Stress Monitoring System for Buried Gas Pipeline in Poor Ground (연약지반 배관응력 모니터링 시스템 개발 및 적용)

  • Hong, Seong-Kyeong;Kim, Joon-Ho;Jeong, Sek-Young
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.1 s.73
    • /
    • pp.41-47
    • /
    • 2006
  • This paper introduces stress monitoring system for buried gas pipeline in poor ground. During the six months of improvement construction of poor ground, maximum settlement of gas pipeline is about 40 cm. This value represents relative small compared to the initial settlement estimation of ground improvement construction plan, 90 cm. Also, this paper includes the result of finite element analysis of gas pipeline to confirm safety of pipelines in poor ground. The stress monitoring system for gas pipeline was developed to guarantee the safety of buried gas pipeline in poor ground. Eventually, the ground improvement workings are ended safely and it is proved that the pipeline has no safety problem.

Estimation of Reinforced Roadbed Thickness based on Experimental Equation (노반재료의 소성침하 예측식을 이용한 강화노반 두께 산정)

  • Shin, Eun-Chul;Yang, Hee-Saeng;Choi, Chan-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1747-1755
    • /
    • 2008
  • Design of the reinforced roadbed thickness is concerned with safe operation of trains at specified levels of speed, axle load and tonnage. There are two methods for evaluating it. One is using an experimental equation and the other is using elastic theory with considering axle load, material properties of subsoils and allowable elastic settlement. Multi-layered theory is used to determine reinforced roadbed thickness by RTRI. Although their reinforced roadbed thickness is designed with an objective of achieving a minimum standard 2.5mm of settlement on the subgrade surface, it is hardly applied to real design. Li(1994) has suggested the experimental model which design approach is to limit plastic strain and deformations for the design period. It is worth due to adopting soil equivalent number of repeated load application. Moreover, it has been a more advanced method than existing design methods because including resilient modulus of subsoil beneath track, soil deviator stress caused by train axle loads and MGT. In this paper, it is analyzed under domestic track conditions to estimate the reinforced roadbed thickness with different soil types.

  • PDF

Estimation of Horizontal Coefficient of Consolidation Using Velocity Method (압밀속도법을 이용한 수평압밀계수 산정)

  • 김지용;김정기;염혜선;김수삼
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.385-391
    • /
    • 2000
  • Velocity method was supposed by Parkin et al.(1985) in order to supplement previous log t and (equation omitted) method. This study was to present the method for estimating the horizontal coefficient of consolidation by using velocity method which was based on the Barren's equation. Velocity method throughly eliminated not only settlement curve which had shape with difficulty in evaluating coefficient of consolidation but also the effect of unknown intial compression, the secondary consolidation and occurrence of unknown point by using velocity instead of settlement. The purpose of this study is to investigate its application in field. Velocity method was used in obtaining horizontal coefficient of consolidation in Kyung-gi area. Horizontal coefficient of consolidation using velocity method was calculated and compared with log t method, √t method Magnan & Deroy's method, Bergado's method.

  • PDF

A Study on the Improvement Method of Settlement Environment in Rural Area (농촌정주환경의 정비수법에 관한 연구)

  • IckHwanKim
    • Journal of the Korean housing association
    • /
    • v.6 no.2
    • /
    • pp.123-137
    • /
    • 1995
  • This paper presents the directions for the settling environment improvement of 244 Eups and Myeons in the Kyung buk province. Depending on their regional types. The analysis results are as follows : 1) According to the index of general estimation each regional group is classified into the developing country. suburban country. flatland country or mountain country. 2) The regional type is classified into densly-inhabitated district. less-dense district. non-developing district or perishing district. 3) The results of the dwelling environment estimation pointed out that social protection. living convenience. and neighborship are important factors for environmental improvement, depending on the regional type. From above, each region has different regional characteristics and environmental estimation structure. It is suggested to establish improvement directions. based on them.

  • PDF

Estimation of compressibility for Busan clay by CPT (CPT를 이용한 부산점토의 압축특성에 관한 연구)

  • Hong, Sung-Jin;Lee, Moon-Joo;Shim, Seong-Hyeon;Lee, Woo-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.320-325
    • /
    • 2009
  • The constrained modulus, representative property to evaluate compressibility of soil, is needed to estimate the settlement of ground structure. A series of lab and field cone penetration tests for clayey soil of Busan new-port and Noksan industrial area were conducted to evaluate the estimation method of constrained modulus. Since CPT generates large deformation of ground, it is difficult to correlate the cone resistance with the constrained modulus. Therefore, appropriate correlation between them is essential to estimate the constrained modulus based on CPT results. The test results show that the ratio of the constrained modulus to the cone resistance is inversely proportional with plasticity index. Based on this result, the estimation method of constrained modulus for Busan clay is suggested.

  • PDF

An Experimental Study on the Estimation of Optimum Length of Soil Flow Protector with Wall Stiffness (벽체 강성에 따른 토사유입차단판의 최적 길이 산정에 관한 실험적 연구)

  • Yoo, Jae-Won;Seo, Min-Su;Son, Su-Won;Im, Jong-Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.789-799
    • /
    • 2019
  • The settlement hardly occurs in structures supported by pile foundation such as abutment, culvert but a cavity is formed in the lower part of a structure. As a result, soil discharged from the lateral ground to the cavity accelerates the settlement of the lateral ground of the structure, resulting in a larger settlement. Therefore, in order to prevent problems caused by cavity under the structure supported by pile foundation, soil Flow Protector (briefly called 'FLP'), which can be easily installed on the side of structure, was developed. In this study, an laboratory model test was carried out to prove the reduction effect of settlement and to estimate the optimal installation length of the FLP. As a result, the installation of the FLP reduced the settlement of the lateral ground and prevented the leakage of lateral ground soil into the cavity. If the stiffness of the FLP is small, the state or active earth pressure is generated in the upper part, which is not favorable for stability. But if the stiffness of the FLP is high enough, the passive earth pressure area is generated in the upper part, which will be advantageous for the stability. Also, the increased installation length of FLP is effective to reduce the settlement. And the ratio of the optimal length of the FLP to the box structure height (H = 250 mm) are flexible FLP 1.38, stiff FLP 0.73.

Suggestion of the Settlement Estimation Method for Granular Compaction files Considering Lateral Deformations (횡방향 변형을 고려한 조립토 다짐말뚝의 침하량 평가기법 제안)

  • Hwang Jung-Soon;Kim Hong-Taek;Kim Seung-Wook;Koh Yong-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.149-157
    • /
    • 2005
  • In cases of the loosely accumulated ground and soft clayey soils, the settlement criterion usually governs in evaluating the stability of structures. The settlement is also a dominant factor to control the design of granular compaction piles mainly applied to the reinforcement of foundation structures in soft ground. In the previous studies, settlement behaviors of granular compaction piles have generally been analyzed with an evaluation of the settlement reduction factor based on the load-sharing ratio and the replacement ratio. In this approach, however, since the reinforced ground with granular compaction piles is simplified as the composite ground, only the difference of a relative vertical strength between piles and soils is taken into account without reflecting lateral behaviors of granular compaction piles. In the present study, the method of estimating the settlement of granular compaction piles is proposed by synthetically considering a vertical strength of the ground, lateral behaviors of granular compaction piles, the strength of pile materials, a pile diameter, and an installation distance of the pile. Further, far the verification of a validity of the proposed method, predicted settlements are compared with results from previous studies. In addition, parametric studies are performed together with detailed analyses of relevant design parameters.

A Study of sea Dike meterials loss due to Scouring and Consolidation Settlement During the Periond of Construction on Construction on the West Cost of Korea (서해암 방조제 공사 기간중 유실토량 측정시험)

  • 안재숙
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.1
    • /
    • pp.2503-2519
    • /
    • 1972
  • The studies were carried out to find the cause and the quantitative evaluation of sea dike materials loss which is occured during the period of construction works for the tideland reclamation projects on the west coast of Korea. Major subjects to studies were to establish the typical relationships between the tidal flow and the movement of dike materials, the tidal-flow and the erosion, the dike materials and the ratio of material movement(losses), construction methods and the ratio of materials movement (losses). Based on the above subjects, the studies were made for the purpose of obtain the following informations; (1) Collecting and evaluaing the data of dike material losses due to foundation settlement, from designed existing dikes on the west coast. (2) By the field investigation at A-San Sea Dike, Pyong Taek Project, the Comparison would be made by the relationships between the tide velocity and the movement of dike foundation under the natural conditions and the period of construction so that find out the relationship between the dike materials of foundation situation and settlements. With regard to the dike construction works, it is so difficult to calculate the exact quantity of material losses due to the foundation settlements. The major factors that affect the settlement losses of the dike materials are: (1) Topographical variation (2) Swepting the sectional area of dike by the tide velocity. (3) Dumping riprap to the outerside of dike during the period of construction works. (4) Sectional area losses by the cause of occurence of the new tide channels. (5) material losses by the heavy storms. (6) Consolidation settlement by the foundation weakness. (7) Material losses by the earth materials by tide flow. Most hi호 material losses were occured by the Consolidation settlement due to the foundation weakness, the maximum tide velocities due to decrease the cross sectional area of the gaps and erosion of foundation due to the range of tide, Inner and outerside of dike, or dike material loses due to the tide flow. Final conclusion would be obtained by the continuous measurement of consolidation settlement at the stage of final clusure of the dike. (It is scheduled to close on the end of 1972) However, intermediate conclusion can be introduced as follows: (1) The estimation of material(losses) during the period of construction works for the existing sea-dikes up to date were only empirical. The material losses at the general closure for design was estimated at 10% of the riprap, 20% of the earth materials, and 20% of the riprap, 40% of the earth materials at the final closure of the dike. The final closure estimated double quantity to the general closure, but it is still doubt. (2) The ratio of consolidation settlements was found smaller than the calculated quantity. It can be foreseen that settlement speeds is higher thom the calculated speeds. (3) The movement of dike foundation under the natural conditions were not so depends on the geological conditions of the foundation. (4) When the tide velocities was estimated 100 at the normal tide, it was estimated 125 at the high tide and 55 at the low tide. The tide velocities at the low tide shows apparently lower than the high tide and the higher velocities at the deep water depth.

  • PDF

Tunneling-induced Building Damage Risk Assessment System (터널굴착에 따른 인접건물 손상위험도 평가시스템)

  • Park, Yong-Won;Yoon, Hyo-Seok
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.3
    • /
    • pp.51-59
    • /
    • 2002
  • This paper deals with development of a damage risk assessment system for adjacent buildings to under-passing tunnel face considering 3D-ground movement. The system consists of building and ground information module, monitoring data module, settlement evaluation module, and building damage risk assessment module. The major modules, settlement evaluation module and building damage assessment module, are based on settlement estimation model suggested by Attewell et al (1982) and the building damage assessment method by Mair et al. (1996). After estimating 3D-ground movements due to tunneling with settlement evaluation module, damage assessment far buildings is performed using building damage risk assessment module. The developed system has two major functions; 1) calculation of 3D-settlement with ground loss ($V_{s}$)or maximum settlement ($w_{max}$) and inflection point (i) using various empirical formulae, monitoring data, numerical results, and so on; 2) assessment of damage risk for adjacent buildings of arbitrary section with position change of tunnel face. The field data given by Boscadin and Cording (1989) leer the case of two-storied masonry building near the Metro tunnel in Washington D.C. was simulated to verify the applicability of the developed system.

Stability Estimation of NATM Tunnel due to Excavation using Back Analysis (역해석기법을 통한 NATM 터널의 안정성 평가)

  • Lee, Jae-Ho;Kim, Young-Su;Jin, Guang-Ril;Park, Jin-Kyu;Park, Si-Hyun;Choi, Chil-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.494-504
    • /
    • 2008
  • Successful design, construction and maintenance of NATM tunnel demands prediction, control, stability estimation and monitoring of surface settlement, gradient and ground displacement with high accuracy. Back analysis using measured data and forward analysis have been and are indispensable tools to achieve this goal. Sakurai provided the hazard warning levels for assessing the stability of tunnels using the relation of critical strain and apparent Young's modulus. This paper performed the estimation of tunnel stability on construction. Firstly, the apparent Young's modulus concept and back analysis method is introduced for the assessment of tunnel safety during excavation a brief framework. Secondly, this paper deals with case study using "Apparent Young's modulus" and "Back analysis" for the purpose of estimating the stability of NATM tunnel in Korea. Finally, a general method that can be estimated the tunnel stability discussed by a flow chart.

  • PDF