• 제목/요약/키워드: shotcrete tunnel lining

Search Result 103, Processing Time 0.021 seconds

터널 숏크리트 라이닝의 장기 내구성 저하 평가를 위한 수치모델의 개발 (Development of a Numerical Model for Evaluation of Long-Term Mechanical Degradation of Shotcrete Lining in Tunnels)

  • 신휴성;임종진;김동규;이규필;배규진
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.251-258
    • /
    • 2005
  • In this study, a new concept for simulating a long-term mechanical degradation mechanism of shotcrete in tunnels has been proposed. In fact, it is known that the degradation takes place mainly by internal cracks and reduced stiffness, which results mainly from volume expansion of shotcrete and corrosion of cement materials, respectively. This degradation mechanism of shotcrete in tunnels appears similar to those of the most kinds of chemical reactions in tunnels. Therefore, the mechanical degradation induced by a kinds of chemical reaction was generalized and mathematically formulated in the framework of thermodynamics. The numerical model was implemented to a 3D finite element code, which can be used to simulate behaviour of shotcrete structures undergoing external forces as well as chemical degradation in time. A number of illustrative examples were given to show the feasibility of the model in tunnel designs with consideration of long-term degradation effect of shotcrete quantitatively for increase of long-term safety of tunnels.

  • PDF

터널 지보구조 진단을 위한 초음파 반사법을 이용한 3차원 모형실험 연구 (Study on 3-D Physical Modeling for the Inspection of Tunnel Lining Structure by using Ultrasonic Reflection Method)

  • 김중열;김유성;신용석;현혜자
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.221-228
    • /
    • 2002
  • Thickness of concrete lining, voids at the back of lining or shotcrete are very important elements for inspecting the safety of tunnels. Therefore, the inspection of tunnel lining structure means to investigate the inner layer boundaries of the structure. For this purpose, seismic reflection survey is the most desirable method if it works in good conditions. However, the conventional seismic reflection method can not be properly used for investigating thin layers in the lining structure. In other words, to detect the inner boundaries, it is desirable for the wavelength of source to be less than the thickness of each layer and for the receiver to be capable of detecting high frequency(ultrasonic) signals. To this end, new appropriate source and receiver devices should be developed above all for the ultrasonic reflection survey. This paper deals primarily with the development of source and receiver devices which are essential parts of field measuring system. Interests are above all centered in both the radiation pattern, energy, frequency content of the source and the directional sensitivity of the receiver. With these newly devised ones, ultrasonic physical modeling has been performed on 3-D physical model composed of bakelite, water-proof and concrete, The measured seismograms showed a clear separation of wave arrivals reflected from each layer boundary. Furthermore, it is noteworthy that reflection events from the bottom of concrete below water-proof could be also observed. This result demonstrates the usefulness of the both devices that can be applied to benefit the ultrasonic reflection survey. Future research is being focus on dealing with at first an optimal configuration of source and receiver devices well coupled to tunnel wall, and further an efficient data control system of practical use.

  • PDF

지반과 숏크리트 라이닝의 인터페이스 특성에 관한 실험적 연구 (Experiments on Interfacial Properties Between Ground and Shotcrete Lining)

  • 장수호;이석원;배규진;최순욱;박해균;김재권
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.407-414
    • /
    • 2004
  • Interfacial properties between rock mass and shotcrete play a significant role in the transmission of loads from the ground to shotcrete. These properties have a major effect on the behaviours of rock mass and shotcrete. They, however, have merely been assumed in most of numerical analyses, and little care has been taken in identifying them. This paper aimed to identify interfacial properties including cohesion, tension, friction angle, shear stiffness, and normal stiffness, through direct shear tests as well as interface normal compression tests for shotcrete/rock cores obtained from a tunnel sidewall. Mechanical properties such as compression strength and elastic modulus were also measured to compare them with the time-dependent variation of interfacial properties. Based on experiments, interfacial properties between rock and shotcrete showed a significant time-dependent variation similar to those of its mechanical properties. In addition, the time-dependent behaviours of interfacial properties can be well regressed through exponential and logarithmic functions of time.

