• Title/Summary/Keyword: shortening of construction period

Search Result 87, Processing Time 0.026 seconds

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.

Time Reduction Effect Analysis of SMART Frame for Long Span and Heavy Loaded Logistics Buildings (SMART 프레임의 공기단축 효과 분석 - 대형 물류창고 사례 -)

  • Kim, Doyeong;Ji, Woomin;Lim, Jeeyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.519-530
    • /
    • 2022
  • As online commerce increases, the construction of large logistics buildings worldwide is exploding. Most of these buildings have the characteristics of long span and heavy loaded and use precast concrete components, a pin joint structure, for rapid construction. However, due to construction safety and structural stability requirements, the pin joint structure has many limitations in terms of the erection of the PC member, which increases the time and cost. A structural frame connected with steel joints between precast concrete components, called a SMART frame, has been developed, which addresses these constraints and risks. However, the effect of the appllication of a SMART frame on the time aspect has not been analysed. The study is a time reduction effect analysis of a SMART frame for long span and heavy loaded logistics buildings. For this study, the authors select a case site erected using existing PC components, and compare the time reduction with the SMART frame erection simulations. Through this analysis, it was found that a time reduciton about 4 months, approximately 48% of the conventional PC installation period could be achieved. If the SMART frame is applied when carrying out future large-scale logistics building projects, it can be expected to have the effect of significantly shortening the construction period compared to the conventional method.

A Study on the Factors Affecting the Performance of Interior Projects : Focusing on the Priority Recognition of Communication Quality Factors (인테리어 프로젝트 성과에 영향을 미치는 요인에 관한 연구 : 커뮤니케이션 품질요소에 대한 우선순위 인식)

  • Sung, Nanhee;Lee, Taewon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.156-166
    • /
    • 2020
  • In this study, through an AHP (Analytic Hierarchy Process) analysis, the internal construction project was designed to analyze the factors affecting the performance of the project and provide suggestions on the quality of communication. To carry out this study, a selection factor was selected by referring to AHP theory and existing prior research. AHP technique was used to collect weights after analysis, examine and analyze gaps. In the interior construction project, the most important factor among the factors influencing the quality of communication to the project performance was communication interaction. Among the sub-factors, accuracy of exchange of information and timeliness of communication were shown in the order of importance. Looking at the results of comprehensive analysis of the first and second layers, the accuracy of information exchange among the elements of communication quality was found to be the number 1 in weight. The timeliness of communication, which is ranked second, and communication that takes place at an appropriate time can lead to efficiency in shortening the project execution period by eliminating unnecessary work. And, Among the factors that affect communication quality, it was analyzed that communication method is not an important factor when compared to other factors. This study shows that quality of communication influences the performance of interior construction projects and provides suggestions for improving communication quality. And it has been confirmed that managing communication quality can act as an important issue that can improve business performance in project execution and production of results.

Computer Simulation for Working Condition of Undergroundwork Using TOP DOWN Technique (TOP DOWN 지하공사의 작업환경체크 컴퓨터시물레이션에 관한 기초적 연구)

  • 고성석;손기상;심경수
    • Journal of the Korean Society of Safety
    • /
    • v.10 no.3
    • /
    • pp.96-105
    • /
    • 1995
  • The better industry develops, the more spaces need but in the limited area. Most building become larger and more complicated if the more spaces need in the constant area. And this leads to do underground work in long period generally six(6) months for 6 basement stories due to the selection of TOP DOWN technique. Working environment in this underground area can be problems and should not be overlooked, because air quality in underground spaces become quickly worse. Recently, department name to control construction safety has been changed to ENVIRONMENT & SAFETY TEAM from SAFETY TEAM. This means that it is very important to control against environmental condition at site so much. Overall construction work as well as underground work should conform to the requirement of working environment, particularly against inhabitants around the construction area. Strut protection, one of earth protection method, in case to 40m long strut may become weaker due to thermal stress or its longitudinally compressive strain and the another one, earth anchor protection may not be applied to the site In case of encroaching on vertical underground borderline because of regulation to prohibit it. It is necessary that TOP DOWN technique should be introduced in order to solve the external and internal problem of the site such as difficulty level of the work, potential danger with excavating depth, and shortening workperiod. It is needed that improving way of working condition should be shown and simplified computer simulation program should be also provided for checking pollution level & ventilation, excluding of lighting problem here. Results measured with conformance to the Regulation for Working Environment Measurement, enforced by Ministry of Labor have been applied to the computer program developed here. Sample air taken at unit workplace which was considered as exposing condition of pollutant at breathing point and within a range of behavior of the workers, Identified exposing group in underground work, using Moded Flow Life Finally, three types of ventilation system, type I with blower & ventilator, type II natural supply with mechanical ventilation system, and type I mechanical ventilation with Drivent Fan Unit System are selected for this study.

