• Title/Summary/Keyword: site assessment guide

Search Result 25, Processing Time 0.027 seconds

A study on the improvement for installation guide of soundproofing facilities in construction site (공사장 방음시설 설치기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

A Study on Development of Pre-Hazards Risk Analysis Guide Tool (연구실 위험분석을 위한 사전유해인자 가이드 Tool 개발 연구)

  • Choi, Byeong Kyu;Rhie, Kwang Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.133-140
    • /
    • 2017
  • The Ministry of Science, ICT and Future Planning made law for Pre-Hazard Risk Analysis in December 31, 2014 to protect researchers from continuing accidents in laboratory. Conducted before an experiment, Pre-Hazard Risk Analysis finds hazards of the experiment and rules to manage the hazards.So the Pre-Hazard Risk Analysis can support laboratory safety system by prevent accidents in laboratory. Pre-Hazards Risk Analysis is newly created system so that executors need Guidelines to perform this analysis properly. This study is to develop guide tool for Pre-Hazard Risk Analysis by analyzing other risk assessment systems; PSM, Off-site Consequence Assessment, laboratory safety system. Also, this study suggested how to establish database for Pre-Hazard Risk Assessment by analyse KRAS.

A Case Study on the Establishment of Assessment Standards for the Site Selection of Waste Treatment Facility (폐기물 처리시설 입지선정 평가기준 설정에 관한 사례연구)

  • Jung, Jong-Gwan;Jang, Won
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.137-152
    • /
    • 1997
  • The siting process of municipal solid waste treatment facility consists of a structured set of policies that guide the implementation of waste management goals. The main problems of siting process are the social and political context or the community opposition. During the past, the traditional siting process has been obsolete in most pans of the country, so public officials and researchers have tried to experiment with new policies and procedures. A number of controversial issues offer insight into the factors that are related to the local residents opposition to new waste treatment facilities. The purpose of this case study focused on the establishment of criteria in the site selection of waste treatment facilities which can carry out resources recovery. incineration and landfill simultaneously. That is to say. the main points are to make concrete the quantification standards of assignment and take an objective allotment scale according to the assessment factors. The summarized results are as follows; 1. To promote the site selection based on the guideline such as rational. objective and due process of law, it is desirable to inform the local residents the methods of assessment in advance. 2. Totally 20 factors for the site selection are divided into 3 categories such as living environment characteristics, technological location characteristics and socio-economic factors. And the supposed magnitude of weight in all items are equally applied. 3. In regard to 20 assessment factors, the allotment of point is distributed by the specific location characteristics. Namely to make the assessment easily, each factors are set the scale from 1 to 5 points en masse along the data which are acquired in the region.

  • PDF

Development of an Accident Consequence Assessment Code for Evaluating Site Suitability of Light- and Heavy-water Reactors Based on the Korean Technical Standards

  • Hwang, Won Tae;Jeong, Hae Sun;Jeong, Hyo Joon;Kil, A Reum;Kim, Eun Han;Han, Moon Hee
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.4
    • /
    • pp.368-372
    • /
    • 2016
  • Background: Methodologies for a series of radiological consequence assessments show a distinctive difference according to the design principles of the original nuclear suppliers and their technical standards to be imposed. This is due to the uncertainties of the accidental source term, radionuclide behavior in the environment, and subsequent radiological dose. Both types of PWR and PHWR are operated in Korea. However, technical standards for evaluating atmospheric dispersion have been enacted based on the U.S. NRC's positions regardless of the reactor types. For this reason, it might cause a controversy between the licensor and licensee of a nuclear power plant. Materials and Methods: It was modelled under the framework of the NRC Regulatory Guide 1.145 for light-water reactors, reflecting the features of heavy-water reactors as specified in the Canadian National Standard and the modelling features in MACCS2, such as atmospheric diffusion coefficient, ground deposition, surface roughness, radioactive plume depletion, and exposure from ground deposition. Results and Discussion: An integrated accident consequence assessment code, ACCESS (Accident Consequence Assessment Code for Evaluating Site Suitability), was developed by taking into account the unique regulatory positions for reactor types under the framework of the current Korean technical standards. Field tracer experiments and hand calculations have been carried out for validation and verification of the models. Conclusion: The modelling approaches of ACCESS and its features are introduced, and its applicative results for a hypothetical accidental scenario are comprehensively discussed. In an applicative study, the predicted results by the light-water reactor assessment model were higher than those by other models in terms of total doses.

