• Title/Summary/Keyword: steel and bridge

Search Result 1,636, Processing Time 0.029 seconds

Cellular and corrugated cross-sectioned thin-walled steel bridge-piers/columns

  • Ucak, Alper;Tsopelas, Panos
    • Structural Engineering and Mechanics
    • /
    • v.24 no.3
    • /
    • pp.355-374
    • /
    • 2006
  • Thin walled steel bridge-piers/columns are vulnerable to damage, when subjected to earthquake excitations. Local buckling, global buckling or interaction between local and global buckling usually is the cause of this damage, which results in significant strength reduction of the member. In this study new innovative design concepts, "thin-walled corrugated steel columns" and "thin-walled cellular steel columns" are presented, which allow the column to undergo large plastic deformations without significant strength reduction; hence dissipate energy under cyclic loading. It is shown that, compared with the conventional designs, circular and stiffened box sections, these new innovative concepts might results in cost-effective designs, with improved buckling and ductility properties. Using a finite element model, that takes the non-linear material properties into consideration, it is shown that the corrugations will act like longitudinal stiffeners that are supporting each other, thus improving the buckling behavior and allowing for reduction of the overall wall thickness of the column.

The Reasonable Concrete-Placing Methods and Sequences of Composite Steel Bridge (강합성형 교량의 합리적인 타설방법과 순서에 관한 연구)

  • Jo, Byung-Wan;Seo, Sug-Gu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.3 no.2
    • /
    • pp.205-212
    • /
    • 1999
  • Recently, unexpected cracks in the concrete deck slab of composite steel bridges have been widely reported at an early age of concrete placing due to the concrete placing sequence and methods. Accordingly, the analytical research was carried out to verify the negative moment at an internal supports due to the several concrete pouring sequence and to determine the reasonable concrete placing method on the deck slab of composite steel bridge. The results show that the conventional concrete-placing method, which pours concrete first on the positive moment regions and then negative regions, leads to the minimum moment at an internal supports. However, the conventional method produces two impractical construction joints on every spans and makes field engineer to pour concrete continuously. In conclusion, this concrete-placing method was verified to be reasonable only when the construction joint was placed at the $\frac{5}{8}l{\sim}\frac{6}{8}l$ location of the middle span.

  • PDF

Fatigue Life Assessment of Steel Bridge Butt Joint Weld with Defects (강교량 맞대기용접 결함부의 피로수명 평가)

  • Baek, Yeong Nam;Jang, Yeong Gwon
    • Journal of Welding and Joining
    • /
    • v.18 no.2
    • /
    • pp.204-204
    • /
    • 2000
  • There are many weld defects such as surface crack, lack of fusion, and incomplete penetration(IP) in the butt joint weld of the existing steel bridges. The crack-like defects may significantly reduce the life of the structure. This paper presents the procedure and the results of the fatigue life assessment of the butt joints with weld defects in the existing steel girder bridge. The butt joint welds with incomplete penetration were instrumented with strain gages to determine the stress histogram under normal traffic. Based on the measured stress histogram the crack propagation analysis were performed for the fatigue life assessment. By using the suggested procedure and methodology, one can decide the time of periodic inspection and the necessity of repair of the butt joint welds with serious weld defects in the existing steel bridge. (Received October 1, 1999)

Fatigue Life Assessment of Steel Bridge Butt Joint Weld with Defects (강교량 맞대기용접 결함부의 피로수명 평가)

  • 백영남;장영권
    • Journal of Welding and Joining
    • /
    • v.18 no.2
    • /
    • pp.77-85
    • /
    • 2000
  • There are many weld defects such as surface crack, lack of fusion, and incomplete penetration (IP) in the butt joint weld of existing steel bridges. The crack-like defects may significantly reduce the fatigue life of the structure. This paper presents the procedure and the results of the fatigue life assessment of the butt joints with weld defects in the existing steel girder bridge. The butt joint welds with incomplete penetration were instrumented with strain gages to determine the stress histogram under normal traffic. Based on the measured stress histogram the crack propagation analysis were performed for the fatigue life assessment. By using the suggested procedure and methodology, one can decide the time of periodic inspection and the necessity of repair of the butt joint welds with serious weld defects in the existing steel bridge.

  • PDF

Degree of hydration-based thermal stress analysis of large-size CFST incorporating creep

  • Xie, Jinbao;Sun, Jianyuan;Bai, Zhizhou
    • Steel and Composite Structures
    • /
    • v.45 no.2
    • /
    • pp.263-279
    • /
    • 2022
  • With the span and arch rib size of concrete-filled steel tube (CFST) arch bridges increase, the hydration heat of pumped mass concrete inside large-size steel tube causes a significant temperature variation, leading to a risk of thermal stress-induced cracking during construction. In order to tackle this phenomenon, a hydration heat conduction model based on hydration degree was established through a nonlinear temperature analysis incorporating an exothermic hydration process to obtain the temperature field of large-size CFST. Subsequently, based on the evolution of elastic modulus based on hydration degree and early-age creep rectification, the finite element model (FEM) model and analytical study were respectively adopted to investigate the variation of the thermal stress of CFST during hydration heat release, and reasonable agreement between the results of two methods is found. Finally, a comparative study of the thermal stress with and without considering early-age creep was conducted.

