• Title/Summary/Keyword: site production management

Search Result 283, Processing Time 0.026 seconds

Factory Production Management of Modular Units Using MFD 2019 (MFD 2019를 활용한 모듈러 유닛의 공장생산 관리)

  • Lee, Doo-Yong;Nam, Sung-Hoon;Lee, Jae-Sub;Jung, Dam-I;Kim, Kyoung-rai;Cho, Bong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.139-146
    • /
    • 2019
  • The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.

A Production Planning for a Semiconductor Supply Chain Network with Volatilities (변동성이 존재하는 반도체 공급사슬 망을 위한 생산계획)

  • Shin, Hyun-Joon;Ryu, Jae-Pil
    • Journal of the Semiconductor & Display Technology
    • /
    • v.10 no.4
    • /
    • pp.71-77
    • /
    • 2011
  • This paper presents a production planning methodology for semiconductor manufacturing supply chain network with volatilities caused by uncertainties such as unstable demand and price. In order to take volatilities into account, we develop two approaches; 1) stochastic model with consideration of various cases and 2) deterministic model considering replanning cost, and propose efficient solution methods. Computational experiments show that the performance of the proposed method is superior to that of deterministic approach using various scenarios.

Study on the Management System of Oak Coppice Forest on Forest Fire Site (산불피해지 참나무 맹아림 시업체계에 관한 연구)

  • Lim, Joo-hoon;Ji, Dong-hun;Lee, Young-geun;Lee, Myung-bo
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.6
    • /
    • pp.652-658
    • /
    • 2009
  • This study was conducted to investigate the growing characteristics of oak sprouts which have developed naturally after fire and to suggest proper management system which is adapted for oak coppice forest by controlling the number of sprouts. We examined 3 burned sites and 9 unburned pine stands in Kangwondo. In the early years sprouts of oak coppice forest grew very slowly after fire compare to common oak coppice forest. But they had over than 10 cm of DBH after 15years, their DBH reached 10 cm and entered the stage of regeneration period. We also examined the effect of sprouts control. In the case of Quercus mongolica, stumps with 1 or 3 sprouts grew 1.3 m faster than the ones in the control stand. For Q. variabilis, stumps with 2 sprouts grew 0.9 m faster. In conclusion small timber production is proper for the oak coppice forest stand which is developed on the forest fire site and pruning or fertilizing is needed to shorten the production cycle.

A Study on the Revitalization Pattern of Industry in Decline: Focusing on Korean Shoe Industry

  • LEE, Kang-Sun;CHOI, Kyu-Jin;KANG, Sung-Wook;CHO, Dae-Myeong
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.10 no.4
    • /
    • pp.75-90
    • /
    • 2022
  • Purpose - This study aims to study the activation pattern of declining industries by applying the Gompertz growth model using available resources based on the theory of industrial life cycle, classifying declining industries among Korean manufacturing industries, and identifying resource input characteristics. Research design and methodology - This study was conducted by combining the Gompertz growth model that predicts the limit of output based on available resources under the industrial life cycle theory. Using Gompertz model, this study analyzed the life cycle of 39 Korean manufacturing industries from the perspective of domestic production, number of employees, and fixed assets Results - According to a life cycle analysis of 39 manufacturing industries in Korea, the computer, textile, and shoe industries were classified as declining industries. Among them, research on resource input characteristics on the shoe industry showed that domestic production and the number of employees decreased, while the proportion of domestic R&D personnel and the number of research departments gradually increased. Conclusion - Among the declining industries in Korea, the shoe industry is considered to revitalize the industry, that is, to extend the life of the declining industry by offshoring its production site and improving constitution with a "R&D center for global" support.

Optimal installation of electric vehicle charging stations connected with rooftop photovoltaic (PV) systems: a case study

  • Heo, Jae;Chang, Soowon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.937-944
    • /
    • 2022
  • Electric vehicles (EVs) have been growing to reduce energy consumption and greenhouse gas (GHG) emissions in the transportation sector. The increasing number of EVs requires adequate recharging infrastructure, and at the same time, adopts low- or zero-emission electricity production because the GHG emissions are highly dependent on primary sources of electricity production. Although previous research has studied solar photovoltaic (PV) -integrated EV charging stations, it is challenging to optimize spatial areas between where the charging stations are required and where the renewable energy sources (i.e., solar photovoltaic (PV)) are accessible. Therefore, the primary objective of this research is to support decisions of siting EV charging stations using a spatial data clustering method integrated with Geographic Information System (GIS). This research explores spatial relationships of PV power outputs (i.e., supply) and traffic flow (i.e., demand) and tests a community in the state of Indiana, USA for optimal sitting of EV charging stations. Under the assumption that EV charging stations should be placed where the potential electricity production and traffic flow are high to match supply and demand, this research identified three areas for installing EV charging stations powered by rooftop PV in the study area. The proposed strategies will drive the transition of existing energy infrastructure into decentralized power systems. This research will ultimately contribute to enhancing economic efficiency and environmental sustainability by enabling significant reductions in electricity distribution loss and GHG emissions driven by transportation energy.

