Browse > Article
http://dx.doi.org/10.12985/ksaa.2012.20.3.008

A Study on Siting Criteria for GBAS Ground System  

Jeong, Myeong-Sook (한국항공우주연구원 차세대항행팀)
Ko, Youri (한국항공우주연구원 차세대항행팀)
Choi, Chul Hee (한국항공우주연구원 차세대항행팀)
Ko, Wan-Jin (한국항공우주연구원 차세대항행팀)
Bae, Joongwon (한국항공우주연구원 차세대항행팀)
Jun, Hyang-Sig (한국항공우주연구원 차세대항행팀)
Kim, Dong-Min (한국항공우주연구원 차세대항행팀)
Publication Information
Journal of the Korean Society for Aviation and Aeronautics / v.20, no.3, 2012 , pp. 8-15 More about this Journal
Abstract
Since the site chosen for GBAS ground system will have a direct effect on the performance of the GBAS, the GBAS ground system siting is mightily important in the GBAS installation process. Therefore, in this paper, the major equipment of the GBAS ground system is introduced and a formal process is described for the identification and evaluation of candidate GBAS sites. Also, this paper described detail siting requirements for the GBAS ground system such as reference receiver, VDB antenna and shelter respectively.
Keywords
GBAS; Siting; Map & Paper Assessment; On-Site Assessment;
Citations & Related Records
연도 인용수 순위
  • Reference
1 전향식, 김동민, 염찬홍, "GBAS 인증체계기술 개발을 위한 환경구축 연구", 한국항공우주학회 추계학술발표회 논문집(II), 2010, pp. 1554-1557.
2 Honeywell, "GBAS Siting Plan", Version C, 2009
3 정명숙, 최철희, 고완진, 고유리, 배중원, 전향식, 김동민, "김포공항의 GPS 위성신호 수신환경 분석", 한국항공우주학회 춘계학술대회, 2012
4 RTCA Inc., "Minimum Aviation System Performance Standards for Local Area Augmentation System(LAAS)", Washington, D.C, RTCA/DO-245A, 2004
5 C. Shively, "Safety Concepts for Mitigation of Ionospheric Anomaly. Errors in GBAS", Proceedings of ION NTM 2008, San Diego, CA, January 28-30, 2008
6 Honeywell, "Work Instruction PortaSAT Setup and Configuration", Version 1.0, 2011
7 Garrett McKelvey, Pat Shannon, and Brian Koosmann, "Houston Intercontinental Airport(IAH) - Site Assessment Report", Honeywell, 2011
8 EUROCONTROL, "PEGASUS: Technical Notes on CMC", PEG-TN-CMC, 2008
9 Timothy A. Murphy, William M. Harris, Scott L. Pelton and Ngoc H. Bui, "Volume III - Multipath Flight Test Program & Results", D6-83447-3, 2005
10 John Warburton, "LAAS Test Prototype Data Collection and Processing", 7th International GBAS Working Group, 2007
11 John Warburton, "Technical Activities GBAS Integrity/HMI Update", 7th International GBAS Working Group, 2007