• Title/Summary/Keyword: structural risk analysis

검색결과 552건 처리시간 0.029초

석탑구조물의 구조적 손상을 고려한 위험도 분석 (Risk Analysis Considering Structural Damages of Stone Pagoda Structure)

  • 김호수;김동관;전건우
    • 한국공간구조학회논문집
    • /
    • 제20권4호
    • /
    • pp.101-110
    • /
    • 2020
  • In case of stone pagoda structures, the various construction types appear, and various damages occur due to exposure to the outdoors for a long time. Such damages can be classified into non-structural damages and structural damages. However, studies for the effects of structural damages on stone pagoda structures are insufficient. Accordingly, this study intends to perform structural modeling and structural analysis according to structural damages of stone pagoda structure, and to perform risk analysis through the fragility curve. So, we expects that this study gives a great contribution to the preservation and maintenance of stone pagoda structures under the various structural damages.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • 제28권6호
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

수공구조물 설계 시스템의 위험도 평가와 불확실성 해석 (Risk Evaluation and Uncertainty Analysis in Hydraulic Design system)

  • 장석환
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권4호
    • /
    • pp.194-200
    • /
    • 1998
  • Risk, probability of failure, which includes various uncertainties and influential factors of performance should be accounted for in engineering system. Recently, several different methods to analysis risk evaluation evolved and one of the practical method is FOSM (First Order Second Moment Method ). FOSM method is derived in terms of terms coefficient of variance to uncertainties which influence various factor. For risk evaluation and uncertainty analysis in hydraulic design system, load-capacity relationship is adopted in this paper. Sample catchment with design of sewer system is applied, which plots safety factor vs. risk. Risk evaluation and uncertainty analysis are very to important develop optimal design model in hydraulic system

  • PDF

건설공사의 위험도 분석평가 및 모델개발 (Development of a Risk Analysis Assessment Models for the Construction Projects)

  • 이정식
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권2호
    • /
    • pp.233-240
    • /
    • 1999
  • Even though the recent construction safety disasters not only result in the loss inside construction sites but also become to a large public disasters, safety activities are managed in an irrational way and safety rules are ignored in the construction sites which leads to occur same type of disasters repeatedly. In this paper, a fuzzy set theoretic approach to risk analysis is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using linguistic representation of the likelihood, exposure and consequences is introduced. A risk assessment model using approximate reasoning technique base on fuzzy logic is presented to drive fuzzy values of risk and numerical example for risk analysis is also presented to illustrate the results.

  • PDF

Application of first-order reliability method in seismic loss assessment of structures with Endurance Time analysis

  • Basim, Mohammad Ch.;Estekanchi, Homayoon E.;Mahsuli, Mojtaba
    • Earthquakes and Structures
    • /
    • 제14권5호
    • /
    • pp.437-447
    • /
    • 2018
  • Computational cost is one of the major obstacles for detailed risk analysis of structures. This paper puts forward a methodology for efficient probabilistic seismic loss assessment of structures using the Endurance Time (ET) analysis and the first-order reliability method (FORM). The ET analysis efficiently yields the structural responses for a continuous range of intensities through a single response-history analysis. Taking advantage of this property of ET, FORM is employed to estimate the annual rate of exceedance for the loss components. The proposed approach is an amalgamation of two analysis approaches, ET and FORM, that significantly lower the computational costs. This makes it possible to evaluate the seismic risk of complex systems. The probability distribution of losses due to the structural and non-structural damage as well as injuries and fatalities of a prototype structure are estimated using the proposed methodology. This methodology is an alternative to the prevalent risk analysis framework of the total probability theorem. Hence, the risk estimates of the proposed approach are compared with those from the total probability theorem as a benchmark. The results indicate a satisfactory agreement between the two methods while a significantly lower computational demand for the proposed approach.

건설공사의 위험도분석을 위한 확률적 위험도 평가 (Probabilistic Risk Assessment Techniques for the Risk Analysis of Construction Projects)

  • 조효남;임종권;박영빈
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1997년도 봄 학술발표회 논문집
    • /
    • pp.27-34
    • /
    • 1997
  • In this paper, systematic and comprehensive approaches are suggested for the application of quantitative PRA techniques especially for those risk events that cannot be easily evaluated quantitatively In addition, dominant risk events are identified based on their occurrence frequency assessed by both actual survey of construction site conditions and the statistical data related with the probable accidents. Practical FTA(Fault Tree Analysis) and ETA(Event Tree Analysis) models are used for the assessment of the identified risks. When the risk events are lack of statistical data, appropriate Bayesian models incorporating engineering judgement and test results are also introduced in this paper. Moreover, a fuzzy probability technique is used for the quantitative risk assessment of those risk components which are difficult to evaluate quantitatively.

