, route choice models were made using transport card data divided according to week, time, and user characteristics. As a result of the analysis, users of the metropolitan express subway had greater disutility to the transfer waiting time compared to the transfer moving time. Furthermore, especially during the peak time, EIVM(Equivalent in-vehicle minutes) of the transfer waiting time was 3.51. In this study, EIVM for metropolitan express subway users were analyzed to be 2.6 minutes, which is significantly lower than the results of previous studies on subways. This suggests that there is a difference in the transfer penalty between subways and metropolitan express subway, and that it is necessary to apply the transfer penalty between subways and express subway differently when forecasting subway traffic demand.

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

Design and Construction Problems of NATN Tunnel Emerged from Seoul Subway Construction (서울 지하철 건설에서 조명된 NATM 터널의 설계 및 시공상의 문제점)

  • 정명근;박광준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.15-20
    • /
    • 1993
  • NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.

  • PDF