• Title/Summary/Keyword: standard apartment construction cost

Search Result 43, Processing Time 0.03 seconds

A Study on the Evaluation for Energy Characteristic of Absorber Floor Insulation of Apartment House (공동주택 층간단열 완충재의 열에너지 특성의 관한 연구)

  • Choi, Dong-Hyuk;Choi, Gyoung-Seok;Kang, Jae-Sik;Lee, Seung-Eon;Cho, Woo-Jin
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.712-717
    • /
    • 2009
  • Ondol is a tradtional Korea heating system with a long history. The ondol heating system is a default in ordinary houses and high-rise apartment alike. But Intensified Architecture Law insulation standard can't satisfied standard insulation only light weight concrete in ondol. The between light weight concrete and slab apply EPS insulation is construct for generate a method of construction. The standard insulation for floor heating system is responsible but complicate construction thermal transmittance and absorber, deteriorate the cost and decreasing the performance insulation & impact floor sound. In study on the evaluation decrease heating-load of floor construction of the insulation & absorber that improvement floor a Apartment house.

  • PDF

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

A Scheme for the Balcony Rebuilding in Apartment Building (공동주택 발코니 개조 방안)

  • Lee Hui-Bok;Kim Eun-Tae;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.468-471
    • /
    • 2004
  • Due to the supply of standard plans disregarding the occupant's of apartment houses preference, the renovation of balcony has frequently been increasingly performed. As a result, the renovation has caused a loss of national economy and many problems. Existing research studies related to the balcony renovation discussed the implement plans on rate and types o( renovation. However the loss cost by balcony renovation has never been researched. This study, therefore, estimated renovation cost by surveys and analyzed the causes of renovation with regard to the selling methods of companies, awareness of occupants and re131e0 regulations.'rhis study proposes a guideline for the rebuilding the balconies of apartment houses to minimize a loss of national economy.

  • PDF

The Analysis CO2 Emission and Economic Efficiency of High-rise Apartment Houses (초고층 공동주택의 CO2 배출량과 경제성 분석에 관한 연구)

  • Roh, Seung-Jun;Tae, Sung-Ho;Kim, Tae-Hyoung;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.47-48
    • /
    • 2012
  • In this study, the CO2 emission and economic efficiency of high-rise apartment houses were evaluated, and were analyzed as a way to establish database on the evaluation of environment-friendliness of high-rise buildings. To that end, standard of buildings to be evaluated were proposed through analysis of the designing guideline for high-rise apartment houses proposed by Seoul city, and CO2 emission of the subject buildings were evaluated based on the characteristics of materials admitted into each building and the amounts of energy consumed during lifecycle period. In addition, the initial costs in construction stage and annual costs in operation stage were set as analysis parameters, and along with calculation of direct cost by the consumption of construction materials and energy, the costs of CO2 emission were evaluated and analyzed. As a result, the CO2 emission and economic efficiencies of high-rise apartment houses by construction stage and operation stage could be analyzed quantitatively.

  • PDF

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A Study of the Decision to Standardize Sale Price Model of Supplying Apartment Houses (공동주택 분양가 결정모형에 관한 연구)

  • Hwang, Kyu-Sung;Lee, Chan-Ho
    • Journal of Digital Convergence
    • /
    • v.15 no.1
    • /
    • pp.181-189
    • /
    • 2017
  • The purpose of this research is to set a standard for deciding competitive marketing prices of new supplying apartment houses and to analyze decision factors in sale price of supplying apartment houses with Analytic Hierarchy Process; the resulted model does not use the method that joins the land cost and the cost of construction together, but the method that compares the sales prices of surrounding apartments. This research tries to set a standard for decision of the prices of newly supplying apartment houses by classifying the determinants into the $1^{st}$ step(4 factors), the $2^{nd}$ step(9 factors), and the $3^{rd}$ step(25 factors). According to the process, the relative importance of decision factors in the sale prices is determined and this should be used as the index of sale prices for newly supplying apartment houses when the houses are provided. In addition, through the $2^{nd}$ step including 9 factors, the comparative model for sale prices is defined and the model is presented to be applied in the real business. Subsequent study additionally considering the factors apart from marketing which tries to find a generalized standard needs to be conducted.

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

Analysis of Consulting Reports on Defect Disputes in Apartment Building

  • Seo, Deok-Seok;Park, Jun-Mo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.498-505
    • /
    • 2013
  • The main processes involved in a defect dispute are consulting, reviewing, and finally judging as an arbiter. This process of defect consulting produces a defect consulting report, but business practices and standards of judgment will differ among consultants, and have many problems. This study reviews the structure of a defect consulting report and considers the structure's problem, which is that it is not standardized. To achieve this, data of sixteen defect consulting report were collected involving defect lawsuit cases before or after 2010. The structure and index of the defect consulting reports were then reviewed, and the results are as follows. As for a structure based on fourteen index, there are suitable that judge a outline, a cost estimate data and a consulting work item by a consulting standard. Furthermore, analysis by each common parts and private parts is considered as appropriate about consulting items and estimate by standard. However, consulting item in construction progress and responsibility period for security that related on a cause and a responsibility of defect need to complement. Meanwhile, the first thing of issues are connected a defect consulting is urgent a standardization for a defect type.