• 제목/요약/키워드: structure work

검색결과 4,782건 처리시간 0.028초

초대형 건축물의 PC부재 양중작업 사례연구 (Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure)

  • 조원현;나영주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

Effect of Ar ion Sputtering on the Surface Electronic Structure of Indium Tin Oxide

  • Lee, Hyunbok;Cho, Sang Wan
    • Applied Science and Convergence Technology
    • /
    • 제25권6호
    • /
    • pp.128-132
    • /
    • 2016
  • We investigated the effect of Ar ion sputtering on the surface electronic structure of indium tin oxide (ITO) using X-ray and ultraviolet photoelectron spectroscopy (XPS and UPS) measurements with increasing Ar ion sputtering time. XPS measurements revealed that surface contamination on ITO was rapidly removed by Ar ion sputtering for 10 s. UPS measurements showed that the work function of ITO increased by 0.2 eV after Ar ion sputtering for 10 s. This increase in work function was attributed to the removal of surface contamination, which formed a positive interface dipole relative to the ITO substrate. However, further Ar ion sputtering did not change the work function of ITO although the surface stoichiometry of ITO did change. Therefore, removing the surface contamination is critical for increasing the work function of ITO, and Ar ion sputtering for a short time (about 10 s) can efficiently remove surface contamination.

내선분야 내역서 작성 및 체계 간소화 방안 고찰 (A Study on the Simplification for Quantity Bill Writing and Structure in the Electrical Extension Field)

  • 현소영;김광곤;박민영;최승동
    • 전기학회논문지
    • /
    • 제61권1호
    • /
    • pp.173-178
    • /
    • 2012
  • The quantity bill writing of organized electrical construction can be an effective to quality and process management in the construction. Therefore, in order to overcome confusion of the construction and doing an effective work, the clearly quantity bill writing is need. This paper is a focused to solve a problem of existing quantity bill as the difference in terms of work section and item information, regulatory information of ordering authority. Therefore, a terms of work section and item information, regulatory information of ordering authority has been normalized. Moreover, basic data of simplification for quantity bill writing and structure has been guaranteed.

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

도시주부의 가사노동에 대한 능도 (I) (Attitudes of Urban Homemakers Toward Household Work (I))

  • 김외숙
    • 대한가정학회지
    • /
    • 제19권4호
    • /
    • pp.55-64
    • /
    • 1981
  • The purpose of this study is to clarify the attitude of urban homemakers toward household work. The data in this study are obtained from a survey by means of a questionnaire to 174 homemakers in Chuncheon. Frequency, percent, F-test and t-test were applied for the statistical analysis and following results were found. 1) Respondents expressed slightly favorable attitudes toward household work and attitudes varied among the work and attitudes varied among the work activities. 2) The variables affecting the attitude were the age, educational level of homemakers, and the family structure.

  • PDF

빌딩공사의 안전관리정보시스템 개발 (A Development on the Safety Management Information System in Building Work)

  • 박종근
    • 한국안전학회지
    • /
    • 제20권4호
    • /
    • pp.71-77
    • /
    • 2005
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as foundation, erection, structure, equipment finish and etc based on accident examples and investigation on actual condition in building. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

배기형의 「경주 석굴암 보수공사 설계도」(1961)에 관한 고찰 (On the Plans of Kyongju's Sokkuram Restoration Project (1961) by Pai Ki Hyung)

  • 우동선;김태형
    • 건축역사연구
    • /
    • 제28권2호
    • /
    • pp.53-64
    • /
    • 2019
  • This study examines the restoration project of Sokkuram, and introduces its preliminary plans by the architect Pai Ki Hyung. The restoration project started in 1958 with an inquiry committee of the restoration project, and was completed in 1964. Despite having undergone extensive repair work under Japanese supervision from 1913 and 1923, the repair work caused water leakages inside Sokkuram, and regular cleaning work that began in 1933 caused a lot of damage to the sculpture. In result of the surveys, the top priority of this project was to protect the sculptures inside Sokkuram by improving the environment of the cave. At that time, the architect Mr. Pai participated as a head of the fourth field surveyors to plan the restoration project and to design the preliminary plans. He proposed the installation of a double dome structure to prevent further water leakages on the concrete addition that was built up around the grotto by the Japanese. However, in 1961, the Cultural Heritage Committee of Korea examined the plans of Mr. Pai and immediately rejected them. The factors of the rejection were the omitting of entrance design, system of new double dome structure that presses the existing structure, and these changes that had to be made outside of the drainage plans. The repair work of Sokkuram began in 1961, and the main construction was building double dome structure and entrance installation. In this we realize that Mr. Pai's double dome structure plans were very important key concept of this project. This study attempts to demonstrate the double dome installations that Mr. Pai initially proposed, which ultimately remains as emblematic factors of Sokkuram's legacy.

