• Title/Summary/Keyword: sequence-dependent setup costs

Search Result 5, Processing Time 0.019 seconds

A Simulated Annealing Algorithm for the Capacitated Lot-sizing and Scheduling problem under Sequence-Dependent Setup Costs and Setup Times (순서에 종속된 준비 시간과 준비 비용을 고려한 로트사이징 문제의 시뮬레이티드 어닐링 해법)

  • Jung, Jiyoung;Park, Sungsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.2
    • /
    • pp.98-103
    • /
    • 2006
  • In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- dependent setup costs and setup times (CLSPSD) is considered. This problem is the extension of capacitated lot-sizing and scheduling problem (CLSP) with an additional assumption on sequence-dependent setup costs and setup times. The objective of the problem is minimizing the sum of production costs, inventory holding costs and setup costs satisfying customers' demands. It is known that the CLSPSD is NP-hard. In this paper, the MIP formulation is presented. To handle the problem more efficiently, a conceptual model is suggested, and one of the well-known meta-heuristics, the simulated annealing approach is applied. To illustrate the performance of this approach, various instances are tested and the results of this algorithm are compared with those of the CLPEX. Computational results show that this approach generates optimal or nearly optimal solutions.

A Cell Formation Model For Manufacturing System with Sequence Dependence (가공순서에 종속적인 제조시스템을 위한 군형성모형)

  • 홍상우
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.49
    • /
    • pp.59-65
    • /
    • 1999
  • This paper considers the cell formation in a manufacturing environment where the setup times and costs are significantly dependent on the sequence. The trade-off between saving on the setup costs and additional investment on new machines is considered for determining the economic number of cells. Accordingly, This paper develops a mixed integer program and mentions a variety of manufacturing situations where this model can be useful. This paper also includes an illustrative example.

  • PDF

Two-Echelon Production-Inventory System with Sequence Dependent Setup Costs (생산준비 비용이 생산순서에 종속적인 경우의 2단계 생산-재고 시스템)

  • Moon, Dug-Hee;Hwang, Hark
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.2
    • /
    • pp.65-74
    • /
    • 1993
  • In this paper, a two-echelon production-inventory model is developed which integrates the production scheduling problem of the multi-products produced on a single facility and the inventory problem of the related raw materials. The setup costs of the final products are assumed to be dependent on the production sequence. The aim is to determine simultaneously the production cycle time and the production sequence of the final products, and the procurement cycle times of the raw materials. For the model developed, a solution algorithm is suggested and illustrated with a numerical example. And the result is compared with those obtained by two separate subproblems.

  • PDF

Common Due-Date Assignment and Scheduling with Sequence-Dependent Setup Times: a Case Study on a Paper Remanufacturing System

  • Kim, Jun-Gyu;Kim, Ji-Su;Lee, Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.18 no.1
    • /
    • pp.1-12
    • /
    • 2012
  • In this paper, we report a case study on the common due-date assignment and scheduling problem in a paper remanufacturing system that produces corrugated cardboards using collected waste papers for a given set of orders under the make-to-order (MTO) environment. Since the system produces corrugated cardboards in an integrated process and has sequence-dependent setups, the problem considered here can be regarded as common due-date assignment and sequencing on a single machine with sequence-dependent setup times. The objective is to minimize the sum of the penalties associated with due-date assignment, earliness, and tardiness. In the study, the earliness and tardiness penalties were obtained from inventory holding and backorder costs, respectively. To solve the problem, we adopted two types of algorithms: (a) branch and bound algorithm that gives the optimal solutions; and (b) heuristic algorithms. Computational experiments were done on the data generated from the case and the results show that both types of algorithms work well for the case data. In particular, the branch and bound algorithm gave the optimal solutions quickly. However, it is recommended to use the heuristic algorithms for large-sized instances, especially when the solution time is very critical.

A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System (제지 재제조 시스템에서의 자원제약을 고려한 로트 크기 결정 및 일정 계획에 대한 사례연구)

  • Kim, Hyeok-Chol;Doh, Hyoung-Ho;Yu, Jae-Min;Kim, Jun-Gyu;Lee, Dong-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.77-86
    • /
    • 2012
  • We consider the capacitated lot-sizing and scheduling problem for a paper remanufacturing system that produces several types of corrugated cardboards. The problem is to determine the lot sizes as well as the sequence of lots for the objective of minimizing the sum of setup and inventory holding costs while satisfying the demand and the machine capacity over a given planning horizon. In particular, the paper remanufacturing system has sequence-dependent setup costs that depend on the type of product just completed and on the product to be processed. Also, the setup state at one period can be carried over to the next period. An integer programming model is presented to describe the problem. Due to the complexity of the problem, we modify the existing two-stage heuristics in which an initial solution is obtained and then it is improved using a multi-pass interchange method. To show the performances of the heuristics, computational experiments were done using the real data, and a significant amount of improvement is reported.