• Title/Summary/Keyword: stayed-cables

Search Result 182, Processing Time 0.026 seconds

An Improved Method for Initial Shape Analysis of Cable-Stayed Bridges (사장교의 개선된 초기형상 해석법)

  • Kim, Moon Young;Kyung, Yong Soo;Lee, Jun Sok
    • Journal of Korean Society of Steel Construction
    • /
    • v.15 no.2
    • /
    • pp.175-185
    • /
    • 2003
  • The extended tangent stiffness matrices and force-deformation relations of the elastic catenary element were initially derived through the addition of the unstrained length of cables to unknown nodal displacements. A beam-column element was then introduced to model the deck and pylon of cable-stayed bridges. The conventional geometric nonlinear analysis, initial force method, and TCUD method were summarized, with an effective method combining two methods presented to determine the initial shapes of cable-stayed bridges with dead loads. In this combined method, TCUD method was applied to eliminate vertical and horizontal displacements at cable-supported points of decks and on top of pylons, respectively. The initial force method was also adopted to eliminate horizontal and vertical displacements of decks and pylons, Finally, the accuracy and validity of the proposed combined method were demonstrated through numerical examples.

Cable Tension Force Management Using Vibration Method at Cable Stayed Bridge Construction Stages (진동법을 이용한 사장교 시공단계별 케이블 장력관리)

  • Park, Yeon-Soo;Cheon, Dong-Ho;Cheon, Yang-Bae;Kang, Kyoung-Koo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.127-134
    • /
    • 2005
  • Design and construction of long-span bridge are recently increasing by development of computer technology. Specially, cable stayed bridge and suspension bridge having cable component are representative of long-span bridge may do. Therefore, this paper a present a methodology for cable tension force monitoring in cable-stayed bridge under construction using acceleration data acquired by the vibration method. To improve accuracy construction, all stay cables are measured, according to 4-step construction stage and change of temperature.

Evaluation of Wake Galloping for Inclined Parallel Cables by Two-Dimensional Wind Testes Tests (2차원 풍동실험을 통한 평행 경사 실린더의 웨이크 갤로핑 평가)

  • Kim, Sun-Joong;Kim, Ho-Kyung;Lee, Sang-Hoon
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.6
    • /
    • pp.763-775
    • /
    • 2011
  • The wake galloping phenomenon is evaluated for two cylinders via two-dimensional wind tunnel tests. The two cylinders are deployed parallel to the inclination of the vertical plane, which simulates the inclined stay cables of a cable-stayed bridge. The upstream and downstream displacements of the cylinder are observed with varying center distances between the two cylinders. The effect of structural damping on the mitigation of wake galloping is also investigated. The amplitude of the vibration is very sensitive to center distance between the two cylinders. The maximum amplitudes exceededthe allowable limit of the design guidelines for small center distances of less than or equal to six times the diameter of the cylinder. The overall results conformedto the conventional design practice for the wake galloping of parallel cables. It was found, however, that the increase in the damping was not effective in reducing the amplitude of the vibration in the wake galloping phenomenon.

A Study on the Modal Parameters for Cable System of Bridge (교량 케이블시스템의 모드변수에 관한 연구)

  • Lee, Hyunchol;Jo, Yeong-hoon;Kim, Jinsoo;Park, Kyoungho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.5
    • /
    • pp.48-59
    • /
    • 2019
  • In recent years, the type of bridge where cables such as suspension bridge and cable-stayed bridge are the main factors in the construction of long-range bridges has been soaring. The effects of cables on these structures are very large, and for structural analysis, it is necessary to study the cable and the structural changes according to the mode characteristics of the cables. In particular, cables are directly connected to camber adjustment, which conveys load effects on girders to tower, and are important components in the overall structure, and since the initial tension on the construction is compared with the tension over time, this study was conducted to help identify the condition of the bridge's aging and abnormalities. Therefore, in this study, the characteristics of the mode from the mode analysis through the impact hammer to the mass of the cable and the change in the length of the cable are analyzed.

Dynamic Analysis of Cable-Stayed Bridge Subjected to Random Wind Forces (랜덤풍하중에 대한 사장교의 동력학적연구)

  • Hyun, Chang Hun;Yun, Chung Bang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.4 no.4
    • /
    • pp.59-66
    • /
    • 1984
  • The dynamic behavior of a cable-stayed bridge due to random wind forces is investigated. The effects of the steady wind, the self-excited and the buffeting forces are studied. The dynamic analysis of the structure is carried out by the frequency domain method utilizing the mode superposition. Example analysis are performed for Dolsan Bridge, which is under construction at Yeosu, Jeonnam. Aerodynamic stability of the bridge is investigated and the vertical motion of the girder as well as the tension variations of the cables is obtained.

