• Title/Summary/Keyword: siting system

Search Result 44, Processing Time 0.027 seconds

A Study on Siting Criteria for GBAS Ground System (GBAS 지상시스템 설치후보지 선정 기준에 관한 연구)

  • Jeong, Myeong-Sook;Ko, Youri;Choi, Chul Hee;Ko, Wan-Jin;Bae, Joongwon;Jun, Hyang-Sig;Kim, Dong-Min
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.3
    • /
    • pp.8-15
    • /
    • 2012
  • Since the site chosen for GBAS ground system will have a direct effect on the performance of the GBAS, the GBAS ground system siting is mightily important in the GBAS installation process. Therefore, in this paper, the major equipment of the GBAS ground system is introduced and a formal process is described for the identification and evaluation of candidate GBAS sites. Also, this paper described detail siting requirements for the GBAS ground system such as reference receiver, VDB antenna and shelter respectively.

Optimal Siting of UPFC for Reducing Congestion Cost by using Shadow Prices

  • Lee, Kwang-Ho;Moon, Jun-Mo
    • KIEE International Transactions on Power Engineering
    • /
    • v.11A no.4
    • /
    • pp.21-26
    • /
    • 2001
  • As competition is introduced in the electricity supply industry, congestion becomes a more important issue. Congestion in a transmission network occurs due to an operating condition that causes limit violations on the transmission capacities. Congestion leads to inefficient use of the system, or causes additional costs (Congestion cost). One way to reduce this inefficiency or congestion cost is to control the transmission flow through the installation of UPFC (Unified Power Flow Controller). This paper also deals with an optimal siting of the UPFC for reducing congestion cost by using shadow prices. A performance index for an optimal siting is defined as a combination of line flow sensitivities and shadow prices. The proposed algorithm is applied to the sample system with a condition, which is concerning the quadratic cost functions. Test results show that the siting of the UPFC is optimal to minimize the congestion cost by the proposed algorithm.

  • PDF

A Study on Selection of Proposed Waste Facilities Sites using Geographic Information System (지리정보체계를 이용한 일반폐기물 매립후보지의 입지선정에 관한 연구)

  • Bae, Min-Ki;Chang, Byung-Moon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.1 no.2
    • /
    • pp.14-25
    • /
    • 1998
  • The purpose of this paper is to select proposed waste facilities sites after consideration of relative importance of siting factors. From the literature review we have established the siting factors affecting selecting waste facilities sites, and constructed hierarchy of siting factors to evaluate the relative importance of the factors using Analytical Hierarchy Process(AHP). After mail surveying of expert group, we have analyzed the relative importance of siting factors affecting waste facilities. We have constructed Geographic Information System(GIS) of raster type, based on seventeen theme maps of siting factors on waste facilities, to select the proposed waste facilities sites after consideration of the relative importance of the siting factors for Gyongsan city, in Korea. After applying linear combination method, and factor combination method to overcome the methodological limitations of land suitability analysis, we have found five proposed sites, where intersected with proposed sites obtained from the two methods. From this research we have found that 1) methodologically, using GIS for selection of proposed waste facilities sites turned out to be highly useful, 2) application of relative importance of siting factors and two methods of land suitability analysis in selection of proposed waste facilities sites are pertinent enough to provide valid and reliable results, and 3) the research methods and approach employed in this research will be highly useful in site selection of other major facilities.

  • PDF

NPP Site Selection : A Systems Engineering Approach (시스템즈 엔지니어링 기법을 이용한 원자력발전소 부지 선정 방법에 대한 연구)

  • Pwani, Henry;Kamanja, Florah;Zolkaffly, Zulfakar;Jung, J.C.
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.1
    • /
    • pp.55-63
    • /
    • 2013
  • Nuclear power plant site selection is a complex process and its successful completion is a critical milestone in the NPP development cycle. Proper siting of NPP will ensure public health and safety, environmental conservation, reduced project failure risks and a smooth NPP development process among other benefits. The objective of this paper is to demonstrate the application of systems engineering to the problem of NPP siting in Kenya. The siting process demonstrated in this paper includes stakeholder need analysis where stakeholders are identified and their needs concerning NPP site are elicited and converted into system functional requirements. A value model is then developed and potential sites iteratively subjected to three types of criteria i.e. exclusionary criteria, avoidance criteria and suitability criteria. This process is used to identify the candidate sites. An additive value model; multiple objectives Decision Analysis (MODA) is then used to calculate candidate solutions values. The site with the highest solution value score is selected. Sensitivity studies using different criterion weight sets (thereby reflecting different viewpoints) can be conducted to assess their effect on the selection of a preferred site and thereby lend additional credibility to the decision process.