  • PDF

구조용 합성섬유보강 숏크리트의 성능평가에 관한 실험연구 (An Experimental Study on the Performance Evaluation of Structural Synthetic Fiber-Reinforced Shotcrete)

  • 오병환;최승원;박대균;한일영;김방래;신용석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.373-378
    • /
    • 2003
  • The cement-based composites have relatively low tensile strength and toughness. The fiber addition is one of the most important ways of increasing the toughness of concrete. The steel fibers have been used conventionally in the shotcrete of tunnel lining. Recently, the structural synthetic fibers were developed and used frequently in some actual tunnel shotcreting in foreign countries. Now types of synthetic fibers have been developed in this study. The purpose of this study is to explore the strength and toughness characteristic of the concrete reinforced with synthetic fibers developed in this study. The result were compared with those of steel fiber reinforced concrete. It is seen that the performance of synthetic fiber reinforced concrete is good as much as that of steel fiber reinforced concrete, while the synthetic fibers have advantages in corrsion resistance and economy.

  • PDF

The tunnel model tests of material development in different surrounding rock grades and the force laws in whole excavation-support processes

  • Jian Zhou;Zhi Ding;Jinkun Huang;Xinan Yang;Mingjie Ma
    • Geomechanics and Engineering
    • /
    • 제36권1호
    • /
    • pp.51-69
    • /
    • 2024
  • Currently, composite lining mountain tunnels in China are generally classified based on the [BQ] method for the surrounding rock grade. Increasingly, tunnel field construction is replicated indoors for scale down model tests. However, the development of analogous materials for model tests of composite lining tunnels with different surrounding rock grades is still unclear. In this study, typical Class III and V surrounding rock analogous materials and corresponding composite lining support materials were developed. The whole processes of excavation-support dynamics of the mountain tunnels were simulated. Data on the variation of deformations, contact pressures and strains on the surrounding rock were obtained. Finally, a comparative analysis between model tests and numerical simulations was performed to verify the rationality of analogous material development. The following useful conclusions were obtained by analyzing the data from the tests. The main analogous materials of Class III surrounding rock are barite powder, high-strength gypsum and quartz sand with fly ash, quartz sand, anhydrous ethanol and rosin for Class V surrounding rock. Analogous materials for rockbolts, steel arches are replaced by aluminum bar and iron bar respectively with both shotcrete and secondary lining corresponding to gypsum and water. In addition, load release rate of Class V surrounding rock should be less than Class III surrounding rock. The fenestration level had large influence on the load sharing ratio of the secondary lining, with a difference of more than 30%, while the influence of the support time was smaller. The Sharing ratios of secondary lining in Class III surrounding rock do not exceed 12%, while those of Class V surrounding rock exceed 40%. The overall difference between the results of model tests and numerical simulations is small, which verifies the feasibility of similar material development in this study.

수치해석을 이용한 터널 부재의 열화로 인한 장기 거동 예측 (Numerical Approach to Predict the Long Term Behavior of Tunnel Considering the Degradation of Tunnel Members)

  • 반호기;김동규
    • 한국지반환경공학회 논문집
    • /
    • 제23권12호
    • /
    • pp.33-39
    • /
    • 2022
  • 본 논문은 터널을 구성하고 있는 구성요소(지보재, 주변지반)들의 열화로 인한 터널의 장기거동을 수치해석을 이용하여 예측/분석하였다. 터널의 구성요소들은 시간이 지남에 따라 열화를 겪게 된다. 이러한 열화로 인해 터널의 장기적인 안정성을 예측하는 것은 매우 중요한 이슈이다. 따라서 본 연구에서는 열화를 예측하는 모델을 제시하였으며, 이 모델은 두 개의 파라미터로 구성되어 있다. 그 중 하나는 부재 및 주변지반의 열화로 인해 남아있는 잔류강도를 나타내며, 나머지 하나는 열화되는 모양을 표시한다. 제안한 열화 모델을 이용하여 수치해석을 수행하여 터널의 장기거동을 예측하였다. 그 결과 열화로 인해 터널 주변 지반의 이완응력이 증가하여 터널의 장기적인 안정성에 영향을 미치고 있음을 알 수 있었다.