  • PDF

Design strategy of hybrid stay cable system using CFRP and steel materials

  • Xiong, Wen;Cai, C.S.;Xiao, Rucheng;Zhang, Yin
    • Steel and Composite Structures
    • /
    • v.13 no.1
    • /
    • pp.47-70
    • /
    • 2012
  • To enhance cable stiffness, this paper proposed a combined application of carbon fiber reinforced polymers (CFRP) and steel materials, resulting in a novel type of hybrid stay cable system especially for the cable-stayed bridges with main span lengths of 1400~2800 m. In this combination, CFRP materials can conserve all their advantages such as light weight and high strength; while steel materials help increase the equivalent stiffness to compensate for the low elastic modulus of CFRP materials. An increase of the equivalent stiffness of the hybrid stay cable system could be further obtained with a reasonable increase of its safety factor. Following this concept, a series of parametric studies for the hybrid stay cable system with the consideration of stiffness and cost were carried out. Three design strategies/criteria, namely, best equivalent stiffness with a given safety factor, highest ratio of equivalent stiffness to material cost with a given safety factor, and best equivalent stiffness under a given cost were proposed from the stiffness and cost viewpoints. Finally, a comprehensive design procedure following the proposed design strategies was suggested. It was shown that the proposed hybrid stay cable system could be a good alternative to the pure CFRP or traditional steel stay cables in the future applications of super long span bridges.

Seismic Analysis of a 3-dimensional Cable-Stayed Bridge with an Unsymmetric Girder Cross-section (주형단면의 비대칭성을 고려한 3차원 사장교의 지진해석)

  • Kim, Chul Young;Chang, Sung Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.2
    • /
    • pp.11-20
    • /
    • 1992
  • In general, the cross-section of a girder of a bridge has only one axis of symmetry. Therefore, lateral forces such as earthquake and wind may cause torsion coupled with lateral bending in the gider. This induces additional stresses especially in cables arranged in double-planes. Since this effect cannot be considered by using the conventional frame elements, the stiffness and the mass matrices of the geometrically nonlinear thin-walled frame element have to be used in order to model the girder. Theoretical development and verification of the frame element used in this study were made through a-previously presented paper. In this paper, seismic analysis of a three dimensional cable-stayed bridge considering the unsymmetry of the girder cross-section is performed to investigate the coupled flexural-torsional behaviors.

  • PDF

Free Vibration Analysis of a 3-dimensional Cable-Stayed Bridge with the Unsymmetric Girder Cross-section (비대칭단면 주형을 갖는 3차원 사장교의 고유진동해석)

  • Kim, Chul Young;Chang, Sung Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.2
    • /
    • pp.15-26
    • /
    • 1991
  • The lateral forces such as the earthquake and wind my cause the torsion to be coupled with the lateral bending in the gider, the cross-section of wich has only one axis of symmetry. This induces additional stresses especially in cables arranged in double-planes. Since this effect cannot be considered by using the conventional frame elements, the stiffness and the mass matrices of the geometrically nonlinear thin-walled frame element are developed in this study to model the girder. The equivalent modulus of elasticity proposed by Ernst is used for the cable elements. Verification of the present theory is made through a numerical example. Then, the free vibration of a three dimensional cable-stayed bridge is analyzed to study the coupled flexural-torsional behavior.

  • PDF

A Study on Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 케이블 정착구조에 관한 연구)

  • Kong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.1229-1234
    • /
    • 2005
  • Since the 20th century, the business of railway was invaded by the invention of airplanes and vehicles in the field of the transportation of passenger and commercial products, however, in the 21st century, the fervent development of a high speed railway made possible the huge capacity of transporting passengers and commercial freight, so the railway industry is facing a new era of railway revolution. The 200 years old railway tradition includes the history of railway bridges built in areas of river, valley and metropolitan region and in that, the number of constructions of railway bridges that is composed of cable-stayed bridges is increasing as one of the most optimal bridges considering the quality of materials and the span of continuous-welded long rail. Thanks to the minimized effects of the fixed load on the stiffening girder section by delivering the fixed load which is applied to the pylon with the composition of elastic supporting points by using cables and the effective structural system that can throughly resist extra loads in addition to fixed load, the long-extended span of a bridge becomes possible. In this structural system, the load that is applied to the stiffening girder section forms a now pattern and in the process of these load delivery, there will be a necessity to examine the concentration of stress occurred in the cable-anchor system of the cable.

  • PDF

A Study on Stress Analysis of Cable Anchor System in Cable-Stayed Railway Bridge (철도용 사장교의 케이블 정착구조에 관한 형식별 FEM해석 연구)

  • Park, Ji-Ho;Kong, Byung-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.552-557
    • /
    • 2006
  • Since the 20th century, the business of railway was invaded by the invention of airplanes and vehicles in the field of the transportation of passenger and commercial products, however, in the 21st century, the fervent development of a high-speed railway made possible the huge capacity of transporting passengers and commercial freight, so the railway industry is facing a new era of railway revolution. The 200 years old railway tradition includes the history of railway bridges built in areas of river, valley and metropolitan region and in that, the number of constructions of railway bridges that is composed of cable-stayed bridges is increasing as one of the most optimal bridges considering the quality of materials and the span of continuous-welded long rail. Thanks to the minimized effects of the fixed load on the stiffening girder section by delivering the fixed load which is applied to the pylon with the composition of elastic supporting-points by using cables and the effective structural system that can throughly resist extra loads in addition to fixed load, the long-extended span of a bridge becomes possible. In this structural system, the load that is applied to the stiffening girder section forms a flow pattern and in the process of these load delivery, there will be a necessity to examine the concentration of stress occurred in the cable-anchor system of the cable.

  • PDF