GIS Analysis on Siting Strategy of Offshore Wind Farm (해상풍력단지 입지전략 GIS 분석)

  • Song, Kyu-Bong;Kim, Hyun-Goo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.460-462
    • /
    • 2009
  • This study has analyzed the scale, location, resource potential and feasibility of offshore wind farm scientifically and systematically based on the national wind map and GIS (Geographic Information System). For long-term wind power development, this study pursues siting strategy building, selection of target area and deciding development priority as well as the presenting a basis for assessment that are necessary for policy decision making by making theme layers under GIS environment. According to the analysis after organizing technological development by stages, even if only the most suitable sites are developed among the area of offshore wind farm candidates that can be developed under the current technological standard, it has been evaluated as being able to develop about 3 times of the wind power dissemination target until 2012. It is expected that about 5% of territorial water area can be developed in a short-term future while the southern offshore area possessing relatively favorable wind resource than the western offshore has been identified as the most feasible site. While about 23% of territorial water area has been classified as potential area for offshore wind farm development in a long-term future, even Jeju Island and offshore of Ulsan possessing excellent wind resource have been analyzed as feasible sites. The feasibility assessment of offshore wind farm development established by this study is expected to assist national strategy building for accomplishing the wind power dissemination target.

  • PDF

Optimum Macro-Siting for Offshore Wind Farm Using RDAPS Sea Wind Model (RDAPS Sea Wind Model을 이용한 해상풍력발전단지 최적 Macro-Siting)

  • Lee, K.H.;Jun, S.O.;Park, K.H.;Lee, D.H.;Park, Jong-Po
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.286-290
    • /
    • 2011
  • This paper introduces the optimum macro-siting of a potential site for an offshore wind farm around Jeju Island using the RDAPS sea wind model. The statistical model was developed by analyzing the sea wind data from RDAPS model, and the meso-scale digital wind map was prepared. To develop the high resolution spatial calibration model, Artificial Neural Network(ANN) models were used to construct the wind and bathymetric maps. Accuracy and consistency of wind/bathymetric spatial calibration models were obtained using analysis of variance. The optimization problem was defined to maximize the energy density satisfying the criteria of maximum water depth and maximum distance from the coastline. The candidate site was selected through Genetic Algorithm(GA). From the results, it is possible to predict roughly a candidate site location for the installation of the offshore wind jam, and to evaluate the wind resources of the proposed site.

  • PDF

A Study on a Installation Siting for GBAS Category-I Ground System Implementation in Gimpo Airport (GBAS Cat-I 지상시스템 시범공항 구축을 위한 설치후보지 검토)

  • Bae, Joong-Won;Jeong, Myeong-Sook;Choi, Chul Hee;Ko, Wan-Jin;Ko, Youri;Jun, Hyang-Sig
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.4
    • /
    • pp.21-30
    • /
    • 2012
  • This paper presents site survey processes and the results for installing GBAS Category-I ground system into Gimpo international airport. For siting assessment, many things should be taken into account in advance, such as installation requirement of GBAS components, future airport development plan and possible interference effects to existing facilities. Because overall performance of GBAS system can be affected by GPS signal reception environment, on-site survey should be performed carefully to measure actual GPS environmental performance and determine if any adverse multipath or RFI problems exist or not. In addtion, VDB antenna should be located to ensure line of sight for transmitting VHF signal to deliver GBAS message to aircraft. Based on the survey results, final location for GBAS system installation is selected near runway 32 in the Gimpo airport.