  • PDF

A Study on Environmental Impact Assessment System of Seoul City (서울시 환경영향평가 제도에 대한 연구)

  • Kim, Im-Soon;Han, Sang-Wook
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.467-483
    • /
    • 2007
  • Environmental Impact Assessment (EIA) is a kind of planning technique to seek ways to minimize environmental impact, a scheme to encourage sustainable development. With the launch of the Ministry of Environment in 1980, the EIA was introduced in Korea. Its full operation was initially driven by regulations on documenting EIA reports in 1981, which was piloted as a decision-making scheme where final decision were made at the development department after considering opinions suggested by the Ministry of Environment. At that time, dominance of the economic logic overwhelmed environ-friendly opinions, but thanks to the fourth revision of the Environmental Conservation Law in 1986, private projects came to be included on the EIA list. This was a turning point for the EIA to become a regulatory system. Local governments are also conducting the EIA regardless of the national-level EIA. In order to prevent and resolve increasingly severe environmental problems in Seoul in advance due to various construction projects, the Seoul Metropolitan Government, for the first time as a local government in Korea, legislated city decrees to introduce the EIA which has been underway from September 1, 2002. In particular, the Seoul government, unlike the Ministry of Environment, has included construction works on the list of evaluation projects, adopting the scoping and screen procedure scheme. In addition, complementing operational setbacks, the city government has revised and implemented decrees and enforcement laws on the Impact Assessment on Environment, Transportation and Disasters by shortening the consultation period, eliminating the submission of reports on construction, and expanding the waiver requirements in consultation over the reports. Therefore, development measures for the EIA scheme of the Seoul Metropolitan Government will be the target of the research. To that end, the up-to-date data of the Ministry of Environment, the Seoul government and local governments was collected, and latest materials from the EU, previous research and the Internet were gathered for analyses. By doing so, the flow of the EIA was reviewed, and the EIA schemes of local governments under the national EIA were analyzed. Furthermore, based on the Seoul government's recent data on the EIA based on the decrees, the background and legislation of the Seoul government's EIA were analyzed along with the developments for the environmental organizations. Setbacks were derived from the implementation period, evaluation procedures, consultation period and details of the EIA, and corresponding development measures were proposed.

A Study on the Revision of Regulation to Develop for Supply of SI Separation in Long-Life Housing (장수명 공동주택의 SI분리공급 활성화를 위한 제도개선 방향설정 연구)

  • Chung, Joon-Soo;Kim, Soo-Am
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.11a
    • /
    • pp.475-478
    • /
    • 2008
  • In Korea, there has been a tendency that multi-family housings are constructed by providers such as constructors or real estate agents for the economical benefits and selling efficiency, using standardized plans, load-bearing wall system, water-based construction method, and uniformized formworks. Especially, the traditional installation works which service equipments are buried into structures cause serious problems such as shortening building life span, increasing times of remodeling during specific period (100 years) and wasting resources. Also the unilateral way of massive distribution by providers for multi-family housings is not appropriate to meet the various social needs of residents. To solve these problems, it is necessary to build long-life housing which can be easily separated installations, interior and exterior finishings from structural parts. Therefore, this paper will examine the present administrative law and the civil law in order to find negative factors that can be obstructions for providing long-life housings and set the direction to revise the regulations.

  • PDF

Electronic Blasting Case Study Method Using Deck Charge (분상장약공법을 이용한 전자발파 시공사례)

  • Kim, Gab-Soo;Son, Young-Bok;Kim, Jae-Hoon;Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.33 no.1
    • /
    • pp.27-34
    • /
    • 2015
  • Recently, the residence complaints have been increased by blast vibration and noise issue due to increased urban blasting works so that the trouble between construction company and residence have been continuously increased. Deck-charge blasting method using electronic detonator provided not only blast vibration and noise control but also minimized residence complaints through shortening of the blasting period. This blasting method will be widely used for maximizing urban blasting productivity.