응력-간극수압 3차원 연계해석을 이용한 터널시공과 지하수의 상호작용으로 인한 라이닝 거동특성 연구 (Performance of Shotcrete Lining due to Tunneling and Groundwater Interaction Using a 3D Stress-pore Pressure Coupled Analysis)

  • 유충식;김선빈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.465-474
    • /
    • 2005
  • This paper presents the interaction effect between tunneling and groundwater on tunnel behavior. A parametric study is then conducted on the various tunneling situations frequently encountered in Seoul area using a 3D stress-pore pressure coupled finite-element model with emphasis on the effects of ground and lining permeabilities. It is shown that the ground and lining responses are significantly influenced by the relative permeability between the ground and the lining, and that the circumferential pre-grouting is effective in minimizing the tunnelling and groundwater interaction.

  • PDF

Effect of construction sequence on three-arch tunnel behavior-Numerical investigation

  • Yoo, C.;Choi, J.
    • Geomechanics and Engineering
    • /
    • 제15권3호
    • /
    • pp.911-917
    • /
    • 2018
  • This paper concerns a numerical investigation on the effect of construction sequence on three-arch (3-Arch) tunnel behavior. A three-arch tunnel section adopted in a railway tunnel construction site was considered in this study. A calibrated 3D finite element model was used to conduct a parametric study on a variety of construction scenarios. The results of analyses were examined in terms of tunnel and ground surface settlements, shotcrete lining stresses, loads and stresses developed in center column in relation to the tunnel construction sequence. In particular, the effect of the side tunnel construction sequence on the structural performance of the center structure was fully examined. The results indicated that the load, thus stress, in the center structure can be smaller when excavating two side tunnels from opposite direction than excavating in the same direction. Also revealed was that no face lagging distance between the two side tunnels impose less ground load to the center structure. Fundamental governing mechanism of three-arch tunnel behavior is also discussed based on the results.

2-Arch 터널의 최적 설계에 관한 연구 (Investigation on Optimum Design of 2-Arch Tunnel)

  • 유충식;김선빈;김주미
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1518-1525
    • /
    • 2008
  • This paper concerns optimum design of 2-Arch tunnel. A 2-Arch tunnel adopted in a subway tunnel construction site is considered in this study. A calibrated 3D finite element model was adopted to conduct a parametric study on the lagged distance between left and right tunnel faces. The results of analysis were examined to determine optimum lagged distance for minimizing the interaction between the left and right tunnels. The results indicated that the shotcrete lining stress and the center pillar load are more influenced by the second tunnel excavation than the tunnel deformation. Also shown is that a lagged distance of 20m is sufficient to minimize the interaction between two tunnels. Fundamental mechanism of 2-arch tunnel was also investigated based on the results.

  • PDF

도심지 지하철 터널의 지반보강공법 시공사례 연구 (A Case Study on the Reinforcement Method of Subway Tunnel)

  • 천병식;여유현;최현석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.201-208
    • /
    • 1999
  • The NATM(New Austrian Tunnelling Method) has been used for tunnelling since 1980's. But Collapses of tunnel under construction take place frequently, especially at urban areas because of adjacent buildings, underground conduits and traffic loads. This paper is a case study on the reinforcement method of subway tunnel at urban areas. In this study, ground inspection, geological investigation, laboratory test and numerical analysis by means of FDM program were carried out. The tunnel excavation was stopped because of over excessive brake of tunnel crown and shotcrete was installed to prevent deformation of adjacent ground as the temporary method. From the result of field survey and geological investigation, it is found that the soft weathered soil was distributed to the ground of tunnel invert unlike original investigation. The results of the analysis and the study show that the SGR(Space Grouting Rocket) method and Umbrella method can be applied for the stability of tunnel excavation and in addition the reinforcement of concrete lining is required for long-term stability of tunnel.

  • PDF