• Title/Summary/Keyword: social construction

Search Result 1,646, Processing Time 0.113 seconds

A preliminary Study on Selection of Construction Method for Roofing work in Large-Scale Structures (대공간 건축물 지붕공사의 시공기법선정을 위한 기초연구)

  • Kim, Daegil;Hong, Jooyoung;Lee, Myungdo;Eom, Jinup;Kim, Daewon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.247-248
    • /
    • 2016
  • Globally the interest of large-scale structure has been increasing for the use in various social and cultural events. However various problems for building large-scale structure in South Korea are expected in terms of construction method and site management due to the lack of experience. Construction method and planning significantly affects on making decisions. There are only theoretical approach for constructing large-scale building in domestic with the limited experience of constructing constrained size structure. Through Analytic Hierarchy Process with experts, derived decision factors mostly used construction method in construction of large-scale structure. Derived factors from this study will support making decisions for field management in constructing large-scale structure.

  • PDF

A Study of Nude Construction Roon Composition & Application for Interior Construction Education (실내시공 교육을 위한 누드시공실 구성과 운용에 관한 연구)

  • 박의정
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.133-139
    • /
    • 2001
  • Today the social concern about Interior Design gradually requires wide comprehension. Also according to demanders' requirement. Universities cope with speed. Interior Design made by experts for the function and purpose in the conception of decoration. Therefore, Universities we responsible to educate for more capable professional designers. But management is the first concern for Interior Design Company students are going to work at. Interior Design has not the important state yet in Korea, it is hard to manage the company with design alone. As architecture must get admittion, design is apart from construction. but they are worked together in Interior Design. It is true that all the work of construction is Capenters' or technical engineers' work except space design. Of course students are interested in just design not in construction. Students majoring in design need wide understanding of construction not a concept design. but detailed design for construction and proper valuation ability to manage company. I propose component and practical use of nude construction department to understand detailed design.

  • PDF

Analysis of Curriculum Management for Building Construction in Domestic Universities (국내 대학의 건축시공 교육과정 운영실태 분석)

  • Lim, Hyeong-Eun;Kim, Eun-Ho;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.76-77
    • /
    • 2019
  • Currently, there is a lack of studies on the directionality of architectural engineering education. This study has analyzed the opening and operation of courses relating to building construction in Korea universities. It was researched that the most common building construction courses opened in universities were 'building construction' and 'materials.' Courses are also being opened in universities by reflecting social demands. Upon analysis of the operation of the educational process of building construction, it was displayed that projects and examinations were conducted as the methods of assessment in courses at many universities. Additionally, there were universities that included quizzes and discussions in their methods of assessment. This study is expected to be used as data for studying an innovative means of educating architecture.

  • PDF

A study on the Importance of Risk Factor for Falling Accident in Construction Site (건설현장 추락재해의 위험요인 중요도 분석 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.63-64
    • /
    • 2018
  • The construction industry is one of the most prolific disaster-prone industries, particularly those that suffer from falling disasters compared to other industries. The safety accident at the construction site leads to social problems caused by massive loss of life and property, so it needs to be extra careful. The reason why falls are the most frequent accidents of the types of construction accidents is due to the analysis of the risk factors of safety accidents and the development of various construction methods. Therefore, in this study, the accident case for the fallen victims of construction site was analyzed and the risk factor was selected. Based on the safety expert survey, an importance analysis was performed. In conclusion, this study analyzes various risk factors that affect the occurrence of falls, identifies the importance of each factor, and presents basic data for safety accident prevention activities.

  • PDF

A study on the Improvement Plan of Construction Site Management In Korea (국내 건설 현장관리업무의 개선방안에 관한 연구)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.137-144
    • /
    • 2002
  • In the modern age. Building is getting higher and larger according to owner and social demands. Now when we are facing the need of the cost down and the reduction of economic loss. In this paper, the characteristics of the present conditions of site management were investigated with the field survey. And The Purpose of this study is to suggest the rational plans of construction planning in site management. The method of site management. however depends on experience of a construction manager. in order to solve this situation, it is necessary to create a method of site management that is adequate for the condition of construction. By cultivating excellent sub contractors, we can expect precise construction with a few experts. improvement in qualify of construction from standardization, computerization of each process. And the expectancies of this paper are that it can be used as efficient data for improvement of system to systematize site management work in Korea.

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

A Study for Conflict in Public Construction Projects Based on Online News (온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구)

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Lim, Jonglok;Nam, Jihyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF

A Study on the Application of Modular Construction Method for Demand Responsive Dormitory Facilities (수요대응형 기숙사시설을 위한 모듈러공법 적용 방안)

  • Kim, Han Eol;Lim, Hyoung Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.259-260
    • /
    • 2021
  • Currently, the school-age population continues to decline in Korea due to social factors. On the other hand, the dormitory facilities are constantly being built and renovated. There are many problems such as construction period and on-site waste when constructed with reinforced concrete structures, which are existing construction methods. Accordingly, dormitory facilities shall be constructed using appropriate construction methods. Therefore, in this study, we will collect and organize basic data on the use status and modular system of dormitory facilities and study efficient maintenance and management when modular construction method is applied to dormitory facilities with changing demand.

  • PDF

Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF