• Title/Summary/Keyword: sewage facility

Search Result 152, Processing Time 0.031 seconds

A Study on the Evaluation of Fuel Characteristic and Economic Benefit for Co-combustion of Dried Sewage Sludge with Coal (건조 하수슬러지의 석탄 혼소를 위한 연료특성 및 경제성 평가에 관한 연구)

  • Kang, Jeong Hee;Kang, Jong Yun;Lee, See Hyung;Kim, Byung Tae;Lee, Nam-Hoon
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.22 no.1
    • /
    • pp.11-19
    • /
    • 2014
  • A study on combustion characteristic and evaluation of cost benefit were carried out using dried sewage sludge to evaluate co-combustion with coal in a coal-fired power plant. In the result of proximate analysis, sewage sludge has 78.09%, 79.65% of moisture content in A STP(Sewage Treatment Plant) and B STP, respectively. The dried sewage sludges show 0.12, 0.14 of fuel ratio value, respectively and over 30,000kcal/kg of combustible index. It means that the dried sewage sludges needs to reform from the results of fuel ratio and combustible index. As a results of the economical benefit evaluation of dried sewage sludge, about 73.4 million won through using the dried sewage sludges instead of coal and 56.4 million won through REC(Renewable Energy Certificate) cost were saved, respectively. On the other hand, it occurs 4.2 million won of additional cost related to ash disposal and 2.6 million won of investment/operation cost for co-combustion facility. In conclusion, co-combustion of dried sewage sludges with coal in a coal-fired power plant saves about 123 million won. However, it needs to consider for power supply to produce dried sewage sludges and opportunity cost for environmental pollution and so on to evaluate more reasonable benefit of co-combustion.

A Study on the Application of Pre-Chemical Treatment on the Decentralized Domestic Wastewater Reclamation System (도시의 분산형 생활오수 재생시스템에 화학적 전처리공정도입에 관한 연구)

  • Lee, Sang-Woo;Park, Young-Mi;Seo, Gyu-Tae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.20 no.1
    • /
    • pp.115-121
    • /
    • 2006
  • The purpose of this study was to investigate applicability of pretreatment on the existing biological treatment for domestic wastewater reclamation. From Jar Tests, it was found that optimum dosage of coagulant was PAC 0.5mg/L and $FeCl_3$ 180mg/L for urban sewage. In this study, PAC 0.5mg/L was selected considering sludge production and the amount of coagulant required. In a continuous experiment performed with combining chemical coagulation and biological treatment, a considerable removal efficency was obtained in term of BOD, SS, T-N, T-P and ABS. When the raw sewage was supplied into the pre-chamical treatment facility, the removal of BOD and SS was 48.3% and 81.1%. However T-N removal was very low which means T-N consists of $NH_3-N$ mostly. T-P was almost completely recluced by the chemical addition. The effluent BOD & SS was 57~76 and 21~43mg/L, which could reduce the size of biological treatment facility. From the cost estimation pre-chemical treatment could save around half of the area required for biological treatment with post ceagulation.

Assessment of GHG Reduction Strategy - A Case of Environmental Facilities of Incheon City - (온실가스 감축 전략의 성과평가 - 지자체 환경기초시설 사례 -)

  • Jang, Jong-Ok;Lee, Sung Wook;Kim, Jong Dae
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.509-519
    • /
    • 2017
  • The study focuses on 32 environmental facilities in Incheon Metropolitan City, South Korea, categorizes them by sector: sewage treatment, wastewater treatment, incineration, landfill, water purification, and water supply. Their GHG reduction results are analyzed through quantitative and qualitative measures for 2012 to 2015. The study surveys and examines GHG reductions of the environmental facilities for two categories - facility operation and management. The findings are as follows: First, the GHG reduction rate, an emission-to-allocation ratio, from 2012 to 2015 is 89.67%. Second, GHG reductions coming from qualitative measures of facility management are even greater than those from quantitative measures of facility operation. Third, GHG reductions through facility operation are mostly attributable to overhauls, less use of facilities, resources recycling, process improvement rather than the betterment of fuels, facilities and energy efficiency. Fourth, higher reduction can be achieved by effective facility management, qualitative measures.

A study on the analysis of performance differences according to the operation method of public sewage treatment facility (공공하수처리시설 운영방식에 따른 성과 차이 분석에 관한 연구)

  • Ko, Hyunsoo;Ha, Donggyun
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.5
    • /
    • pp.357-370
    • /
    • 2022
  • This study aims to analyze the differences in performance according to various operation methods (direct management, public consignment, and private agency) of public sewage treatment facilities and derive the most efficient and high level of sewage treatment services to the public based on the research results. To this end, economic performance indicators (sewage treatment cost, sewerage rate) and social performance indicators (water quality, number of civil complaints) were selected, and cross-sectional analysis and longitudinal analysis were used to verify the difference between the averages of three or more groups through one-way ANOVA. As a result of the analysis, cross-sectional analysis, there was no difference in economic performance dimension according to the operating method, but in terms of social performance dimension, it was found that there was a difference according to the operating method. In the case of water quality indicators, the results were superior to those directly managed by public consignment and private agencies in the number of civil complaints. In the longitudinal analysis examining the improvement of performance indicators, there was no significant difference by operation method in most performance indicators. In order to improve the efficiency of public services and improve the service level, various approaches suitable for the characteristics of each service are required in addition to the logic of public consignment or introduction of private agency. In the future, when local governments promote public consignment or private agency, it is necessary to understand and promote the nature of the service, the specificity of each local government, and the needs of service users.

A Study on the Improvement Methods for Water Supply Facility Management System Implementation by GIS (GIS 기반 상수도 관망관리시스템 구축의 개선 방안에 관한 연구)

  • Yeon, Sang-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.3
    • /
    • pp.90-97
    • /
    • 2000
  • The study was aimed to extract the improvement measures for the problem on GIS application GIS for water supply and sewerage pipeline facility management in the Jechon city. For this, it performed of analysis of their working and modeling with other relational contents of the water and sewer facility management. As the results, the implementation of water and sewer facility management system by use of GIS has to applying development through relational analysis not only pipeline facility and leaking water protection, pipeline network analysis but also digital topography, drawing data, water user's information.

  • PDF

Inactivation of Microorganisms in Sewage Using a Pilot Plasma Reactor (Pilot 플라즈마 반응기를 이용한 하수 중 미생물의 불활성화)

  • Kim, Dong-Seog;Park, Young-Seek
    • Journal of Environmental Health Sciences
    • /
    • v.39 no.3
    • /
    • pp.289-299
    • /
    • 2013
  • Objectives: For the field application of the dielectric barrier discharge plasma reactor, scale-up of the plasma reactor is needed. This study investigated the possibility of inactivation of microorganisms in sewage using pilot multi-plasma reactor. We also considered the possibility of degradation of total organic carbon (TOC) and nonbiodegradable matter ($UV_{254}$) in sewage. Methods: The pilot plasma reactor consists of plasma reactor with three plasma modules (discharge electrode and quartz dielectric tube), liquid-gas mixer, high voltage transformers, gas supply equipment and a liquid circulation system. In order to determine the operating conditions of the pilot plasma reactor, we performed experiments on the operation parameters such as gas and liquid flow rate and electric discharge voltage. Results: The experimental results showed that optimum operation conditions for the pilot plasma reactor in batch experiments were 1 L/min air flow rate), 4 L/min liquid circulation rate, and 13 kV electric discharge voltage, respectively. The main operation factor of the pilot plasma process was the high voltage. In continuous operation of the air plasma process, residual microorganisms, $UV_{254}$ absorbance and TOC removal rate at optimal condition of 13 kV were $10^{2.24}$ CFU/mL, 56.5% and 8.6%, respectively, while in oxygen plasma process at 10 kV, residual microorganisms, $UV_{254}$ absorbance and TOC removal rate at optimal conditions were $10^{1.0}$ CFU/mL, 73.3% and 24.4%, respectively. Electric power was increased exponentially with the increase in high voltage ($R^2$ = 0.9964). Electric power = $0.0492{\times}\exp^{(0.6027{\times}lectric\;discharge\;voltage)}$ Conclusions: Inactivation of microorganisms in sewage effluent using the pilot plasma process was done. The performance of oxygen plasma process was superior to air plasma process. The power consumption of oxygen plasma process was less than that of air plasma process. However, it was considered that the final evaluation of air and oxygen plasma must be evaluated by considering low power consumption, high process performance, operating costs and facility expenses of an oxygen generator.

Economic Evaluation of Integrated Operation & Management through Operation Performance Analysis of Sewage Facilities (하수도시설 통합운영 성과분석을 통한 통합운영관리의 경제성 평가)

  • Shin, Jungsub;Chung, Seokhyun;Cho, Byoungog;Lee, Kwanhyung;Kang, Seonhong;Kim, Yongdae;Yoon, Joonjae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • For economic evaluation of integrated operation to sewage facilities, benefit-cost analysis was performed to watershed sewage works project in 7 watershed areas, 156 facilities. In this study, the cost before and after integrated operation was compared and benefits are calculated from the reduction of operators, increasement treated pollution loads, reduction cost through operation convenience, reduction water consumption through effluent reuse, and improvement of life benefit. The result showed that cost was 8,500million won and benefit was 16,747million won, so benefit was 49% higher than cost. B/C analysis result showed that B/C ratio was 1.97 and it is similar to other researches. The benefits of integrated operation included convenience of data management, increase of emergency response, decrease of complains with sewage which was not reflected numerically, so the benefits of integrated operation were expected much greater than this result

