• 제목/요약/키워드: sewer rehabilitation project

검색결과 15건 처리시간 0.029초

하수관거 정비사업의 타당성 분석에 관한 연구 (A Study on Feasibility Analysis of Sewer Rehabilitation)

  • 한인섭;장대환;우병하;임철환
    • 상하수도학회지
    • /
    • 제23권1호
    • /
    • pp.89-96
    • /
    • 2009
  • Feasibility which is complimented before Social Overhead Capital Project and National Policy Project is analyzed by economic and political benefits. The projects will be performed if the benefits are bigger than the project cost. In this study, feasibility was examined at various viewpoints on sewer rehabilitation projects implemented with private capitals. To achieve the feasibility analysis, the B/C (Benefit/Cost Ratio), IRR (Internal Rate of Return) and the returns ratio of the Build Transfer Lease project implemented in 2007 at W city were estimated. At the same time, the correlation with B/C and benefit sensitivity of concessionary rate fluctuation were analyzed to evaluate the efficiency and feasibility of the seven sewer rehabilitation projects promoted by a local autonomous entity.

fmGA를 이용한 하수관거정비 최적화 모델 (Optimization Model for Sewer Rehabilitation Using Fast Messy Genetic Algorithm)

  • 류재나;기범준;박규홍;이차돈
    • 상하수도학회지
    • /
    • 제18권2호
    • /
    • pp.145-154
    • /
    • 2004
  • A long-term sewer rehabilitation project consuming an enormous budget needs to be conducted systematically using an optimization skill. The optimal budgeting and ordering of priority for sewer rehabilitation projects are very important with respect to the effectiveness of investment. In this study, the sewer rehabilitation optimization model using fast-messy genetic algorithm is developed to suggest a schedule for optimal sewer rehabilitation in a subcatchment area by modifying the existing GOOSER$^{(R)}$ model having been developed using simple genetic algorithm. The sewer rehabilitation optimization model using fast-messy genetic algorithm can improve the speed converging to the optimal solution relative to GOOSER$^{(R)}$, suggesting that it is more advantageous to the sewer rehabilitation in a larger-scale subcatchment area than GOOSER.

하수관거내 불량개소수와 I/I발생량간의 상관성분석 (Analysis of Correlation Between Defective Number of Sewer Pipes and I/I(Infiltration/Inflow) Volume)

  • 장대환;한인섭;우병하;홍성진
    • 상하수도학회지
    • /
    • 제23권3호
    • /
    • pp.321-329
    • /
    • 2009
  • I/I(Infiltration/Inflow) characteristics should be studied to achieve I/I reduction which is a main object of sewer rehabilitation. However, The scientific and practical studies which are based on actual survey within the country are not thorough going enough. The earlier studies were limited because of a short research period and specific region. Thus, In this study, a formula is deduced by intensive correlation analysis between defective number and I/I volume in sewer pipe. It can be used as preliminary data when the project established for cost-effective pipe rehabilitation. The study shows that the researched region have a faulty point at every 9.3m on average and prove correlation between defective number and I/I volume in sewer pipes. Thus, this study can improve the investigation system and estimate the volume of the pipe rehabilitation, when site investigations for rehabilitation have been conducted.

하수관거정비사업의 사업효과 분석 및 유량계 설치 개선방안에 관한 연구 (Analysis on Effectiveness of Sewer Rehabilitation Project and Study on Improvement of Fixed Flow Meters)

  • 안대훈;김종오
    • 한국습지학회지
    • /
    • 제15권4호
    • /
    • pp.461-469
    • /
    • 2013
  • 하수관거정비 임대형민자사업(BTL)은 많은 예산이 투입되어 전국적으로 시행되었으나 사업시행 후 나타난 사업효과에 대한 종합적인 검토는 미흡한 실정이다. 또한, 일부 사업의 경우 준공 후 측정된 유량 Data의 신뢰성 문제 및 과다한 I/I(침입수/유입수) 발생량 등으로 인해 사업의 성과에 대한 문제제기와 I/I지표의 운영평가 적용과 관련한 논란이 지속적으로 제기되고 있는 실정이다. 따라서 본 연구에서는 '05년 JC군 하수관거정비 임대형민자사업(BTL) 등 시설물 준공 후 운영성과평가가 진행 중인 연구대상 사업 15개 사업에 대하여 사업효과분석, 유량계 설치 실태 분석 및 개선방안 등을 검토하였다. 검토결과 하수관거정비 임대형민자사업(BTL) 시행 후 하수처리장 운영효율 개선, 하수관거 침입수 발생비율 저하, 주변하천 수질개선 등의 효과가 나타난 것으로 분석되었으며, 유량계 설치 및 운영 현황 조사결과 나타난 주요 문제점에 대해서는 본 연구의 개선방안 적용시 보다 신뢰성 있는 유량 데이터가 확보될 수 있는 것으로 검토되었다.

