• Title/Summary/Keyword: snow melt

Search Result 31, Processing Time 0.021 seconds

Long-Term Runoff Simulation in Consideration of Snow Pack and Snow Melt (적설 및 융설의 영향을 고려한 장기유출 모의)

  • Kim, Dae Geun;Jeong, Jae Ung;Park, Jae Hyun;Park, Chang Geun
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.21 no.3
    • /
    • pp.265-272
    • /
    • 2007
  • This study uses the SWAT model to analyze the characteristics of long-term runoff at the Ssang-cheon Basin located in the city of Sokcho, which is located in the province of Gangwon. The study considers the effect of snow packing and snow melting in a runoff simulation. In this simulation, the study examines the need to introduce a snow pack and snow melt model to evaluate the water resources of the mountainous region of the Gangwon province. The findings of this study indicate that the runoff hydrograph that was produced approximates the true measured flow when the effect of the snow pack and snow melt are considered, compared to when they are not factored in. The analysis of the flow duration curve indicates that the stream flow largely increases when the effect of the snow pack and snow melt are considered. The wet stream flow was shown to increase by nearly 3% due to the melting effect, while the normal stream flow, low stream flow and drought stream flow were shown to increase by slightly more than 10%. Specifically, it was found that as the stream flow decreases, the effect of the snow pack and snow melt on the stream flow increases.

A Tank Model Application to Soyanggang Dam and Chungju Dam with Snow Accumulation and Snow Melt (적설 및 융설 모의를 포함한 탱크모형의 소양강댐 및 충주댐에 대한 적용)

  • Lee, Sang-Ho;An, Tae-Jin;Yun, Byung-Man;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.851-861
    • /
    • 2003
  • Snow accumulation and snow melt was simulated and included in the computation of the watershed runoff for Soyanggang Dam and Chungju Dam. A modified Tank Model was used for the simulation, which has three serial tanks and a pulse response function. The model parameters were estimated through the global optimization method of Shuffled Complex Evolution-University of Arizona (SCE-UA). A watershed was divided into four zones of elevation. The temperature decrease of the zones was a rate of -0.6$^{\circ}C$/100m. Almost all precipitation from December to February become accumulated as snow, and then the snow melts and runs off from March to April. The average runoff with snow melt was greater than the average runoff without snow melt during the period from March to April. The improved amount from snow melt simulation was about one fifth of the observed one for Soyanggang Dam. The increased amount for Chungju Dam was about one fourth of the observed average runoff during the same period. Although the watershed runoff was simulated including snow melt, it was less than the observed one for both of the dams.

Evaluation of SWMM Model Adjustment for Rubber-tired Tram Disaster Management System against the Snow-melt during the Winter (겨울철 융설을 대비한 바이모달 트램 재해관리 시스템의 SWMM 모형 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.56-60
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the urban flash flooding and snow pack melt/freezing due to unexpected rainfall event and snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snowfall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for snow removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system predicted data.

  • PDF

Snow Melting Simulation of Gwangdong Dam Basin in the Spring Season Using Developed K-DRUM Model (K-DRUM 모형의 개선을 통한 광동댐 유역의 봄철 융설 모의)

  • Kim, Hyeon Sik;Kang, Shin Uk;Hwang, Phyil Sun;Hur, Young Teck
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6B
    • /
    • pp.355-361
    • /
    • 2012
  • Gwangdong Dam Watershed is affected by the increased discharge caused by the melting snow in the spring season. Therefore, simulation results obtained using hydrologic models have generally been inaccurate in relation to discharge without snow pack and melt modules. In this research, a grid based distributed rainfall runoff model (K-DRUM) was developed using a snow pack and melt module, and has been applied in the Gwangdong Dam Watershed to simulate the discharge for a four year period. A previous version of K-DRUM, which does not include a snow pack or melt module, was used to calculate the discharge in order to compare the snow melt effect. The simulation period lasted about 7 months from October of the previous year to April of this year using hourly precipitation and weather observed data. To evaluate the model performance, NSE, PBIAS and RSR statistics techniques were applied using the simulation results of the discharge. From the results of reliability evaluation, the K-DRUM model, which uses a snow pack and melt module, had a good applicability for the runoff simulation considering the snow melt effect in the spring.

