• 제목/요약/키워드: shotcrete lining

검색결과 108건 처리시간 0.025초

시공중 터널 숏크리트 라이닝 작용응력 측정기법 개발을 위한 수치해석적 연구 (Numerical Study for Tunnel Shotcrete Lining Operated Stress Measurement Techique Development During a Construction)

  • 신휴성;김동규;정용수;황재홍;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.754-761
    • /
    • 2008
  • In general, stress measurement of existent shotcrete lining be used by pressure cells. but, measuring instrument is lost by high pressure at shotcrete lining construction and pressure cell's measurement value have to low believability by natural conditions like curing temperature. In this study, proposed techniques to measure without utilizing sensitive stress sensor in natural condition at point that want stress of shotcrete lining after shotcrete lining construction. Executed numerical analysis to forecast stress level that interact in tunnel shotcrete lining, measured strain of hole by load action through hole in shotcrete lining. 3D FEM(finite element method) is enforced through various parameters curing time of shotcrete lining, thickness, load condition. Different model cases applied by parametic study. As analysis result, it could grasp development possibility of method that propose this time because it could examine corelation with strain by near hole of shotcrete lining and stress about load condition.

  • PDF

인공균열 주위의 변형과 터널 숏크리트 라이닝 응력간의 상관관계에 대한 수치해석적 검토 (Numerical approach on relationship between deformation of artificial crack and stress acting on tunnel shotcrete lining)

  • 신휴성;권영철;배규진;김경신;김홍택
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.64-71
    • /
    • 2009
  • The stresses acting on shotcrete lining of tunnel have been measured virtually by monitoring instruments installed during construction. However, the malfunction of instrument and the lack of consistency of signal have always been controversial, but re-installation of instrument after construction of tunnel lining is practically impossible. Therefore, authors have carried out the study to develop a new technique for estimating the stress acting on shotcrete lining during and after construction. In the technique, stresses of shotcrete lining can be estimate by the measurement of deformation of free face. Therefore, the relationships between the stresses of shotcrete lining and deformation of free surface are indispensable factor. In this paper, the parametric study using 2D FEM analysis was carried out to estimate the relationships between the stress level acting on the tunnel shotcrete lining and the deformation near the free face (e.g. artificial crack in this study). The distribution of stresses of shotcrete lining is also investigated in this study as the preliminary investigation for the large-scale tunnel lining test and detailed 3D FEM analysis.

  • PDF

터널에서의 숏크리트 응력 측정 사례 연구 (Case Studies for the Stress Measurements on the Shotcrete Tunnel Lining)

  • 김학준;김미란
    • 지질공학
    • /
    • 제24권1호
    • /
    • pp.81-89
    • /
    • 2014
  • 국내 터널현장에서는 일차 지보재의 안정성 및 이차라이닝의 두께와 시공 시기 등을 결정하기 위하여 숏크리트에서 응력 측정을 수행하고 있다. 본 연구에서는 국내 여러 지역의 터널 현장에서 수행된 숏크리트 응력 측정 사례의 분석을 통하여 숏크리트 계측 현황 및 숏크리트 안정성 평가 기준의 문제점을 제시하였다. 또한 개선된 숏크리트 응력 계측 방법을 시공 중인 터널현장에 적용한 사례를 제시하였다. 현재와 같이 숏크리트의 안정성 평가를 측정응력의 절대적 크기를 통하여 수행하기 위해서는 숏크리트 응력 측정의 신뢰성 향상이 필요하다.

수치해석에 의한 터널 복공의 역학적 거동 및 균열 특성에 관한 연구 (On Mechanical Behavior and Cracking Characteristics of Tunnel Lining by Numerical Analysis)

  • 이대혁;김재순;이희근;김성운
    • 터널과지하공간
    • /
    • 제8권2호
    • /
    • pp.146-156
    • /
    • 1998
  • Nemerical algorithms were developed to analyze the behavior of the double lining as well as ground mass separately or simultaneously. A lining interface element was especially developed, verified and applied to the study on the coupled interaction of shotcrete and the concrete lining. It could be known fro parameter studys on double lining support systems that as the contact surface between shotcrete and concrete lining was rougher, the more decreased bearing capacity against the cracking of the system. If the thickness of the shotcrete increased, the bearing capacity of the double lining also increased linearly with the thickness. If the thickness of the concrete lining increased, the bearing capacity of the double lining had the relationship of the characteristic S-shape of a sigmoid function with the thickness. When the thickness increased over a given value, it was not useful to increase more the thickness because bearing capacity had no remarkable change. It could be concluded that the behavior of the shotcrete and concrete lining was generally reversed before and after the ratio of horizontal to vertical earth preassure of 1.0 and 0.5 respectively. Therefore, we could guess that the movement which two shotcrete and concrete lining deflect toward each other around the crown caused a friction between two linings and thus this disadvantageous effect could contribute to reducing the bearing capacity against the cracking.

  • PDF

Permanent Shotcrete Tunnel Lining 구축을 위한 고성능 숏크리트 개발( I : 고강도 숏크리트 개발을 위한 새로운 급결제 적용) (Development of High Performance Shotcrete for Permanent Shotcrete Tunnel Lining(I : Application of New Type Accelerator for High Strength Shotcrete))

  • 박해균;이명섭;김재권;안병제
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.1023-1030
    • /
    • 2002
  • From the early 1980s, the New Austrian Tunnelling Method (NATM) has been developed as a one of the standard tunneling method in Korea. Approximately 10 years ago, wet-mix shotcrete with sodium silicate accelerator (waterglass) was introduced and widely used to tunnel lining and underground support. However, this accelerator had some disadvantages due to the decrease of long-term strength compared to plain concrete (without accelerator) and low quality of the hardened shotcrete. In order to compensate for these disadvantages, recently developed alkali-free accelerator has been successfully demonstrated in numerous projects and applications as a new material to make tunnels more durable and safer. An experimental investigation was carried out in order to verify the strength behavior of wet-mix Steel Fiber Reinforced Shotcrete (SFRS) with alkali-free accelerator. Compressive strength, flexural strength and equivalent flexural strength were measured by testing specimens extracted from the shotcrete panels. From the results, wet-mix SFRS with alkali-free accelerator exhibited excellent strength improvement compared to the conventional shotcrete accelerator.

  • PDF

터널 숏크리트 라이닝의 장기 내구성 평가를 위한 실험기법 개발 (Development of experiment technology for assessment of shotcrete lining long-term degradation in tunnels)

  • 임종진;신휴성;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.439-444
    • /
    • 2005
  • Shotcrete lining is likely to be deteriorated due to the ground water which the lining is exposed to. Some tunnel collapses seemed to be affected by shotcrete degradation were reported. But there isn't any assessment method of shotcret long-term degradation. So, Experimental technology for shotcrete long-term degradation modeling was developed in this study. The shotcrete long-term degradation modeling, developed in other study in Korea Institute of Construction Technology, require the time-history of volume change. Digital strain observation system was used to acquire the time-history of volume change. To verify the Strain Observation Digital System, the measurement using the system was compared to the one using a micrometer. Through this process, The experiment for shotcrete long-term degradation modeling was set up.

  • PDF

영구지보재로서 고성능 숏크리트의 적정 배합비 도출 (Mix Proportions of High Performance Shotcrete for Permanent Support)

  • 원종필;김황희;김정훈;박경훈;장창일;이상우
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계 학술발표회 논문집(II)
    • /
    • pp.41-44
    • /
    • 2006
  • Recently, single shell lining method of construction is studied by economical method of construction to make use of high-performance shotcrete of permanent shotcrete lining concept in the UStA, Europe, Japan etc. High-performance shotcrete use is essential as permanent support that single shell lining method of construction has two functions of lining and support to shotcrete. In this research, optimum accelerator amount was decided after setting time test using alkai-free and cement mineral accelerator. Also replacement ratio of silica fume and fly-ash was determined.

  • PDF

고성능 숏크리트 라이닝의 설계 및 시공기술 분석 (Recent Issues in the Design and Construction of High-Performance Shotcrete Lining)

  • 배규진;이석원;박해균;이명섭;김재권;장수호
    • 터널과지하공간
    • /
    • 제14권1호
    • /
    • pp.1-15
    • /
    • 2004
  • 숏크리트와 록볼트를 영구 지보재로 사용하는 싱글쉘 터널공법을 도입하고 터널의 장기 내구성을 향상시키기 위해서는 고성능 숏크리트의 개발이 필수적이다. 따라서 본 논문에서는 숏크리트의 고성능화를 위한 최신 숏크리트 혼화재료를 소개하였고, 국외에서 적용되고 있는 숏크리트의 제반 설계기준과 품질관리 시험방법들을 정리하였다. 특히 현장에서 숏크리트의 압축강도를 쉽고 빠르게 추정할 수 있는 공기압식 pin 관입시험의 적용사례를 소개하였다. 또한 숏크리트 라이닝과 지반의 상호작용을 보다 정확하게 평가할 수 있도록 숏크리트 라이닝의 시간 의존적인 경화특성을 고려한 이론적 해석과 숏크리트 라이닝의 설계변수들에 대한 민감도 분석 결과를 고찰하였다. 마지막으로 고성능 숏크리트 라이닝을 영구지보재로 사용하는 대표적인 싱글쉘 터널공법들에 대한 사례들을 제시하였다.

