• 제목/요약/키워드: shipbuilding company

검색결과 103건 처리시간 0.021초

Constraints Evaluation for Ship-building Industry

  • Back Dong-Sik;Yoon Duck-Young
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.40-44
    • /
    • 2004
  • A fact that limits a company's ability to achieve more of its goal is referred to as a 'constraint' shipbuilding industries need to identify and manage constraints. The theory of constraints is evolved out of the problems of bottleneck formation. This happens and is conserved for the formulation if various real time problems for arriving standard uniquely addressed problems If, for example, the goal of a shipbuilding industry is to make money now and in the future, it is suggested that TOC will enable th mangers of the company to do so. TOC, focuses the organization scare resources on improving the performance of the true constraints, and therefore the bottom line of the organization. An attempt is made for the implantation of the theory into real world shipyard decision support mechanism.

  • PDF

A Survey on the Implementation of Musculoskeletal Disorders Prevention Program in Shipbuilding Industry

  • Kim, Day-Sung
    • Journal of the Ergonomics Society of Korea
    • /
    • 제31권1호
    • /
    • pp.151-156
    • /
    • 2012
  • Objective: In 2010, the rate of injuries and illnesses in the shipbuilding industry was 1.20, about 1.74 times higher than the average of overall industries(0.69). Musculoskeletal disorders(MSDs) became a major problem since 2000 in shipbuilding industry. The purpose of this study was to provide efficient implementation management through evaluating the economic effectiveness of the Musculoskeletal Disorders Prevention Program(MDPP). Successfully implementing the MDPP in the workplace may decrease the risk of MSDs and therefore reduce MSDs related costs. Methods: Occupational accident index (frequency rate, severity rate, and frequency severity indicator), estimated direct costs, and total occupational accident occurrence rate were provided by analysis of MSDs, statistical analysis of MDPP decreed companies, and data analysis of implementation. Results: The study shows the number of MSDs for MDPP decreed companies decreased 76.2% from 2,319 in 2004 to 551 in 2008. Above all, the number of MSDs decreased 78.7% in Shipbuilding industries. Forty companies (85.1%) showed a decreasing tendency and 27.7% of those had an $R^2$ > 0.7. Similar results were found in severity rate and frequency severity indicator. From these results, it appears there are a number of advantages in implementing the MDPP. Conclusion: MDPP effectiveness was demonstrated by analysing implementation and occupational accident index. A more effective and efficient implementation would take into account business sector, size, policy, and organization of the company.

A Study of the Use of Foreign Currency Derivatives in the Korean Shipbuilding Industry (한국 조선 산업의 외환 파생 상품 활용에 관한 연구)

  • Ashurov, Abdulaziz;Kim, Jae-Bong
    • Journal of Korea Port Economic Association
    • /
    • 제31권2호
    • /
    • pp.103-114
    • /
    • 2015
  • The exchange rate volatility during the global financial crisis in 2007-2009 led Korean shipbuilding companies to face currency risk. The use of foreign currency derivatives to take a risk in financial exposure affects them significantly. This research analyzes how the use of foreign currency derivatives affects the Korean shipbuilding industry in relation to its foreign sales by company type and over time, especially before and after the crisis period. It is based on statistical data presented by KOSHIPA and KOSIC in 2001-2014. The results of the analysis show that there is a significant relationship between foreign currency derivatives and foreign currency exposure for all firm sizes and years, but no relationship between them overtime.

Developing Strategies for e-partnering between the Steel Company and the Shipbuilding Company (기업간 협업체계 구현을 위한 공급체인 e-파트너링 추진방안)

  • Ahn, Young-Hyo;Sohn, Young-Woo;Whang, Kyu-Seung;Park, Myung-Sub
    • Information Systems Review
    • /
    • 제6권2호
    • /
    • pp.227-242
    • /
    • 2004
  • With the advent of the digital economy, the business eco-system has been changing from the competition system across individual companies to that of supply chains. Under the rapidly changing business environment, it becomes true that the competitive power of the steel maker depends on the shipbuilding company, an important customer of the steel maker. Accordingly, e-partnering between a steel maker and shipbuilding companies becomes important. Schemes of developing e-partnering are presented as follows: implementation of the inter-communication system, day/sequence order and supply, improvement of infrastructure such as transport, quay etc.

A Study of BLDC Motor Electric Grinder to Replace Air Grinder in Shipbuilding Company (조선 작업장의 공압 그라인더 대체용 BLDC 모터 전동 그라인더 개발 기초연구)

  • Ha, Seok-Moon;Ahn, Wooyoung
    • Proceedings of the KIPE Conference
    • /
    • 전력전자학회 2013년도 추계학술대회 논문집
    • /
    • pp.21-22
    • /
    • 2013
  • 조선 작업장에서 사용되는 에너지원 중 전기 에너지의 30% 이상이 압축공기 생산에 사용되고 있으며, 압축공기의 상당 부분은 공압 공구 구동에 사용되고 있다. 본 연구에서는 에너지 효율이 낮은 공압 공구를 전동 공구로 대체하기 위해 7인치 BLDC모터 전동 그라인더 시제품을 개발하였다. 7인치 공압 그라인더와 대등한 성능을 내기 위한 전동 그라인더의 사양은 정격 회전수는 4,500 rpm이며 정격 출력은 1.1 kW가 되어야 함을 알 수 있었다. 특히 안전 기능으로 과부하 정지 기능과 정전 재기동 방지가 가능해야 한다. 이러한 사양과 기능으로 BLDC 모터 전동 그라인더 시제품을 제작하여 조선 작업장의 여러 공종에서 테스트 한 결과 다양한 장단점 의견을 얻을 수 있었다.