하수관거정비사업의 침입수/유입수 산정 및 활용방법 개선방안에 관한 연구 (A Study on Improvement of Inflow/Infiltration Computation and Application Method in Sewer Rehabilitation Project)

  • 김종오;정동기;안대훈
    • 상하수도학회지
    • /
    • 제28권1호
    • /
    • pp.33-45
    • /
    • 2014
  • In this study, current sewer infiltration/Inflow(I/I) computation and application method was examined about improvement and adequacy relating to the main issues raised by the field for practitioners. The results of review about infiltration calculation method were considered to be in need of improvement at 'standards of minimum sewage calculation'. Furthermore, the results of review about I/I application method were considered to be in need of improvement at 'standards of seasonal infiltration application' and 'the relative decrease in the Annual evaluation standards'. In addition, annual I/I analysis at JC County for the four years(2009~2012) in respect of operation flow and rainfall data was conducted. The result of annual infiltration analysis, compared average daily sewage generated average infiltration rate was found in 21.95 %, infiltration by unit was found in $0.31m^3/day/cm/km$ and $0.12m^3/day/day$, respectively. The result of annual inflow analysis, average rainfall - Inflow equations was found $y=5.499{\times}$($R^2$ 0.793), and the average Inflow quantity by sewer extension was predicted to $0.66m^3/mm-km$.

천공장치를 이용한 배수설비 연결관 시공 기술에 관한 연구 (A Study for Drainage Pipe Construction Method using a Boring Machine)

  • 장재구;강선홍;김동은;정태호
    • 상하수도학회지
    • /
    • 제25권6호
    • /
    • pp.869-875
    • /
    • 2011
  • Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.

하수관거정비 임대형민자사업에 있어 침입수 성과지표의 개선에 관한 연구 - 제주특별자치도를 중심으로 - (Improvement of Infiltration Performance Measurement in BTL (Build-Transfer-Lease) Sewer Rehabilitation Projects - Focusing on Jeju Special Self-Governing Province -)

  • 고영남;이동욱
    • 대한토목학회논문집
    • /
    • 제36권6호
    • /
    • pp.1133-1143
    • /
    • 2016
  • 본 연구는 하수관거정비 임대형민자사업에 있어 사업효과 분석지표의 개선에 대한 연구이다. 하수관거정비 임대형민자사업의 평가지표 중 침입수에 대한 평가지표는 단일평가항목으로 17.5점의 높은 점수가 부여되고 있다. 침입수에 대한 평가지표는 침입수의 발생량에 초점을 맞추어 평가되고 있으며, 현재 '야간 생활하수 평가법'에 따라 계산되고 있다. 그러나, 본 평가지표가 제주지역의 지질적 특성을 반영하지 못하고 있다는 것이 운영단계에서 문제점으로 대두되고 있다. 따라서 본 연구에서는 제주지역을 중심으로 평가지표에 따른 계산 결과와 실제 침입수의 발생량을 비교 분석하고자 하였다. 이를 위해서 제주도내 5개 지역에 대하여 '야간 생활하수 평가법'에 따른 침입수 발생량을 분석하였다. 또한 실제적으로 침입수가 발생하는 조건에 대하여 전수조사를 실시하였다. 분석 결과, 지하수위가 하수관거보다 밑에 분포되고 있으며, 하수관거의 기능에 대한 검증 결과 하수관거의 결함 등에 의한 침입수 발생은 없는 것으로 분석되었다. 따라서 현재 평가지표로 활용되고 있는 '야간 생활하수 평가법'은 제주지역에 적용하기에 적합하지 않다는 결론에 도달하게 되었으며, 제주지역만의 침입수 관련 기준 마련이 필요할 것으로 사료된다.

하수관거정비 BTL사업의 효과분석 및 방안 수립 연구 (Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects)

  • 송호면;조정일;안충희
    • 상하수도학회지
    • /
    • 제24권6호
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.