Evaluation of SWMM Snow-melt Module to Secure Bi-Modal Tram Operation (바이모달 트램 운행 안전성 확보를 위한 SWMM 융설 모듈 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.441-448
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the show pack melt/freezing due to unexpected snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snow-fall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for know removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system prediction.

Current and Future Changes in Northern Hemisphere Snow Extent and Their Potential Linkages with Atmospheric Circulation (현재와 미래의 북반구 눈피복 변화와 대기순환과의 잠재적인 상관성)

  • Choi, Gwang-Yong;Kim, Jun-Su;Robinson, David A.
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.294-298
    • /
    • 2008
  • Snow cover is a potential water resource for later spring and summer seasons as well as a thermal mirror with high reflectivity causing decreases of surface air temperature during cold winter seasons. In this study, current and future changes in Northern Hemisphere snow extent and their potential linkages with atmospheric circulation are examined. The NOAA AVHRR visible snow extent (1967-2006) data as well as observational (NCEP-DOE 1979-2006) and modeled (GFDL 2.1 2081-2100) pressure and surface air temperature data are used. Analyses of observational data demonstrate that the snow extent in meteorological spring (March to April) and summer (June to August) has significantly decreased since the late 1980s. The offset of snow seasons (the timing of snow melt in spring) have also significantly advanced particularly in Europe, East Asia, and northwestern North America. Analyses of pressure fields reveal that the spatial patterns of the earlier snow melt are associated with changes in atmospheric circulation such as the Arctic Oscillation (AO). In the positive winter AO years, multiple positive pressure departure cores in the upper troposphere (200hPa) are observed over the mid-latitude regions from March to mid-April, while a negative pressure departure core (70hPa) prevails over the Arctic Ocean. The reversed anomaly patterns related to later snow melt occur in negative winter AO years. The comparison between current and future thermal spring onsets suggest that snow melt patterns will intensify with larger greenhouse gas emissions, indicating earlier hydrological spring onset.

  • PDF

Application of K-DRUM Model for Pakistan Kunhar River Basin Considering Long-term Snow Melt and Cover (장기 융·적설을 고려한 파키스탄 Kunhar강 유역 K-DRUM모형 구축 및 적용)

  • Park, Jin Hyeog;Hur, Young Teck;Noh, Joon Woo;Kim, Seo-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2237-2244
    • /
    • 2013
  • In this study, physics based K-DRUM(K-water Distributed RUnoff Model) using GIS spatial hydrologic data as input data was developed to account for the temperature variation according to the altitude change considering snow melt and cover. The model was applied for Pakistan Kunhar River Basin($2,500km^2$) to calculate long-term discharge considering snow melt and cover. Time series analysis of the temperature and rainfall data reveals that temperature and rainfall of the river basin differs significantly according to altitude change compared to domestic basin. Thus, applying temperature and altitude lapse rate during generate input data generation. As a result, calculated discharge shows good agreement with observed ones considering snow melt and accumulation characteristic which has the difference of 4,000 meter elevation above sea level. In addition, the simulated discharge strongly showed snow melting effect associated with temperature rise during the summer season.

Simulation of Soil Erosion due to Snow Melt at Alpine Agricultural Lands (고령지 농경지에서 융설에 의한 토양유실량 모의)

  • Heo, Sung-Gu;Lim, Kyoung-Jae;Kim, Ki-Sung;Myung, SaGong;An, Jae-Hun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.241-246
    • /
    • 2005
  • Doam watershed is located at alpine areas in the Kangwon province. The annual average precipitation, including snow accumulation during the winter, at the Doam watershed is significantly higher than other areas. Thus, pollutant laden runoff and sediment discharge from the alpine agricultural fields are causing water quality degradation at the Doam watershed. To estimate soil erosion from the agricultural fields, the Universal Soil Loss Equation (USLE) has been widely used because of its simplicity to use. The USLE rainfall erosivity (R) factor is responsible for impacts of rainfall on soil erosion. Thus, use of constant R factor for the Doam watershed cannot reflect variations in precipitation patterns, consequently soil erosion estimation. In the early spring at the Doam watershed, the stream flow increases because of snow melt, which results in erosion of loosened soil experiencing freezing and thaw during the winter. However, the USLE model cannot consider the impacts on soil erosion of freezing and thaw of the soil. Also, it cannot simulate temporal changes in USLE input parameters. Thus, the Soil and Water Assessment Tool (SWAT) model was investigated for its applicability to estimate soil erosion at the Doam watershed, instead of the widely used USLE model. The SWAT hydrology and erosion/sediment components were validated after calibration of the hydrologic component. The $R^2$ and Nash-Sutcliffe coefficient values are higher enough, thus it was found the SWAT model can be efficiently used to simulate hydrology and sediment yield at the Doam watershed. The effects of snow melt on SWAT estimated stream flow and sediment were investigated using long-term precipitation and temperature data at the Doam watershed. It was found significant amount of flow and sediment in the spring are contributed by melting snow accumulated during the winter. Thus, it is recommend that the SWAT model capable of simulating snow melt and long-term weather data needs to be used in estimating soil erosion at alpine agricultural land instead of the USLE model for successful soil erosion management at the Doam watershed.