Assessment and Improvement of Ocean Physics for Coastal Erosion Projects (연안침식방지사업의 해양물리분야 평가실태 및 개선방안)

  • TAC, Daeho;OH, Hyuntaik
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.4
    • /
    • pp.947-956
    • /
    • 2016
  • This study analysed the documents of Sea Area Utilization Consultation of JongChun and ApHae located in West Coast of Korea and NaJeong located in East Coast of Korea in order to find out problems of site surveys and numerical simulations for coastal erosion projects of ocean physics, and suggested the improvement way to go. Current especially like wave-induced current is the one of the important external forces to handle coastal erosion but underestimated in the west coast. In case of east coast the various tests including wave-induced current were conducted but less efficient to find out the reasons of coastal erosion. The stiffness structure to protect coastal line like beach made the secondary erosion by using them without sufficient analysis for the erosion. In order to consult a Sea Area Utilization Consultation those are needed to review the scenarios for external forces such as wave and tidal currents, the site surveys for external forces, the net sediment analysis for years, the long periods of monitoring, and the guide line and revision of the rule for coastal erosion.

A Study on Site Selection for Marine Recreational Floating Architecture (해양레저용 플로팅 건축물 입지선정에 관한 연구)

  • Lee, Han-Seok;Cho, Hyung-Jang;Kang, Young-Hun
    • Journal of Navigation and Port Research
    • /
    • v.36 no.1
    • /
    • pp.27-34
    • /
    • 2012
  • The systematic criteria and rational standard for site selection of marine recreational floating architecture are in urgently need in respect of structural safety, use of facilities, economics of construction and management, relationship with surrounding areas or cities and impact on marine environment. Nevertheless, at present, there is not any study nor guideline for site selection of marine recreational floating architecture which is now being planned and elected at many places of a body of water such as river or coastal area all over the country. Therefore this study is to propose a systematic process and a rational criteria and guideline for site selection of marine recreational floating architecture. Especially the results are suggested in forms of diagrams and tables in order to be utilized so easily by related local governments and individual enterprises.

A Study on the Improvement of Assessment Criteria through Green Building Certification Cases for Apartment Houses (공동주택 친환경건축물인증 사례를 통한 평가항목 개선안 연구)

  • Kim, Myoung-Shin;Hwang, Jae-Woo;Park, Kyung-Soon;Son, Won-Tug
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.563-568
    • /
    • 2008
  • The Green Building Certification is issued through self-assessment of applicant, assessment of assessment members and deliberation committee members. These assessments are carried out based on a standard provided Ministry of land transport and maritime affairs and environment. However, opinion difference of assessment standards could be occurred due to diversity of understanding for a standard or subjectivity of committee member. In this paper, We discussed the primary cause of score difference after analyzed assessment standard for the site, transportation, energy and resources, ecological environment, indoor environment in five different Apartment Houses located in Seoul. At a result, score difference was at least 3 points in each section except indoor environment and total score difference of housing complex is by 10 points. To improve these problems, educational program should be activated and guide for assessment standard should be published.