Optimal Placement of Distributed Generators in Radial Distribution System for Reducing the Effect of Islanding

  • K, Narayanan.;Siddiqui, Shahbaz A.;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.551-559
    • /
    • 2016
  • The present trend of increasing the penetration levels of Distributed Generator (DG) in the distribution network has made the issue of Islanding crucial for the reliable operation of the network. The islanding, if not detected early may lead to the collapse of the system as it can drive the distribution system to the cascaded failure. In this paper, an extensive study of the effect of DG placement and sizing is performed by dividing the system into different zones to obtain a reduced effect of islanding. The siting and sizing of DG is carried out to improve the overall voltage profile or/and reduction in active power loss using two stage Genetic Algorithm (GA). In the first stage a basic knockout selection is considered and the best population is taken for next stage, where roulette selection for crossover and mutation is performed for optimal placement and sizing of DGs. The effect of the islanding, due to load variations is reduced by optimal siting and sizing of DG. The effectiveness of the proposed scheme is tested on the IEEE 33 and 69 radial bus systems and the results obtained are promising.

Damping Inter-area Low Frequency Oscillations in Large Power Systems with $H_{\infty}$ Control of TCSC PARTI : TCSC Siting (TCSC의 $H_{\infty}$ 제어에 의한 대규모 전력계통의 지역간 저주파진동 억제 PartI : 설치지점 선정)

  • Kim, Yong-Gu;Sim, Gwan-Sik;Song, Seong-Geun;Kim, Yeong-Hwan;Nam, Hae-Gon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.5
    • /
    • pp.226-232
    • /
    • 2000
  • This paper presents application results of the augmented matrix eigen-sensitivity theories to TCSC siting problem for damping the inter-area low frequency oscillation in the large KEPCO system. First and second-order eigen-sensitivities of the inter-area low frequency oscillation in the large KEPCO system. First and second-order eigen-sensitivities of the inter-area mode are computed fro changes in susceptance of the transmission lines. The lines having high sensitivity are chosen as the initial candidates for installing TCSC. Then for each of the chosen candidates, Bodeplot of the transfer function with line susceptance as the input and the bus voltage at one side of the line as the output is computed. Using the Bode plots, the lines having any zeros near the inter-area mode are screened out since design of TCSC controller is very difficult in such a case. The $H_{\infty}$ TCSC controller installed at any finally chosen candidate is found to be effective in damping the inter-area oscillation, and the proposed TCSC siting algorithm is proved to be valid. Design of $H_{\infty}$ controller is described in Part IIof this paper.

  • PDF

The Environmental Hazard Assessment of Siting Restricted Industries from Industrial Complex in Rural Area Applied by Chemical Ranking and Scoring System (화학적 등급화기법을 적용한 농공단지 입주제한업종의 환경유해성 평가)

  • Hong, Sang-Pyo
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.6
    • /
    • pp.549-560
    • /
    • 2015
  • The priorities of siting restriction was derived from quantification of environmental hazard according to industrial classification based on 'Chemical Ranking and Scoring System(CRS)' which is handling the discharge characteristics of 31 industrial classifications regulated from locating at 'Industrial Complex in Rural Area(ICRA)'. CRS that is utilizing the data of 'Pollutant Release and Transfer Registers(PRTR)' is applied to determine human health risk and ecological risk which are calculated by discharged amount and materials $LC_{50}$ according to water, soil and air media based on industrial classification. From this process, exposure assessment and toxicity assessment for integrating the adverse environmental impact and the mitigation effect of environmental risk according to the development of environmental technologies into establishing the rational landuse management method for the 31 industrial classifications regulated from locating at ICRA was analyzed. From the assessment result of the siting restriction removal at ICRA for 31 industrial classifications, based on 2012 year reference 6 industries that includes Manufacture of Guilt Coloration Surface Processing Steel Materials, Manufacture of Biological Product, Manufacture of Smelting Refining and Alloys of Copper, Dyeing and Finishing of Fibers and Yarns, Manufacture of Other Basic Iron and Steel n.e.c., Rolling Drawing and Extruding of Non-ferrous Metals n.e.c. are calculated as having relatively lower environmental hazards, thus it is judged that the siting restriction mitigation at ICRA is possible for the 6 industrial classifications that are not discharging the specific hazardous water contaminants during manufacturing process.