• Title/Summary/Keyword: site development project

Search Result 454, Processing Time 0.028 seconds

An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu (대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구)

  • Km, Han-Su;Kim, Cheol-Su
    • Journal of the Korean housing association
    • /
    • v.22 no.2
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

Current Practices of the Customer-Oriented Web Site Development Methodologies and their Evaluation (고객지향적 웹 사이트 개발 방법론의 현황과 평가)

  • 이선로;김기영
    • Journal of Information Technology Applications and Management
    • /
    • v.11 no.1
    • /
    • pp.15-37
    • /
    • 2004
  • This study attempts to investigate the industrial practices of the web site development methodologies and their impacts on the web site development project performance. Most of Korean web site development firms currently use customized component-based development(CBD) methodologies that have been internally developed. The methodologies generally being accepted by web site developers, however, did not emerge yet. In addition, this study shows that indiscreet applications of various methodologies and techniques might cause negative impacts on the project performance since the web site development projects are also exposed to most of the risk factors identified in the traditional systems development.

  • PDF

Design and Implementation of Project Learning Site by Using XML (XML을 이용한 프로젝트 학습사이트의 설계 및 구현)

  • Choe, Hyeon-Geun;Ha, Tae-Hyeon
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.613-628
    • /
    • 2005
  • The purpose of this study was to design and implementation of project learning site by using XML. The development of the Internet site for project learning was planned as per preparation, development and test/application stages. At the stage of preparation, literature and cases were reviewed to find the elements of design principles needed for development of a project learning program and those required in the actual development. At the stage of development, the elements of the design principles and those for the actual development, both explored from the stage of preparation were used to develop a draft Internet site for project learning. The elements used for the development of the Internet site for project learning were motivation, specification of learning goals, reminiscence of preceding knowledge, positive participation in teaching activities, learning-guide feedback, evaluation, reinforcement and correction. It is changing web based format. XML advent because of HTML limitations of web based internet and expand it's field. XML is able to gather data on HTML of text based format, thus it is possible to control it's inside. It is expected that many teachers apply this model to their classes and show realistic results.

  • PDF

Design and Implementation of Project Learning Site by Using XML (XML을 이용한 프로젝트 학습사이트의 설계 및 구현)

  • Choe, Hyun-Kun;Ha, Tai-Hyun
    • Journal of Digital Convergence
    • /
    • v.5 no.2
    • /
    • pp.123-134
    • /
    • 2007
  • The purpose of this study is to design and implementation of project learning site by using XML. The development of the Internet site for project learning was planned as per preparation, development and test/application stages. The research shows that the elements used for the development of the Internet site for project learning are to give learners motivation, specification of learning goals, reminiscence of preceding knowledge, positive participation in teaching activities, learning-guide feedback, evaluation, reinforcement and correction. It is expected that many teachers apply this model to their classes and show realistic results to motivate their students.

  • PDF

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

The Surrey Research Park: A Case Study of Strategic Planning for Economic Development

  • Parry, Malcolm
    • World Technopolis Review
    • /
    • v.1 no.3
    • /
    • pp.206-225
    • /
    • 2012
  • The development of the Surrey Research Park by the University of Surrey is an addition to a number of existing strategies to collaborate with industry that it has developed over its 120 year history. The potential to undertake this development was based on owning a substantial land holding that the University acquired when the Borough Council for the town of Guildford invited the University to relocate from Battersea in London to its new location in 1966. Initial plans for the Park in 1979 were accelerated in 1981 in response to plans by the then government to reduce funding for Higher Education in the UK. Beyond a broad master plan for the site that was based on topography and access to the site the plans that were developed were based on a survey of 100 companies that were deemed to be in the target market for the site and a review of the other 7 science parks that were being developed in the UK in 1981. The findings from this proved to be important in developing the master plan for the site. Another important influence on the project was the objectives that were defined for the 3 stakeholders in the project of the University, the tenant companies and the planning authority relate to economic development, a competitive advantage of tenant companies, knowledge transfer, the profile for the University and the capacity to generate income proved to be a valuable framework on which to develop a master plan. These details were underpinned by five objectives which served the three stakeholders in the site. Those for the University included commercial potential, knowledge transfer and image and reputation; those for the town primarily related to economic development and the plan was to help tenants gain a competitive advantage by locating on the site. In addition a number of success indicators were defined for the project against which to measure performance and have remained as a useful set of parameters on which to base the assessment of the performance of the site. In combination with these indicators a further analysis deals with the success factors that are considered as important in influencing performance. The paper sets details the history of the park and covers the success indicators and factors and reviews these in the context of the original objectives for the site.

A Landscape Design of Mixed Use Development Project by Project Financing in Baebang, Asan (아산배방 복합단지개발 PF사업 조경설계)

  • Roh Hwan-Kee;Choi Jung-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.5 s.112
    • /
    • pp.104-113
    • /
    • 2005
  • This landscape design proposal was presented for a competition for mixed-use development project by project financing in Asan Baebang which was held by the Korea National Housing Corporation in July of 2005. The site is a center of Asan Baebang New Town Development District and has a commercial area of $57,929m^{2}$. Design guidelines and judging criteria of this competition were to build a symbolic center and cultural core for district, to elevate positive image and identity of Asan New Town by attractive place making, to link with separated block in the site and regional context, and to make environmentally sustainable design by creating an attractive waterfront of Jang Jae stream passing through the site. This is the most important condition for the design. Therefore, the authors developed design concept and strategy within the guidelines and this conditions. The schema of the design was introduced by the water in the site. To evolve design concept, we reinterpreted water and context in the site combining with landscape design strategy. So the proposal set the main design concept as 'all that is solid melt into water' as if Marshall Berman said. By doing that, design concept of the proposal evolved as follows: 'extension' of water and greer, 'a joint' of space,'newness' of experience, 'breath' of consensus with each other. The spatial concept of this project was developed by expressing five theme spaces; eco zone, entertainment zone, art zone, culture zone, leisure zone. These theme spaces were consecutively placed along the pedestrian path and to consists of vertical layer in each level and diverse design technique and spatial effects are used.

Development of Construction Site Access Management Automation System based on Hand Vascular Pattern

  • Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.499-505
    • /
    • 2009
  • Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed

  • PDF

A Development for Construction Cost Prediction Model of Site Development Project (단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 -)

  • Lee Won-Yong;Lee Tai-Sik;Park Jong-Hyun;Bae Keon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.419-422
    • /
    • 2002
  • The features of modem construction industry can be summarized as specialization, complexity, and large-scale. Therefore, increasing uncertainty of construction project can not be effectively dealt with traditional method used for construction cost management. Cost overrun affects on successful execution of managing construction project in a negative way. Therefore, accurate estimation is a priori for effective cost management. First, this work analyzes the previous cost estimation model for the effective cost management. Then, a standard structure required for developing the cost estimation model for site development was presented. In addition, the cost estimation model which can be used in planning and design phases was introduced by analyzing real site development projects.

  • PDF