A Study on Behavior Characteristics of Reinforcement Zone of Block Type Mechanically Stabilized E arth Wall by Field Measurement in Curved Section (현장 계측을 통한 블록형 보강토옹벽 곡선부 보강 영역의 거동 특성 연구)

  • Lee, So-Yeon;Kim, Young-Je;Oh, Dong-Wook;Lee, Yong-Joo;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.2
    • /
    • pp.23-36
    • /
    • 2019
  • In this paper, field measurement of the Block Type Mechanically Stabilized Earth (MSE) wall curved section was performed, and the reinforced area of the curved part is studied through the result. MSE method has been applied to various fields because of easy construction and excellent economic efficiency, so that it can be easily access in our life. However due to lack of compaction and stress concentration phenomenon, cracks and collapse occur in the curve of MSE wall, which is important for safety. The cause of collapse is lack of research on curved section, lack of design criteria, lack of construction due to economical efficiency and shortening of construction period, insufficient compaction space. In this study, therefore, it was examined the existing design and construction standards, analyzed the cause through accident examples of the curved section of the Block Type MSE wall. As a result, the horizontal displacement of the curved section was 90% higher than that of the straight section and 60% higher than that of the concave section. In the case of the convex section in the curved section reinforcement region, the maximum displacement is shown in the H/2 section in the horizontal direction from the center of the MSE wall, and the range of influence from H is shown. In the case of the concave section, the maximum displacement is shown in the center, The minimum displacement was confirmed in H/4 section in the horizontal direction from the center of the MSE wall. As a basic study on the reinforcement area rehabilitation through the actual construction of block type MSE wall, the behaviors of the straight part and the curved part were compared and analyzed. And analyzed the reinforced area in order to reduce the damage of the stress concentration phenomenon and secure the safety.

Preliminary Study of Modulization Construction Method on Concrete Structure for High-rise Building (고층 콘크리트 구조물 모듈화 시공 시스템 기초연구)

  • Koh, Min-Hyeok;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Construction that over 70% of the structure consists of concrete gets bigger and higher gradually and the demand of that is increasing as well. However, it's not easy to supply young and skilled persons on construction site because of social avoidance phenomena about 3D occupation, so it causes serious problems like aging and shortage of technicians. To solve the problems, executives related to the construction field make a management effort in various ways such as construction period shortening, labor productivity improvement and good quality but recently, they have an increasing interest in the necessity of the modularization of the high-rise building and the automation of the engineering development for the strengthening of international competitive power as more active and long-term alternatives. Therefore, this study is to propose the roadmap in order to make lots of efforts in developing construction technologies of high-rise buildings by performing a foundation study, the strategy for 4-step research development, on modularized construction system of concrete structure of high-rise buildings through domestic and foreign preceding research analyses associated with optimal design modularization technique, module factory automation and assembly automation of modularized objects.

  • PDF

A Study on the Field Application of Epoxy Impregnation Method Using Elastic Storage Tube (탄성저장관을 활용한 에폭시 주입공법의 현장 적용성에 관한 연구)

  • Kim, Chun-Ho;Lee, Ho-Jin;Kim, Kyoung-Min
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.6
    • /
    • pp.72-80
    • /
    • 2018
  • In this research, we tried to investigate the influence of concrete on cracks after applying to the actual construction site using the TPS construction method which can be easily charged by the mechanical injection method. To summarize the results, the following It is as follows. First, in the case of ultrasonic velocity, it can be seen that the ultrasonic wave passes rapidly at an average of about 36 mm / sec as compared with the syringe method when using the TPS method, and in the case of the injection depth, the syringe method In the case of TPS construction method, it showed an excellent tendency that 100% of the water retentive material was charged with all the formulations under a strong injection pressure. In the case of compressive strength, it was shown that the average was increased by 16.8% at the time of using the TPS construction method, and it was found to be structurally superior. Taken together, it is possible to confirm the behavior of the crack repairing agent by improving the quality by improving the strength and confirming the window installation by filling the injection material into the closed space at the crack site when using the TPS method compared with the syringe method. In addition, it is expected that construction time will be improved by shortening the construction period of about 5 days for the TPS construction method construction section 532 m, and usability will be expanded by the crack repair method of concrete structure.