• Title/Summary/Keyword: site condition

Search Result 2,023, Processing Time 0.036 seconds

Developing noise prediction software for Improvement of the construction noise management (공사장 소음 관리 효율화를 위한 소음예측프로그램 개발)

  • An, Jang-Ho;Lee, Jun-Seo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.155-156
    • /
    • 2009
  • Construction companies can easily understand present noise condition of their construction site via C-Noise. C-Noise is noise simulation software that simple to use. Construction companies spend time and cost for public complaints about construction noise. Construction site noise management using noise simulation software like C-Noise can reduce public complaint. achieve cost reduction to treat it.

  • PDF

Seismic Energy Demand of Structures Depending on Characteristics of Earthquakes (지진하중 특성에 따른 구조물의 에너지 요구량)

  • Choi, Hyun-Hoon;Kim, Jin-Koo
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2005.03a
    • /
    • pp.121-128
    • /
    • 2005
  • In this study the influences of ground motion characteristics and structural properties on energy demands were evaluated using 100 earthquake ground motions recorded in different soil conditions, and the results were compared with those of previous works. Results show that ductility ratios and the site conditions have significant influence on input energy. The ratio of hysteretic to input energy is considerably influenced by the ductility ratio and damping ratio, while site condition has minor effects.

  • PDF

Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.109-110
    • /
    • 2015
  • This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

  • PDF

Correlation Analysis about Loop Impedance and Load Condition (루프임피던스와 부하상태의 상관관계 분석)

  • Jung, Jin-Soo;Kim, Han-Sang;Kim, Sun-Gu;Han, Woon-Ki;Park, Chan-Eom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.2
    • /
    • pp.342-346
    • /
    • 2012
  • This paper presents a loop impedance(inner loop impedance & external impedance) measurement method in TN system. When the measurement of a loop impedance then the measurement result have a some error by load condition. In this paper suggest the loop impedance measurement on actual loading condition by two experiment. one was laboratory condition and the other was the actual measurement on site. Analysis result, measuring error by load condition has not effect on measuring loop impedance.

An Analysis of the Effect of Weather Condition with Work Sections in Building Construction (건축공사 공종별 기후요소 영향도 분석)

  • Kim Baek-Joong;Seo Jang-Woo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.141-144
    • /
    • 2006
  • The building construction is an essential field to consider weather condition because construction works are performed in a site. From this reason, this study evaluated the effect of weather condition with work sections in building construction by Analytic Hierarchy Proces (AHP) method. The results of this study as follows : (1) The effect of weather condition with work sections is affected by rainfall in summer season, and by a low temperature in winter season (2) The effect of weather condition with work sections is 0.235 for mold work, 0.210 for concrete work, 0.181 for steel-frame work.

  • PDF

A Study on Dispersion Characteristics of Odor from Hanwoo and Dairy Farms (한우 및 젖소농장 발생 악취의 확산특성 연구)

  • Kim, Doo-Hwan;Ha, Duck-Min;Lee, Jae-Young;Kim, Hee-Ho;Song, Jun-Ik
    • Journal of Animal Environmental Science
    • /
    • v.21 no.1
    • /
    • pp.1-8
    • /
    • 2015
  • This study was conducted to investigate the dispersion prediction of odor from Hanwoo and dairy farms. Gaussian Plume model used in considering of farm size, wind velocity, atmospheric stability and threshold odor unit to prediction of odor dispersion based on the survey on current state of odor emission and control from 9 site of Hanwoo and 9 site of dairy farms. Farm size, wind velocity and atmospheric stability were affected the distance of odor dispersion, showed longer distance in cases of large farm, low wind velocity and stable atmospheric condition. We will suggestion the adjusted distance of odor dispersion according to farm size was estimated to 50~100 m in Hanwoo farm and 50~150 m in dairy farm when apply the 3OU, 5 m/s wind velocity and stable atmospheric condition.

A Case Study for Deformation of Caisson caused by Friction Shortage (케이슨 하부의 마찰저항 부족에 따른 케이슨 안벽 변위발생 사례연구)

  • Shim, Dong-Hyun;Park, Jun-Ho;Lee, Kyung-Sook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.325-336
    • /
    • 2008
  • Deformation of caisson occurred during the backfilling behind the caisson and some caisson moved toward seaside. A series of site investigation were conducted to figure out various circumstances at site and also used to analyze the cause of deformation. The soil condition of backfilling is also investigated because dredged material was used as a backfill material. The friction angle of backfill is supposed to be lower than the estimated one which was used in design stage. To determine the cause of friction shortage, back analysis for sliding safety were carried out with considering the soil condition of backfilling. A remedial plan, re-rising and relocating a caisson with backfilling good earth after treatment of caisson rubble mound to achieve the safety for sliding was proposed as a best solution based on the back analysis results. Reform concrete structure including service gallery and crane rail was also considered with the remedial work to improve the cape line of caisson.

  • PDF

Obliquely incident earthquake for soil-structure interaction in layered half space

  • Zhao, Mi;Gao, Zhidong;Wang, Litao;Du, Xiuli;Huang, Jingqi;Li, Yang
    • Earthquakes and Structures
    • /
    • v.13 no.6
    • /
    • pp.573-588
    • /
    • 2017
  • The earthquake input is required when the soil-structure interaction (SSI) analysis is performed by the direct finite element method. In this paper, the earthquake is considered as the obliquely incident plane body wave arising from the truncated linearly elastic layered half space. An earthquake input method is developed for the time-domain three-dimensional SSI analysis. It consists of a new site response analysis method for free field and the viscous-spring artificial boundary condition for scattered field. The proposed earthquake input method can be implemented in the process of building finite element model of commercial software. It can result in the highly accurate solution by using a relatively small SSI model. The initial condition is considered for the nonlinear SSI analysis. The Daikai subway station is analyzed as an example. The effectiveness of the proposed earthquake input method is verified. The effect of the obliquely incident earthquake is studied.

Assessment of Design Method about Sanitary Sewer Network according to RDII and Established Scenario (RDII발생 및 기존 시나리오에 따른 오수간선 네트워크 설계방법 검토)

  • Kim, Jungryul;Oh, Jeill
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.367-374
    • /
    • 2016
  • In this study, the RDII impact on sewer designing in the upstream monitoring area (A site) was considered. Based on the long-term (1/1/2011~12/31/2011) rainfall and flow data consisting of 10-min interval sampling in the nearby design area (B site), the maximum RDII/DWF ratio was selected. The sewer network system at B site was evaluated by the Manning equation. Scenario 1 considering the hourly maximum flow with respect to the flow velocity showed that none of the sewer pipes satisfied the minimum flow velocity condition (0.6 m/s), and 40 pipes did not achieve half of the velocity condition. In scenario 2 considering I/I, 1 the pipes satisfied 0.6 m/s, and 35 pipes showed 0.3 m/s. Scenario 3 reflected the effect of RDII. Velocities in 26 pipes were less than 0.3 m/s, and 4 pipes satisfied the velocity condition. With respect to the allowance rate, 17 pipes were shown to have more than 99%, and none of the pipes satisfied less than 95% of the allowance rate in scenario 1. In scenario 2, 17 Ed: Per the Table pipes showed more than 99% and one pipe showed less than 95%. In scenario 3, 16 pipes showed more than 99% of the allowance rate, and 19 pipes showed less than 95%. Based on these results, it is predicted that deposition would occur due to the slow flow velocity; however, capacity would not be a problem.