A Case Study on Capacitated Lot-sizing and Scheduling in a Paper Remanufacturing System |
Kim, Hyeok-Chol
(Department of Industrial Engineering, Hanyang University)
Doh, Hyoung-Ho (Department of Industrial Engineering, Hanyang University) Yu, Jae-Min (Department of Industrial Engineering, Hanyang University) Kim, Jun-Gyu (Department of Industrial Engineering, Hanyang University) Lee, Dong-Ho (Department of Industrial Engineering, Graduate School of Technology and Innovation Management, Hanyang University) |
1 | Bouchriha, H., Ouhimmou, M., and D'Amours, S.; "Lot sizing problem on a paper machine under a cyclic production approach," International Journal of Production Economics, 105(2) : 318-328, 2007. DOI ScienceOn |
2 | Drexl, A. and Kimms, A.; "Lot sizing and scheduling -survey and extensions," European Journal of Operational Research, 99(2) : 221-235, 1997. DOI ScienceOn |
3 | Gupta, D. and Magnusson, T.; "The capacitated lotsizing scheduling problem with sequence-dependent setup costs and setup times," Computers and Operations Research, 32(4) : 727-747, 2005. DOI ScienceOn |
4 | Haase, K.; "Capacitated Lot-sizing with sequence dependent setup costs," OR Specktrum, 18(1) : 51-59, 1996. DOI |
5 | Haase, K. and Kimms, A.; "Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities," International Journal of Production Economics, 66(2) : 159-169, 2000. DOI ScienceOn |
6 | Salomon, M., Kroon, L. G., Kuik, R., and Van Wassenhove L. N.; "Some Extensions of the Discrete Lotsizing and Scheduling Problem," Management Science, 37(7) : 801-812, 1991. DOI ScienceOn |
7 | Shim, I.-S., Kim, H.-C., Doh, H.-H., and Lee, D.-H.; "A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs," Computers and Industrial Engineering, 61(4) : 920-929, 2011. DOI ScienceOn |
8 | Trigeiro, W. W., Thomas, L. J., and McClain J. O.; "Capacitated lot sizing with setup times," Management Science, 35(3) : 353-366, 1989. DOI ScienceOn |
9 | Zhu, X. Y. and Wilhelm, W. E.; "Scheduling and lot sizing with sequence-dependent setup : a literature review," IIE Transactions, 31(11) : 987-1007, 2006. |