  • PDF

A Study on Planning Aspects & Detailed Techniques in terms of Main Concept of Ecological Industrial Parks (생태산업단지 개념에서 본 계획측면과 세부수업에 관한 연구)

  • Jeong, Sook-Young;Oh, Deog-Seong
    • KIEAE Journal
    • /
    • v.2 no.1
    • /
    • pp.11-19
    • /
    • 2002
  • This Study aims to find out the planning aspects and detailed techniques in terms of concept of the Ecological Industrial Parks. It consists of the three parts : Firstly, according to theoretical review, this study gives a definition of the concept of ecological industrial parks. Secondly, it institutes planning aspects of ecological industrial parks based on the main concept. Thirdly, 8 case studies show us analysis of detailed techniques used each planning aspects. Ecological industrial parks mean industrial systems which make energy and substance circulated in order to reduce environmental pollutions inside and outside of park like natural ecosystem. To actualize ecological industrial parks, we have to adopt 3 planning aspects which are energy and substance recycling system, environmentally-friendly site planning based on ecology concept, constructing of ecological production and management. In case study, detailed techniques from each planning aspects are shown in table 8. As a result of case study, detailed techniques about planning of energy and substance recycling system is accommodated most. On the other hand, environmentally-friendly site planning techniques based on ecological concept is used passively. And detailed techniques about constructing of ecological production and management are very various as each cases. Finally, in terms of analysis, this study shows us appliable planning when we develop domestic Ecological industrial parks.

The Comparison and Analysis of Social Cost according to Emission of Carbon Dioxide through Case Study on the Site-Recycling of Waste Concrete (폐콘크리트의 현장재활용 사례를 통한 이산화탄소 배출에 따른 사회적 비용 비교분석)

  • Kwon, Soon-Boum;Lee, Jae-Sung;Jang, Seo-Yeon;Bae, Kee-Sun;Jung, Jong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.459-462
    • /
    • 2007
  • Recently, it has been important issue to recycle the rapid increase of construction waste. The site-recycling of construction waste has been one of alternatives to recycle construction waste. The economic superiority of site-recycling was shown in previous studies, but it is hardly studied in the Quantification of social costs from site-recycling. This study identified the generation of the carbon dioxide from the site-recycling and Quantified the social costs of it. Also, this study performed the comparison and analysis of the social costs of the carbon dioxide in accordance with the aggregate production from the site-recycling, processing on commission, and a stony mountain. The results of this study indicated that the site-recycling was the most effective in the social costs.

  • PDF

A Study on the Development and Effect of Smart Manufacturing System in PCB Line

  • Sim, Hyun Sik
    • Journal of Information Processing Systems
    • /
    • v.15 no.1
    • /
    • pp.181-188
    • /
    • 2019
  • A production system is a management system that supports all activities to perform production operations at the manufacturing site. From the point-of-view of a smart factory, smart manufacturing systems redesigned the concept of onsite production systems to fit the entire system and its necessary functional composition. In this study, we select the key functions needed to build a smart factory for a PCB line and propose a new six-step model for the deployment of a smart manufacturing system by integrating essential functions. The smart manufacturing system newly classified the production and operation tasks of PCB manufacturing and selected necessary functions through requirement analysis and benchmarking of advanced companies. The selected production operation tasks are mapped to the functions of the system and configured into seven modules, and the optimal deployment model is presented to allow flexible responses to the characteristics of the tasks. These methodologies are first presented in this study, and the proposed model was applied to the PCB line to confirm that they had significant changes in the work method, qualitative effects, and quantitative effects. Typically, lead time and WIP have reduced by about 50%.

Challenges of implementing the policy and strategy for management of radioactive waste and nuclear spent fuel in Indonesia

  • Wisnubroto, D.S.;Zamroni, H.;Sumarbagiono, R.;Nurliati, G.
    • Nuclear Engineering and Technology
    • /
    • v.53 no.2
    • /
    • pp.549-561
    • /
    • 2021
  • Indonesia has policies and strategies for the management of radioactive waste and spent nuclear fuel that arises from the use of nuclear research and development facilities, including three research reactors, and the use of radioisotopes in medicine and industries. The Indonesian government has provided extensive facilities such as an independent regulatory organization (BAPETEN) and a centralized radioactive waste management organization (CRWT-BATAN). Further, the presence of regulations and several international conventions guarantee the protection of the public from all risks due to handling radioactive waste and spent nuclear fuel. However, the sustainability of radioactive waste management in the future faces various challenges, such as disposal issues related to not only to site selection but also financing of radioactive waste management. Likewise, the problem of transportation persists; as an archipelago country, Indonesia still struggles to manage the infrastructure required for the transport of radioactive materials. The waste from the production of the radioisotopes, especially from the production of 99Mo, requires special attention because BATAN has never handled it. Indonesia should also resolve the management of NORM from various activities. In Indonesia, the definition of radioactive waste does not include NORM. Therefore, the management of this waste needs revision and improvement on the regulations, infrastructure, and technology.

A STUDY ON SELECTING OPTIMAL HAUL ROUTES OF EARTHMOVING MACHINE

  • Han-Seong Gwak;Chang-Yong Yi;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.513-516
    • /
    • 2013
  • Earthmoving equipment's haul-route has a great influence on the productivity of the earth work operation. Haul-route grade is a critical factor in selecting the haul-route. The route that has low grade resistance contributes to increase machine travel speed and production. This study presents a mathematical model called "Hauling-Unit Optimal Routes Selecting system" (HUORS). The system identifies optimal path that maximize the earth-work productivity. It consists of 3 modules, i.e., (1) Module 1 which inputs site characteristic data and computes site location and elevation using GIS(Geographical Information System); (2) Module 2 which calculates haul time; (3) Module 3 which displays an optimum haul-route by considering the haul-route's gradient resistances (i.e., from the departure to the destination) and hauling time. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model.

  • PDF