• Title/Summary/Keyword: small batch manufacturing

Search Result 37, Processing Time 0.025 seconds

Establishment of Standard Time for Stranding Process of A Cable Company in Small Quantity Batch Production System (전선제조 연합공정의 표준시간 설정 - 다품종소량생산시스템을 중심으로 -)

  • Lee, Kyoung-Jong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.95-102
    • /
    • 2012
  • It is not easy to establish the correct standard time and standard manhour in a process of small quantity batch production system, especially in a case of irregular quantity of production. Therefore, how to establish rational standard time about manufacturing process of a power cable company which is representative business for small quantity batch production system will be suggested in this paper. Furthermore, how to establish standard manhour which can be used for effective control of labor productivity will also be presented.

Batch Scheduling Algorithm with Approximation of Job Completion Times and Case Studies (작업완료시각 추정을 활용한 배치 스케줄링 및 사례 연구)

  • Kim, Song-Eun;Park, Seong-Hyeon;Kim, Su-Min;Park, Kyungsu;Hwang, Min Hyung;Seong, Jongeun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.23-32
    • /
    • 2020
  • Many small and medium-sized manufacturing companies process various product types to respond different customer orders in a single production line. To improve their productivity, they often apply batch processing while considering various product types, constraints on batch sizes and setups, and due date of each order. This study introduces a batch scheduling heuristic for a production line with multiple product types and different due dates of each order. As the process times vary due to the different batch sizes and product types, a recursive equation is developed based on a flow line model to obtain the upper bound on the completion times with less computational complexity than full computation. The batch scheduling algorithm combines and schedules the orders with same product types into a batch to improve productivity, but within the constraints to match the due dates of the orders. The algorithm incorporates simple and intuitive principles for the purpose of being applied to small and medium companies. To test the algorithm, two case studies are introduced; a high pressure coolant (HPC) manufacturing line and a press process at a plate-type heat exchanger manufacturer. From the case studies, the developed algorithm provides significant improvements in setup frequency and thus convenience of workers and productivity, without violating due dates of each order.

Manual Application of Adhesives

  • Hellmanns, Mark;Bohm, Stefan;Dilger, Klaus
    • Journal of Adhesion and Interface
    • /
    • v.7 no.4
    • /
    • pp.24-27
    • /
    • 2006
  • International standards claim the best possible reliability in industrial manufacturing processes. This is also essential for the application with manual applicators. The application of adhesives with manual applicators is one of the most frequently used application techniques. The range of application reaches from the building of prototypes in the automobile industry over the use in single or small-batch manufacturing up to applications in crafts enterprises. Conventional manual applicators for adhesives and sealants don't fulfill the demands in international standards for the best possible reliability. Only the worker is able to control the quality and the quantity of the bond. A velocity-controlled manual applicator solves these restrictions. Special sensors and micro controllers calculate the flow-rate, the velocity and the location of the manual applicator. This leads to stable and repeatable application processes which are claimed in international standards. The location of the bond can be compared with the nominal value, so that it is possible to check the quality of the bond during application. Furthermore there is the potential to document the data of the manufacturing process.

  • PDF

MILP model for short-term scheduling of multi-purpose batch plants with batch distillation process

  • Ha, Jin-Juk;Lee, Euy-Soo
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1826-1829
    • /
    • 2003
  • Fine chemical production must assure high-standard product quality as well as characterized as multi-product production in small volumes. Installing high-precision batch distillation is one of the common elements in the successful manufacturing of fine chemicals, and the importance of the process operation strategy with quality assurance cannot be overemphasized. In this study, we investigate the optimal operation strategy and production planning of a sequential multi-purpose plants consisting of batch processes and batch distillation with unlimited intermediate storage. We formulated this problem as an MILP model. A mixed-integer linear programming model is developed based on the time slot, which is used to determine the production sequence and the production path of each batch. Illustrative examples show the effectiveness of the approach.

  • PDF

A Study on the Digitalization of the Fashion Industry

  • Lee, Mi-Ryang;Kim, Moon-Sook
    • The International Journal of Costume Culture
    • /
    • v.4 no.2
    • /
    • pp.124-137
    • /
    • 2001
  • The digitalization of the fashion industry refers to 'the reception of the digital environment by the industry.'Re paper presented 3 conceptual categories of 'technological environment','information environment'and 'business environment'concerning the scope of digitalization, including from the introduction and use of new technical media to new ways of thinking following the paradigm changes. And it demonstratively analyzed digitalization factors and digitalization level of fashion businesses related to the factors by 7 fashion categories. The analytic result and its suggestions are as follows. First, the five digitalization factor of the fashion industry are defined : manufacturing Process automation, computer systemization, information networking, e-business, and small batch production. Second the digitalization degree of fashion firms decreases in the order of information networking, small batch Production, manufacturing Process automation, computer systemization, and e-business, with information networking on the top and e-business, recent focal point of interest, at the bottom. Third, as for the digitalization of each clothing category, men's formal dress and unisex display the highest level of the general digitalization.