종사상 지위분류에 따른 산업분포변화: 부산, 1994~2004 (The Change of Industrial Distribution Pattern by Worker Status Classification : Busan, 1994~2004)

  • 강인주;남광우
    • 한국지리정보학회지
    • /
    • 제10권4호
    • /
    • pp.111-121
    • /
    • 2007
  • 도시산업구조의 진단과 예측은 지속가능한 도시발전계획수립을 위한 주요한 과제이다. 지금까지의 산업관련 도시공간구조 연구들은 주로 도시산업체 자료나 총 종사자수 자료를 활용하여 산업유형별 공간분포의 측정에 집중되어져 왔다. 그러나 최근 비정규직 문제를 포함한 근로자의 종사상 지위가 중요한 이슈가 되는 시점에서 본 연구는 읍면동 단위의 1994년 및 2004년 종사상 지위별 자료를 수집하고 동 변화자료를 기반으로 공간분석 단위를 일치시킨 후 GIS를 활용하여 종사상 지위분류체계 자료를 활용한 도시산업구조의 질적 변화를 공간적 관점에서 해석하였다. GIS환경에서 부산시 산업구조의 종사상지위 유형별 분석 결과는 다음과 같다. 첫째, 전통적인 노동집약적 산업이 한계에 부딪히고, 서비스업 및 도소매업은 영세한 생계형으로 진행되어 부산의 고용흡수력이 떨어질 수밖에 없었으며 통계상으로는 종사자의 수가 증가하였으나 비정규직과 비임금 노동자가 급증하면서 부산지역 일자리의 질이 하락하고 있는 것으로 측정되었다. 둘째, 전통적인 도심지는 쇠퇴하는 반면 신도시나 신흥공업단지가 형성된 지역, 제조업보다 서비스업이 발달한 지역이 일자리가 증가하는 경향을 보였다. 본 연구의 결과는 도시발전의 근간이 되는 산업구조의 행태적 패턴 뿐 아니라 종사상지위라는 질적 평가를 통한 장기적 차원의 산업발전계획안 마련을 위한 기초자료로서의 활용을 기대한다.

  • PDF

AHP에 의한 조선기업의 작업능률향상을 위한 과업관련기법의 선택 (An AHP Approach to Select the Task Related Technique for Work Efficiency Improvement in Shipbuilding Enterprise)

  • 김태수;이강우
    • 산업경영시스템학회지
    • /
    • 제30권2호
    • /
    • pp.67-74
    • /
    • 2007
  • The objective of this research is to select the most effective technique among task related techniques(motion & time study, job redesign, physical environment improvement) for improving work efficiency in shipbuilding enterprise. This study consists of several principal steps. The first step is to design critical criteria in evaluating work efficiency in ship-building enterprises. The second step is to develop sub-criteria of the critical criteria. The third step is to develop a four level AHP(Analytic Hierarchy Process) structure using the critical criteria, sub-criteria and techniques among task related techniques. The fourth step is to develop the pairwise comparison matrix at each level of AHP structure, which was based on survey data collected at the H heavy industry. And the last step is to select the most effective technique among task related techniques using AHP analysis. The result of AHP analysis has shown clear difference in priority among task related techniques in terms of work efficiency of the shipbuilding enterprise: The reduction of normal time is more important than the reduction of allowance time in improving of the work efficiency. Motion & time study is the most important technique for the reduction of normal time, and physical environment improvement is the most important technique for the reduction of allowance time as well.

Happy Work : 소프트웨어 구조 설계 환경의 개발 (Happy Work : A Software Architecture Design Environment)

  • 강병도
    • 한국산업정보학회논문지
    • /
    • 제5권3호
    • /
    • pp.87-93
    • /
    • 2000
  • 근래의 소프트웨어 관련업계에서는 소프트웨어 개발 및 관리에 있어 소프트웨어 아키텍처를 중심으로 생산성 및 품질의 극대화를 추구하고 있다. 또한 소프트웨어 컴포넌트 관련 기술 및 컴포넌트 기반 소프트웨어 개발 방법론에 대한 연구도 활발히 진행중이며, 많은 응용기술들이 나오고 있다. 소프트웨어 아키텍처는 소프트웨어를 컴포넌트로 구성하고 그 사이의 상호작용을 커넥터를 이용해 기술함으로서 전체적인 구조를 분석하고 유지하는데 필수적인 요소로 고려된다. 본 연구에서 제안하는 소프트웨어 모델링 기법은 Happy Work라는 모델링 도구를 사용하여 소프트웨어 구조를 기술하는 Happy Work Language를 생성한다. 그 과정에서 System Context Diagram, Component Diagram, Component Sequence Diagram과 같이 세 가지 다이어그램이 사용되며, User, System, Component, Connector와 같은 네 가지 Elements로 구성된다.

  • PDF