  • PDF

Development of the Spatial Scheduling System and Its Applications in Shipbuilding Industry (조선공업에서의 공간일정계획 시스템 개발 및 응용)

  • Chung, Kuy-Hoon;Baek, Tae-Hyun;Min, Sang-Gyu;Kim, Hyung-Shik;Park, Ju-Chull;Cho, Kyu-Kab;Park, Chang-Kyu
    • IE interfaces
    • /
    • 제14권4호
    • /
    • pp.394-402
    • /
    • 2001
  • In this study, we deal a spatial scheduling system for the block painting process in the shipbuilding industry. In general, the spatial scheduling for the block painting process is a very complicated task. Because spatial allocation of each block in blasting and painting cells is considered simultaneously. Thus the spatial scheduling for the block painting process is the problem of planning and control of operation, which arises in shipyard. This system is developed for blocks to meet the delivery date given by the shipyard production planning system, to maximize space utilization of blasting and painting cells and to balance workload among working teams. And it has been tested using actual scheduling data from a shipyard and successfully applied in a paint shop in a shipbuilding company.

  • PDF

Enhanced Productivity By Development Of Isometric Pre-Erection (입체 PE 개발을 통한 생산성 향상)

  • Lee Jongseob;Kim Younghwan;Joe Jongrae
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 대한조선학회 2005년도 특별논문집
    • /
    • pp.185-191
    • /
    • 2005
  • Korean naval architecture company today is making researches in expansion of productivity of their own accord. In result, they have accomplished many technical developments like a ground shipbuilding system. For our company's productivity expansion in our yard's limited condition (the facility, P.E area, stock area), we develop isometric pre-erection method that turn into a possibility to maximize our facility use, minimize our dock period.

  • PDF

Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company (조선소의 메가블록 조립작업장을 위한 공간계획알고리즘 개발)

  • Koh, Shie-Gheun;Jang, Jeong-Hee;Choi, Dae-Won;Woo, Sang-Bok
    • IE interfaces
    • /
    • 제24권1호
    • /
    • pp.78-86
    • /
    • 2011
  • To mitigate space restriction and to raise productivity, some shipbuilding companies use floating-docks on the sea instead of dry-docks on the land. In that case, a floating-crane that can lift very heavy objects (up to 3,600 tons) is used to handle the blocks which are the basic units in shipbuilding processes, and so, very large blocks (these are called the mega-blocks) can be used to build a ship. But, because these mega-blocks can be made only in the area near the floating-dock and beside the sea, the space is very important resource for the process. Therefore, our problem is to make an efficient spatial schedule for the mega-block assembly yard. First of all, we formulate this situation into a mathematical model and find optimal solution for a small problem using a commercial optimization software. But, the software could not give optimal solutions for practical sized problems in a reasonable time, and so we propose a GA-based heuristic algorithm. Through a numerical experiment, finally, we show that the spatial scheduling algorithm can provide a very good performance.

Design and Development of Scenario-Based Simulation System to Improve Shipbuilding Execution Scheduling Assessment -A Case Study on Panel Line- (시나리오 기반 조선 실행계획 평가 향상을 위한 시뮬레이션 시스템 개발 -패널라인 개발 사례를 중심으로-)

  • Back, Myunggi;Kim, Youngmin;Hwang, Inhyuck;Lee, Kwang-Kook;Ryu, Cheolho;Shin, Jong Gye
    • Korean Journal of Computational Design and Engineering
    • /
    • 제18권3호
    • /
    • pp.211-223
    • /
    • 2013
  • Today's ever-increasingly competitive shipbuilding market makes it essential for a shipbuilding company to have more efficient production processes and higher productivity as well as better design ability to obtain its competitiveness. A well-established production execution schedule plays an indispensable role to achieve this goal. Most shipbuilding companies carry out an evaluation on their mid-term plan once it is established. However, no evaluation activity exists for a production execution schedule, because practically all the companies depend on the field workers for the production execution scheduling. In this study, a prototype of a ship production execution schedule evaluation system is developed based on the component based design (CBD) methodology. This system enables one to make a production execution schedule that reflects up-to-date shipyard situation and to validate whether the schedule is feasible or not by running a production simulation according to the schedule. Users can also make use of the system as a decision supporting tool that compares several different execution schedules and evaluates which one is the best execution schedule.

Optimization of Quantity Allocation using Integer Linear Programming in Shipbuilding Industry (정수 선형 최적화를 이용한 조선해양 의장품 제작 물량 할당에 관한 연구)

  • Park, JungGoo;Kim, MinGyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • 제57권1호
    • /
    • pp.45-51
    • /
    • 2020
  • In this study, we developed an allocation optimization system for supply chain management in the shipbuilding and offshore construction industry. Supply chain operation is a way of operating manufacturing company responsible for the procurement of outfitting parts. The method about how to allocate the manufacturing volume to each partner company includes important decisions. According to the allocation method, the stability of the material supplied to the final installation process is guaranteed. We improved the allocation method that was previously decided by the person in charge. Based on the optimization engine, a system is developed that can automatically allocate the production volume. For optimization model configuration, factors affecting the volume allocation were analyzed and modeled as constraint factors. A target function is defined to minimize the difference in the load variance of each partner company. In order to use the same type of volume allocation engine for various outfitting products, the amount of work done by the partner company was standardized. We developed an engine that can allocate the same production load of each production partner. Using this engine, the operating system was developed and applied to the actual offshore project. It has been confirmed that the work load variance of suppliers can be maintained uniformly using the optimization engine rather than manual method. By this system, we stabilize the manufacturing process of partner suppliers.