  • PDF

Using Bayesian network and Intuitionistic fuzzy Analytic Hierarchy Process to assess the risk of water inrush from fault in subsea tunnel

  • Song, Qian;Xue, Yiguo;Li, Guangkun;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng;Zhou, Binghua
    • Geomechanics and Engineering
    • /
    • 제27권6호
    • /
    • pp.605-614
    • /
    • 2021
  • Water inrush from fault is one of the most severe hazards during tunnel excavation. However, the traditional evaluation methods are deficient in both quantitative evaluation and uncertainty handling. In this paper, a comprehensive methodology method combined intuitionistic fuzzy AHP with a Bayesian network for the risk assessment of water inrush from fault in the subsea tunnel was proposed. Through the intuitionistic fuzzy analytic hierarchy process to replace the traditional expert scoring method to determine the prior probability of the node in the Bayesian network. After the field data is normalized, it is classified according to the data range. Then, using obtained results into the Bayesian network, conduct a risk assessment with field data which have processed of water inrush disaster on the tunnel. Simultaneously, a sensitivity analysis technique was utilized to investigate each factor's contribution rate to determine the most critical factor affecting tunnel water inrush risk. Taking Qingdao Kiaochow Bay Tunnel as an example, by predictive analysis of fifteen fault zones, thirteen of them are consistent with the actual situation which shows that the IFAHP-Bayesian Network method is feasible and applicable. Through sensitivity analysis, it is shown that the Fissure development and Apparent resistivity are more critical comparing than other factor especially the Permeability coefficient and Fault dip. The method can provide planners and engineers with adequate decision-making support, which is vital to prevent and control tunnel water inrush.

전자상거래환경에서 위험분석방법론의 타당성에 대한 연구 (A Empirical Validation of Risk Analysis Model in Electronic Commerce)

  • 김종기;이동호;서창갑
    • 정보보호학회논문지
    • /
    • 제14권4호
    • /
    • pp.61-74
    • /
    • 2004
  • 위험분석모델은 정보시스템 보안과 관련된 위험을 자산, 위협, 취약성, 보안통제의 관계를 통해서 설명하는 체계화 된 방법이다. 그러나 위험분석모델의 실증적인 연구가 이루어진 경우는 상당히 드물며, 특히 위험분석모델의 타당성 논의는 거의 없는 실정이다. 구조방정식모델을 적용하여 전자상거래 환경에서 위험분석모델의 타당성에 대한 실증적 분석을 한 결과, 위험의 수준에 영향을 미치는 요인으로 언급되는 위협과 보안통제는 통계적으로 유의한 것으로 나타났다. 본 연구는 전자상거래 이용자의 위험인지에 영향을 미치는 요인을 위험분석 접근법을 이용하여 모델 화하여 검증함으로써 전자상거래 위험에 영향을 미치는 선행요인을 규명할 뿐만 아니라 위험분석접근법을 통한 전자상거래에 대한 새로운 관점에서의 접근을 가능하게 한다.

Dynamic risk assessment of water inrush in tunnelling and software development

  • Li, L.P.;Lei, T.;Li, S.C.;Xu, Z.H.;Xue, Y.G.;Shi, S.S.
    • Geomechanics and Engineering
    • /
    • 제9권1호
    • /
    • pp.57-81
    • /
    • 2015
  • Water inrush and mud outburst always restricts the tunnel constructions in mountain area, which becomes a major geological barrier against the development of underground engineering. In view of the complex disaster-causing mechanism and difficult quantitative predictions of water inrush and mud outburst, several theoretical methods are adopted to realize dynamic assessment of water inrush in the progressive process of tunnel construction. Concerning both the geological condition and construction situation, eleven risk factors are quantitatively described and an assessment system is developed to evaluate the water inrush risk. In the static assessment, the weights of eight risk factors about the geological condition are determined using Analytic Hierarchy Process (AHP). Each factor is scored by experts and the synthesis scores are weighted. The risk level is ultimately determined based on the scoring outcome which is derived from the sum of products of weights and comprehensive scores. In the secondary assessment, the eight risk factors in static assessment and three factors about construction situation are quantitatively analyzed using fuzzy evaluation method. Subordinate levels and weight of factors are prepared and then used to calculate the comprehensive subordinate degree and risk level. In the dynamic assessment, the classical field of the eleven risk factors is normalized by using the extension evaluation method. From the input of the matter-element, weights of risk factors are determined and correlation analysis is carried out to determine the risk level. This system has been applied to the dynamic assessment of water inrush during construction of the Yuanliangshan tunnel of Yuhuai Railway. The assessment results are consistent with the actual excavation, which verifies the rationality and feasibility of the software. The developed system is believed capable to be back-up and applied for risk assessment of water inrush in the underground engineering construction.

의사결정을 위한 콘크리트댐 위험요인 분석 (Risk Factor Analysis of Concrete Dam for Decision Making)

  • 임정열;장봉석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.554-557
    • /
    • 2006
  • For various historical and technical reasons, the safety of dams has been controlled by an engineering standards-based approach, which has been developed over many years, initially for the design of new dams, but increasingly applied over the past few decades to assess the safety of existing dams. And some countries were asked for risk assessment on existing dam, which included structural, hydraulic safety of dam and social risk. Whereas other countries have developed and adapted as an additional tool to assist in decision-making for dam safety management. Dam risk analysis should need the reliability data of dam failures, the past constructed history and management records of existing dam. It is thought with risk analysis method of dams for structural safety management in domestic that suitable to use consider an event tree, fault tree and conditioning indexes method.

  • PDF