Fatigue Assessment of Butt Joint with Weld Defect in Steel Bridge (강교 용접 결함부의 피로평가)

  • Juhn, Gui Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.1
    • /
    • pp.98-107
    • /
    • 1998
  • There are many weld defects such as surface crack, lack of fusion, and imcomplete penetration in the butt joint of the existing steel bridges. The crack-like defects may significantly reduce the fatigue life of the structure. This paper presents the procedure and the results of the fatigue assessment of the butt joints with weld defect in the existing steel girder bridge. The butt joints with imcomple penetration were instrumented with strain gages to determine the stress histogram under normal traffic. Based on the measured stress histogram the crack propagation analyses were performed for the fatigue assesment. By using the suggested procedure and methodology, one can decide the time of periodic inspection and the necessity of repair of the butt joints with serious weld defects in the existing steel bridge.

  • PDF

Analysis of the variability of deflection of a prestressed composite bridge deck

  • Staquet, Stephanie;Detandt, Henri;Espion, Bernard
    • Steel and Composite Structures
    • /
    • v.4 no.5
    • /
    • pp.385-402
    • /
    • 2004
  • Nearly 400 composite railway bridge decks of a new kind belonging to the trough type with U-shaped cross section have been constructed in Belgium over the last fifteen years. The construction of these bridge decks is rather complex with the preflexion of precambered steel girders, the prestressing of a concrete slab and the addition of a 2nd phase concrete. Until now, they have been designed with a classical computation method using a pseudo-elastic analysis with modular ratios. Globally, they perform according to the expectations but variability has been observed between the measured and the computed camber of these bridge decks just after the transfer of prestressing and also at long-term. A statistical analysis of the variability of the relative difference between the measured camber and the computed camber is made for a sample of 36 bridge decks using no less than 10 variables. The most significant variables to explain this variability at prestressing are the ratio between the maximum tensile stress reached in the steel girders during the preflexion and the yield strength and the type of steel girder. For the same sample, the long-term camber under permanent loading is computed by two methods and compared with measurements taken one or two years after the construction. The camber computed by the step-by-step method shows a better agreement with the measured camber than the camber computed by the classical method. The purpose of the paper is to report on the statistical analysis which was used to determine the most significant parameters to consider in the modeling in order to improve the prediction of the behaviour of these composite railway bridge decks.

In-situ test and dynamic response of a double-deck tied-arch bridge

  • Gou, Hongye;Zhou, Wen;Chen, Genda;Bao, Yi;Pu, Qianhui
    • Steel and Composite Structures
    • /
    • v.27 no.2
    • /
    • pp.161-175
    • /
    • 2018
  • In this study, in-situ dynamic tests of the world's longest steel box tied-arch bridge over the Yangtze River, China, are reported. The double deck bridge supports highway and monorail systems at upper and lower levels, respectively. Strain, displacement, and acceleration responses were measured and used to investigate the vibration characteristics of the bridge when excited by running trains and/or trucks at a speed of 5-60 km/h, train braking, and truck bouncing. Impact factors were correlated with the running speed of trains and trucks. A three-dimensional finite element model of the coupled monorail-train-bridge vibration system accounting for track irregularities was established to understand the system behavior and validated by the experimental results. Truck bouncing was the dominant impact factor on bridge responses. The running speed of vehicles determined the riding comfort of traveling trains.

A Study of continuous PSC bridge with a reinforcement steel plate (보강강판을 이용한 연속 PSC 교량 공법에 관한 연구)

  • Koo Min-Se;Kim Hun-Hee;Jung Young-Do
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.422-429
    • /
    • 2005
  • It is limited to decrease height or section even by system conversion to indeterminate structure - continuous beam - in existing PSC girder bridges. In this study, the movement of connection is analyzed through actual field test, by increasing stiffness of negative moment area in continuous PSC bridge and developing continuous PSC bridge with embedded steel plate, that can overcome the demerit of existing connection. As a result, it is confirmed that the body unification of the connection is being realized and maintained. Moreover, the height of a span is suggested in continuous PSC girder bridge with embedded steel plate by computational analysis

  • PDF

Bridge flutter control using eccentric rotational actuators

  • Korlin, R.;Starossek, U.
    • Wind and Structures
    • /
    • v.16 no.4
    • /
    • pp.323-340
    • /
    • 2013
  • An active mass damper system for flutter control of bridges is presented. Flutter stability of bridge structures is improved with the help of eccentric rotational actuators (ERA). By using a bridge girder model that moves in two degrees of freedom and is subjected to wind, the equations of motion of the controlled structure equipped with ERA are established. In order to take structural nonlinearities into consideration, flutter analysis is carried out by numerical simulation scheme based on a 4th-order Runge-Kutta algorithm. An example demonstrates the performance and efficiency of the proposed device. In comparison with known active mass dampers for flutter control, the movable eccentric mass damper and the rotational mass damper, the power demand is significantly reduced. This is of advantage for an implementation of the proposed device in real bridge girders. A preliminary design of a realization of ERA in a bridge girder is presented.