  • PDF

A Study on the Improvement of Green Building Certification Information System (친환경건축물 인증제도 활성화를 위한 정보시스템 개선 연구)

  • Ryu, Soo-Hoon
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.3
    • /
    • pp.5-16
    • /
    • 2011
  • This study aims for improvement and rebuilding of the 'Green Building Certification Criteria Information System;GBCCIS'. To achieve this, improved information system has developed self-assessment program available on the web and to provide data about the target of Green Building Certification based on the 2010 revised criteria. The target building of Green Building Certification is Apartment, Office, Mixed-Use Building, School, property for sale, accommodation, and other facilities. Also, the information system about the Green building related technologies and techniques to take advantage of offer a variety of information was built. Green Building Certification Criteria web-site Established in this study has information and each menu and contents are linked to organic and high-utilization. Each menu is organized according to the used frequency and the group. Also this web-site is composed of information guide field, core service field, and other field. These improvement of Green Building Certification Criteria Information System can be a positive incentive measures for the activation of Green Building Certification Criteria easily by taking advantage of relevant information by users. And these will be possible to planning development of Green building technologies by introducing the latest Green building construction techniques applicable building. Also, to assess in advance by using self-assessment program in the design phase of building will lead to Green building design and provide the convenience of the application process and through database construction and share information of building assessment resources certified Green Building Certification Criteria will lead to the containment and fair assessment between cation authorities.

A STUDY ON METHODOLOGY FOR IDENTIFYING CORRELATIONS BETWEEN LERF AND EARLY FATALITY

  • Kang, Kyungmin;Jae, Moosung;Ahn, Kwang-Il
    • Nuclear Engineering and Technology
    • /
    • v.44 no.7
    • /
    • pp.745-754
    • /
    • 2012
  • The correlations between Large Early Release Frequency (LERF) and Early Fatality need to be investigated for risk-informed application and regulation. In Regulatory Guide (RG) -1.174, while there are decision-making criteria using the measures of Core Damage Frequency (CDF) and LERF, there are no specific criteria on LERF. Since there are both huge uncertainties and large costs needed in off-site consequence calculation, a LERF assessment methodology needs to be developed, and its correlation factor needs to be identified, for risk-informed decision-making. A new method for estimating off-site consequence has been presented and performed for assessing health effects caused by radioisotopes released from severe accidents of nuclear power plants in this study. The MACCS2 code is used for validating the source term quantitatively regarding health effects, depending on the release characteristics of radioisotopes during severe accidents. This study developed a method for identifying correlations between LERF and Early Fatality and validates the results of the model using the MACCS2 code. The results of this study may contribute to defining LERF and finding a measure for risk-informed regulations and risk-informed decision-making.

ESTIMATION OF OFF-SITE DOSE AND RELEASE CONCENTRATION OF RADIOACTIVE LIQUID EFFLUENTS FROM RADWASTE TREATMENT SYSTEM IN KORI 3&4

  • Kim, H.S.;Son, J.K.;Kim, K.D.;Ha, J.H.;Song, M.J.
    • Journal of Radiation Protection and Research
    • /
    • v.26 no.3
    • /
    • pp.291-298
    • /
    • 2001
  • The designed release rate of liquid effluents from radwaste treatment system should be calculated and evaluated during normal operation, including anticipated operational occurrence and be assured that the release concentration and off-site dose at unrestricted area do not exceed the limits of regulation. The expected annual release rate and off-site dose for the currently operating nuclear power plants in Korea had been calculated and evaluated using PWR-GALE and LADTAP-II which was based on USNRC Regulatory Guide 1.109. Recently, the MOST Notice 2001-2 related to release concentration and off-site dose at unrestricted area was revised to reflect the concept of ICRP-60. It is necessary for KORI 3&4 to re-calculate the release concentration and off-site dose and to compare these results with the limits of regulation. As the results of assessment, we confirmed that the release concentrations were less than its limits of MOST Notice 2001-2 and the off-site dose at unrestricted area using K-DOSE60 was 3.61E-03 mSv/yr to the age of five for the effective dose, and 4.10E-2 mSv/yr to thyroid of the age of five for the organ equivalent dose. We also confirmed the off-site dose was within the limits of MOST Notice 2001-2. Therefore, the release concentration and off-site dose re-evaluated at unrestricted area in KORI 3&4 were well below the regulation limits of MOST Notice 2001-2.

  • PDF