균질지반에서 2단계로 굴착되는 터널의 거동특성에 대한 실험적 연구 (An Experimental Study on the Behaviour of Tunnel Excavated in a Homogeneous Ground by Two-Stage Excavation)

  • 김동갑;박승준;이상덕
    • 터널과지하공간
    • /
    • 제14권5호
    • /
    • pp.345-352
    • /
    • 2004
  • 숏크리트 지보 구조는 지반과 숏크리트가 일체화되어 숏크리트 라이닝에 전단력의 전달이 가능한 터널구조로서 안정한 구조물을 형성하는데 기여한다. 본 연구에서는 석고를 사용하여 일정한 강도를 가진 균질한 모형지반을 제작하였다. 하중재하에 의해 일정한 원지반 응력을 조성한 후 상$.$하부반단면 굴착공법으로 굴착하며 굴착시 터널 주변지반의 응력상태와 라이닝의 거동특성을 계측하였다. 측정결과 굴착으로 인하여 터널 주변지반과 라이닝에 접선방향으로 인장응력이 발생되었다. 단계굴착에 의한 응력 해방율은 상부 경계선 확대천공시 9%, 상부반단면 아치부 확대천공시 15%, 상부반단면 경계선 절단 즉시 48%, 안정화 후 하부반단면 굴착전 94%로 나타났다.

측벽부 숏크리트 보강에 의한 재래식 도로터널 단면확대 (Reinforcement of Shotcrete Lining on the Side Wall of Tunnel in Enlargement of Existing ASSM Road Tunnel)

  • 김동규;신영완
    • 한국지반환경공학회 논문집
    • /
    • 제13권12호
    • /
    • pp.81-89
    • /
    • 2012
  • 도심지 내에서 교통량 증가로 인하여 차선확대가 요구되는 경우, 기존 터널은 증가된 차선만큼 단면을 확대할 필요가 있다. 터널 단면확대 공사로 발생되는 터널주변의 교통정체를 해소하기 위하여 터널 내에 직사각형 단면의 프로텍터를 설치하여 프로텍터 내부로 교통흐름을 유지하기도 한다. 프로텍터를 사용하면 터널 측벽 하부에서 프로텍터와 굴착 면 사이의 공간이 협소하여 록볼트 시공이 불가능할 수도 있다. 본 연구에서는 터널 측벽 하부의 협소한 공간에서 록볼트를 시공하지 않고 숏크리트 두께를 증가시켜 터널의 안정성을 확보하는 방법을 제안하였다. 기존 2차선 재래식 터널을 3차선 및 4차선 NATM터널로 확대 시공할 경우에 대하여 수치해석을 수행하였다. 터널 측벽 하부에 록볼트를 시공한 경우, 록볼트를 시공하지 않은 경우 및 록볼트를 시공하지 않고 숏크리트 두께만 증가시킨 경우에 대하여 터널의 천단변위, 내공변위 및 숏크리트에 발생한 응력을 비교분석하였다. 천단변위 및 상반 내공변위는 차이가 거의 없었으며, 하반 내공변위는 터널 측벽 하부에 록볼트를 시공하지 않은 경우가 록볼트를 시공한 경우보다 최대 1.3mm 크게 발생하였다. 또한 숏크리트에 발생한 휨압축응력은 터널 측벽 하부에 록볼트를 시공하지 않은 경우가 록볼트를 시공한 경우보다 최대 1.3MPa 크게 발생하였다. 록볼트 미시공에 의해 추가 발생된 숏트리트 응력을 감소시키기 위하여 기존 숏트리크 두께의 20%(250mm ${\rightarrow}$ 300mm, 4차선 터널)및 25%(200mm ${\rightarrow}$ 250mm, 3차선 터널)를 추가 시공하면 록볼트를 시공할 경우와 비슷한 응력수준을 나타내는 것으로 분석되었다.