  • PDF

A Study on Field Applicability of Underground Electric Heating Mesh (매설용 전기 발열 매시의 융설 효과에 대한 현장 적용성 연구)

  • Suh, Young-Chan;Seo, Byung-Seok;Song, Jung-Kon;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • PURPOSES : This study aims to investigate the snow-melt effects of an underground electric heater's snow-melt system via a field performance test, for evaluating the suitability of the system for use on a concrete pavement. The study also investigates the effectiveness of dynamic measures for clearing snow after snowfall events. METHODS : In order to check the field applicability, in November 2010, specimens were prepared from materials used for constructing concrete pavements, and underground electric heating meshes (HOT-mesh) were buried at depths of 50 mm and 100 mm at the site of the Incheon International Airport Construction Research Institute. Further, an automatic heating control system, including a motion sensor and pavement-temperature-controlled sensor, were installed at the site; the former sensor was intended for determining snow-melt effects of the heating control system for different snowfall intensities. Pavement snow-melt effects on snowy days from December 2010 to January 2011 were examined by managing the electric heating meshes and the heating control system. In addition, data on pavement temperature changes resulting from the use of the heating meshes and heating control system and on the dependence of the correlation between the outdoor air temperature and the time taken for the required temperature rise on the depth of the heating meshes were collected and analyzed. RESULTS : The effects of the heating control system's preheat temperature and the hot meshes buried at depths of 50 mm and 100 mm on the melting of snow for snowfalls of different intensities have been verified. From the study of the time taken for the specimen's surface temperature to increase from the preheat temperature ($0^{\circ}C$) to the reference temperature ($5{\sim}8^{\circ}C$) for different snowfall intensities, the correlation between the burial depth and outdoor air temperature has been determined to be as follows: Time=15.10+1.141Depth-6.465Temp CONCLUSIONS : The following measures are suggested. For the effective use of the electric heating mesh, it should be located under a slab it may be put to practical use by positioning it under a slab. From the management aspect, the heating control system should be adjusted according to weather conditions, that is, the snowfall intensity.

Skid Resistance of the Sidewalks in Winter (겨울철 보도 미끄럼 저항)

  • Kim, Yong Seok
    • International Journal of Highway Engineering
    • /
    • v.15 no.6
    • /
    • pp.17-23
    • /
    • 2013
  • PURPOSES : This study aimed to measure the skid resistance of the sidewalk in order to find out the relationship between different surface types and skid resistance. By using British Pendulum Tester, skid resistance of sidewalk was measured in a wet after snow-melt, sludgy, and snowy conditions. METHODS : The skid resistance was measured on surfaces including Concrete Interlocking Block Paving, Colour Asphalt Pavement, Granite Block Paving, Manhole, and Tactile Paving for Visually Impaired. Five trials at each measurement were made, and the average and standard deviation were derived. RESULTS : The skid resistance measured in wet after snow-melt, sludgy, and snowy conditions for the various surface types are summarized and compared. Reduction rates of skid resistance of sludgy and snowy against wet after snow-melt are also analysed. The skid resistance variation between measurement points which mimic pedestrian route in study site are analysed to check out the consistency of the skid resistance along the sidewalk. CONCLUSIONS : The study concluded that the skid resistance of sidewalk surfaces varied depending on the surface types and weather conditions. Secondly, reduction rates of skid resistance according to weather changes are varied depending on the surface types, Thirdly, consistency of skid resistance along the pedestrian route is hardly acquired in the study site at least. So, future study on the consistency evaluation for skid resistance along sidewalk is strongly recommended.