Investigation on Combustion Characteristics of Sewage Sludge using Pilot-scale Bubbling Fluidized Bed Reactor (파일럿 규모 기포 유동층 반응기를 이용한 하수 슬러지 연소 특성 분석)

  • Kim, Donghee;Huh, Kang Y.;Ahn, Hyungjun;Lee, Youngjae
    • Clean Technology
    • /
    • v.23 no.3
    • /
    • pp.331-342
    • /
    • 2017
  • To estimate the combustion characteristics of sewage sludge and wood pellet, thermogravimetric analysis (TGA) was conducted. As TGA results, combustion characteristics of sewage sludge was worse than wood pellet. In ash fusion temperature (AFT) analysis, slagging tendency of sewage sludge is very high compared to wood pellet. And also, the bubbling fluidized bed reactor with a inner diameter 400 mm and a height of 4300 mm was used for experimental study of combustion characteristics fueled by sewage sludge and wood pellet. The facility consists of a fluidized bed reactor, preheater, screw feeder, cyclone, ash capture equipment and gas analyzer. The thermal input of sewage sludge cases were $54.5{\sim}96.5kW_{th}$, in case of wood pellet experiment, it was $96.1kW_{th}$. As experiment results, the $NO_x$ emission of sewage sludge was averagely about 10 times the $NO_x$ emission of wood pellet. And also CO emission of sewage sludge is about 3.5 times of wood pellet. Lastly as a result of analysis of captured ash in cyclone, the combustion efficiency of all cases were over 99%, but the potential for slagging/fouling was high at all cases by component analysis of ash.

Feasibility Study on the Construction of Small Hydro-Power Plants in Gumi Sewage Treatment Plant Discharge Point (구미하수처리장 방류구에서의 소수력발전 설치 및 운영에 관한 연구)

  • Nah, Dong-Hun;Lee, Seung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.2
    • /
    • pp.173-181
    • /
    • 2010
  • This study was conducted to investigate the possible installation of small hydro-power plant at the discharge point of Gumi sewage treatment plant (STP) using treated wastewater. Sufficient amount of water to transfer to electric power and the selection of proper location are two essential elements for the construction of small hydro-power facility. Preliminary analysis based on site visit and existing data in Gumi STP were made. Capacity of the small hydro-power plants and exact location were determined by geomorphological condition and flow duration characteristics. Flow duration characteristics and its duration curve were identified using monthly rainfall data in Gumi STP. Relevant facts of small hydro-power system in other STP were referred to adopt to Gumi STP situation. Flowrate of treated effluents and effective head between flow chamber and the location of hydraulic turbine in Gumi STP are found to be $3.70m^3$/sec and 3.5m respectively. Electric generation rate based on this feasibility study was estimated to be 86.3kW/h. Yearly electric generation rate was expected to be 932.4MMh. Proposed small hydro-power plant construction in Gumi STP is to be reasonable.

Light Tar Decomposition of Product Pyrolysis Gas from Sewage Sludge in a Gliding Arc Plasma Reformer

  • Lim, Mun-Sup;Chun, Young-Nam
    • Environmental Engineering Research
    • /
    • v.17 no.2
    • /
    • pp.89-94
    • /
    • 2012
  • Pyrolysis/gasification technology utilizes an energy conversion technique from various waste resources, such as biomass, solid waste, sewage sludge, and etc. to generating a syngas (synthesis gas). However, one of the major problems for the pyrolysis gasification is the presence of tar in the product gas. The tar produced might cause damages and operating problems on the facility. In this study, a gliding arc plasma reformer was developed to solve the previously acknowledged issues. An experiment was conducted using surrogate benzene and naphthalene, which are generated during the pyrolysis and/or gasification, as the representative tar substance. To identify the characteristics of the influential parameters of tar decomposition, tests were performed on the steam feed amount (steam/carbon ratio), input discharge power (specific energy input, SEI), total feed gas amount and the input tar concentration. In benzene, the optimal operating conditions of the gliding arc plasma 2 in steam to carbon (S/C) ratio, 0.98 $kWh/m^3$ in SEI, 14 L/min in total gas feed rate and 3.6% in benzene concentration. In naphthalene, 2.5 in S/C ratio, 1 $kWh/m^3$ in SEI, 18.4 L/min in total gas feed rate and 1% in naphthalene concentration. The benzene decomposition efficiency was 95%, and the energy efficiency was 120 g/kWh. The naphthalene decomposition efficiency was 79%, and the energy yield was 68 g/kWh.