  • PDF

A Case Study of the Construction of Smart Factory in a Small Quantity Batch Production System: Focused on IDIS Company (다품종 소량 생산 체제의 스마트 공장 구축 사례: (주) IDIS를 중심으로)

  • Oh, sea-nam;Park, won-chul;Riew, Moon Charn;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.1
    • /
    • pp.11-26
    • /
    • 2018
  • Purpose: This study is to help the construction of smart factories of other manufacturing enterprises through IDIS 's case of smart factory construction. Methods: We introduce the four phases of implementing smart factory building by IDIS company, which produces a small quantity of multi-odd units. Results: Through the smart factory construction, the cost of product is reduced due to the improvement of total productivity such as office work, production work, and energy saving, and sales are enhanced by customized production, quality / delivery reliability improvement. Conclusion: We present the actual examples needed to build the manufacturer's smart factory.

Analysis of Shaping Parameters Influencing on Dimensional Accuracy in Single Point Incremental Sheet Metal Forming (음각 점진성형에서 치수정밀도에 영향을 미치는 형상 파라미터 분석)

  • Kang, Jae Gwan;Kang, Han Soo;Jung, Jong-Yun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.4
    • /
    • pp.90-96
    • /
    • 2016
  • Incremental sheet forming (ISF) is a highly versatile and flexible process for rapid manufacturing of complex sheet metal parts. Compared to conventional sheet forming processes, ISF is of a clear advantage in manufacturing small batch or customized parts. ISF needs die-less machine alone, while conventional sheet forming requires highly expensive facilities like dies, molds, and presses. This equipment takes long time to get preparation for manufacturing. However, ISF does not need the full facilities nor much cost and time. Because of the facts, ISF is continuously being used for small batch or prototyping manufacturing in current industries. However, spring-back induced in the process of incremental forming becomes a critical drawback on precision manufacturing. Since sheet metal, being a raw material for ISF, has property to resilience, spring-back would come in the case. It is the research objective to investigate how geometrical shaping parameters make effect on shape dimensional errors. In order to analyze the spring-back occurred in the process, this study experimented on Al 1015 material in the ISF. The statistical tool employed experimental design with factors. The table of orthogonal arrays of $L_8(2^7)$ are used to design the experiments and ANOVA method are employed to statistically analyze the collected data. The results of the analysis from this study shows that the type of shape and the slope of bottom are the significant, whereas the shape size, the shape height, and the side angle are not significant factors on dimensional errors. More error incurred on the pyramid than on the circular type in the experiments. The sloped bottom showed higher errors than the flat one.

Production Data Utilization System for Improving the Competitiveness of SMEs (중소기업 경쟁력 향상을 위한 생산현황 데이터 활용 시스템)

  • Lee, Seung-Woo;Nam, So-Jeong;Lee, Jai-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.37 no.2
    • /
    • pp.55-61
    • /
    • 2014
  • Recently, the manufacturing system is being changed in a mass customization and small quantity batch production. MES is a powerful production management tool supporting production optimization from the process initiation to the final shipment. It is a production management system which plans and executes based on the production data in the shop floor. This study deployed the utilization of production data and web HMI system to process real-time production data through the collection with the shop floor. The developed system was applied to the equipment operating time and other production data could be processed with the real-time. The proposed system and web HMI can be applied for various production systems by using different logic.

Effect of Cutting Conditions on Surface Roughness in CNC Lathe C-axis Milling Cutting (CNC선반 C축 밀링가공에서 표면 거칠기에 미치는 절삭조건의 영향)

  • Shin, Kuk-Sik
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.11 no.3
    • /
    • pp.110-115
    • /
    • 2012
  • For domestic aircraft industry, not mass production of components is limited, small production scale of the order is made by part because many kinds of hundreds of thousands of kinds of small quantity batch production system are taking. But the high reliability and stability are required during the processing because they require high precision parts are required. It is found that when C-axis rotation speed was increased, the diameter of the cutting tool decreased with increasing surface roughness, while the turn-mail feed rate was increased with increasing the surface roughness.

A Case Study on the Aggregate Planning of Multi-product Small-batch Production Facilities: Focusing on System Dynamics Simulation Modeling (다품종 소량생산 설비의 총괄생산계획에 관한 사례 연구: 시스템다이내믹스 시뮬레이션 모델링을 중심으로)

  • Lee, Seungdoe;Kim, Sang Won
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.1
    • /
    • pp.153-167
    • /
    • 2022
  • Purpose: The purpose of this study is to guide the operation managers who plan daily production of large mass-processing facility that services multi-customers with multi-product, small-batch item characteristics by providing the practical best production quantity and the inventory allowed to build. Methods: Close observation of a subcontract paint-shop operator captured the daily decision process which was reflected in the subcontractor-unique mathematical model and the system dynamics simulation model. Multiple simulations were run to find the practical best production quantity and the maximum allowable stock level of inventory that did not undermine the profit from practical best daily production. Actual data and a few constant values were obtained from the firm under study. Results: While the inventory holding cost for the customer-owned material harms the total profit of the subcontractor, the running cost of the processing facility hinders production in small batches. This balances the maximum possible productions and results in practical best daily production which can be found through simulation runs with actual data. The maximum level of stocked inventory is deduced from the practical best daily production. Conclusion: To build a large volume that enables economy-of-scale production, operators should deal with multi-product small-batch items from multiple customers. When the planned schedule of the time and amount of material in-flow tend not to be reliable, operators can find it practical to execute level production across the planning horizon instead of adjusting to day-to-day in-flow fluctuations.