Browse > Article
http://dx.doi.org/10.7469/JKSQM.2022.50.1.153

A Case Study on the Aggregate Planning of Multi-product Small-batch Production Facilities: Focusing on System Dynamics Simulation Modeling  

Lee, Seungdoe (Hankuk Metal Co., LTD.)
Kim, Sang Won (College of Business Administration, University of Ulsan)
Publication Information
Abstract
Purpose: The purpose of this study is to guide the operation managers who plan daily production of large mass-processing facility that services multi-customers with multi-product, small-batch item characteristics by providing the practical best production quantity and the inventory allowed to build. Methods: Close observation of a subcontract paint-shop operator captured the daily decision process which was reflected in the subcontractor-unique mathematical model and the system dynamics simulation model. Multiple simulations were run to find the practical best production quantity and the maximum allowable stock level of inventory that did not undermine the profit from practical best daily production. Actual data and a few constant values were obtained from the firm under study. Results: While the inventory holding cost for the customer-owned material harms the total profit of the subcontractor, the running cost of the processing facility hinders production in small batches. This balances the maximum possible productions and results in practical best daily production which can be found through simulation runs with actual data. The maximum level of stocked inventory is deduced from the practical best daily production. Conclusion: To build a large volume that enables economy-of-scale production, operators should deal with multi-product small-batch items from multiple customers. When the planned schedule of the time and amount of material in-flow tend not to be reliable, operators can find it practical to execute level production across the planning horizon instead of adjusting to day-to-day in-flow fluctuations.
Keywords
System Dynamics Simulation; Subcontract Manufacturing; Operation Performance Measures;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Aouam T & Brahimi N. 2013. Integrated production planning and order acceptance under uncertainty: A robust optimization approach. European Journal of Operational Research 228(3):504-515.   DOI
2 APICS. 2002. Apics dictionary. 10 ed. Alexandria, VA.
3 Berry WL & Cooper MC. 1999. Manufacturing flexibility: Methods for measuring the impact of product variety on performance in process industries. Journal of Operations Management 17(2):163-178.   DOI
4 Chong HR, Bae KH, Lee MK, Kwon HM, & Hong SH. 2020. Quality strategy for building a smart factory in the fourth industrial revolution. J Korean Soc Qual Manag. 48(1):87-105.   DOI
5 Forrester JW. 1958. Industrial dynamics - a major breakthrough for decision makers. Harvard Business Review 36(4):37-66.
6 Sterman J, Oliva R, Linderman KW, & Bendoly E. 2015. System dynamics perspectives and modeling opportunities for research in operations management. Journal of Operations Management 39(40):1-5.
7 Kang S-M. 2012. Analysis of subcontract business performance in consideration of company transactional relations : Shipbuilding, automobile, electrical and electronics. Korean Jouranl of Business Administration 25(4):2157-2183.
8 Lee HC & Choi IC. 2004. Parallel machine scheduling for small-size batch production with sequence dependent setup times larger than processing times. Journal of the Korean Society of Supply Chain Management. 4:35-43.
9 Seo CS & An OH. 2019. A structural analysis of the factors affecting productivity performance: Based on sme of manufacturing certified the pms. J Korean Soc Qual Manag. 47(2):295-314.   DOI
10 Wong J-T, Su C-T, & Wang C-H. 2012. Stochastic dynamic lot-sizing problem using bi-level programming base on artificial intelligence techniques. Applied Mathematical Modelling 36(5):2003-2016.   DOI
11 Salamati-Hormozi H, Zhang Z-H, Zarei O, & Ramezanian R. 2018. Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing. Computers & Industrial Engineering 126:421-434.   DOI
12 Kwak S-I, Choi K-H, & Kim S-W. 2005. A dynamic resource allocation on service quality of internet shopping-mall. J Korean Soc Qual Manag. 33(4):21.
13 Bersch CV, Akkerman R, & Kolisch R. 2021. Strategic planning of new product introductions: Integrated planning of products and modules in the automotive industry. Omega 105:102515.   DOI
14 Betts JM & Johnston RB. 2005. Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand. International Journal of Production Economics. 95(1):51-70.   DOI
15 Djordjevic I, Petrovic D, & Stojic G. 2019. A fuzzy linear programming model for aggregated production planning (app) in the automotive industry. Computers in Industry 110:48-63.   DOI
16 Filho MG & Uzsoy R. 2010. The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment. International Journal of Advanced Manufacturing Technology 52(5-8):669-681.   DOI
17 Ha JY, Lee SH, Na MH, Kim DH, Lim LH, & Lee YG. 2021. The analysis of the management efficiency and impact factors of smart greenhouse business entities - focusing on the business entities of strawberry cultivation in jeolla-do. J Korean Soc Qual Manag. 49(2):213-231.   DOI
18 Hopp JW, Spearman ML. 2000. Factory physics : Foundations of manufacturing management. 2 ed. Chicago.
19 Lee CW, Shin YH, Shang M, & Ryu YS. 2020. A study on improvement of organizational culture of the members of manufacturing and service industry quality control : Focused on mediation effect of job satisfaction. J Korean Soc Qual Manag. 48(1):29-50.   DOI
20 Pound ES, Bell JH, & Spearman ML. 2014. Factory physics for managers: How leaders improve performance in a post-lean six sigma world. McGraw-Hill Education.