• Title/Summary/Keyword: scheduling management

Search Result 1,286, Processing Time 0.029 seconds

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

Development of a Scheduling Assistant Program for Usability Improvement of Construction Scheduling Solutions (건설 공정관리 솔루션의 활용성 증대를 위한 공정표 작성 지원 프로그램 개발)

  • Park, Sung Hwan;Lee, Si Wook;Woo, Sungkwon;Shin, Do Hyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.413-421
    • /
    • 2010
  • Scheduling management is one of the most important factors for the efficient performance of construction projects. Various computer-aided solutions for schedule management have been developed, but they are not commonly used in practice. This study conducted surveys on scheduling management methods and the related solutions to identify their status and problems in practice. Based on the results of the surveys, this study also developed a scheduling assistant program to improve the usability of scheduling management solutions. Through the developed program, the usability of scheduling management solutions will be improved in practice, thus enabling efficient scheduling management.

A Study on Memetic Algorithm-Based Scheduling for Minimizing Makespan in Unrelated Parallel Machines without Setup Time (작업준비시간이 없는 이종 병렬설비에서 총 소요 시간 최소화를 위한 미미틱 알고리즘 기반 일정계획에 관한 연구)

  • Tehie Lee;Woo-Sik Yoo
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.1-8
    • /
    • 2023
  • This paper is proposing a novel machine scheduling model for the unrelated parallel machine scheduling problem without setup times to minimize the total completion time, also known as "makespan". This problem is a NP-complete problem, and to date, most approaches for real-life situations are based on the operator's experience or simple heuristics. The new model based on the Memetic Algorithm, which was proposed by P. Moscato in 1989, is a hybrid algorithm that includes genetic algorithm and local search optimization. The new model is tested on randomly generated datasets, and is compared to optimal solution, and four scheduling models; three rule-based heuristic algorithms, and a genetic algorithm based scheduling model from literature; the test results show that the new model performed better than scheduling models from literature.

A Basic Study for Accumulating Scheduling Knowledge-Base (공정관리 지식기반 구축을 위한 기초적 연구)

  • Jang Se-Han;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.83-91
    • /
    • 2001
  • Generally the level of accumulating scheduling knowledge-base in Korean construction companies is in the scheduling knowledge-base infrastructure construction phase and Even in top 10 construction companies, the level is in early scheduling knowledge activity phase. The principle causes of this situation are unawareness of importance to scheduling knowledge and absence of procedure related to scheduling knowledge-base. This research analyzes the problems to accumulate scheduling knowledge-base in Korean construction companies and proposes a procedure model to accumulate scheduling knowledge-base property, which adds items of scheduling knowledge-base infrastructure and scheduling knowledge activity to the existing scheduling procedures of Korean construction companies. Using procedure model for accumulating scheduling knowledge-base, Korean construction companies can develop a new scheduling procedure and accumulate scheduling knowledge accordingly. If scheduling knowledge were accumulated property according to the procedure, a framework for knowledge management system could be provided.

  • PDF

A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

A Modular Decomposition Model for Software Project Scheduling

  • Kim, Kiseog;Nag, Barin N.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.18 no.3
    • /
    • pp.129-149
    • /
    • 1993
  • The high level of activity in the development and maintenance of computer software makes the scheduling of software projects an importnat factor in reducing operating costs and increasing competitiveness. Software activity is labor intensive. Scheduling management of hours of software work is complicated by ther interdependencies between the segments of work, and the uncertainties of the work itself. This paper discusses issues of scheduling in software engineering management, and presents a modular decomposition model for software project scheduling, taking advantage of the facility for decomposition of a software project into relatively independent work segment modules. Modular decomposition makes it possible to treat scheduling as clustering and sequencing in the context of integer programming. A heuristic algorithm for the model is presented with some computational experiments.

  • PDF

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

Issues and approaches to spatial scheduling (공간 일정 계획의 이슈들과 접근방법)

  • 이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.758-759
    • /
    • 1995
  • In large-scale industry such as shipbuilding, aircraft manufacturing, and construction industry etc., it is required to consider two or three-dimensional spatial availability as one of bottlenecked resource constraints. We call this kind of scheduling a spatial scheduling, which considers the dynamic spatial layouts of objects as well as the traditional resource constraints. Since 1991, we have researched on the spatial scheduling for shipbuilding plant (Lee & Lee, 1992; Lee et al., 1994, Lee et al., 1995). In this paper, we present the various issues of spatial scheduling for the researchers and developers attacking spatial scheduling problems.

  • PDF

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

An Excel-Based Scheduling System for a Small and Medium Sized Manufacturing Factory (중소 제조기업을 위한 엑셀기반 스케쥴링 시스템)

  • Lee, Chang-Su;Choe, Kyung-Il;Song, Young-Hyo
    • Journal of Korean Society for Quality Management
    • /
    • v.36 no.2
    • /
    • pp.28-35
    • /
    • 2008
  • This study deals with an Excel-based scheduling system for a small and medium sized manufacturing factory without sufficient capability for managing full-scale information systems. The factory has the bottleneck with identical machines and unique batching characteristics. The scheduling problem is formulated as a variation of the parallel-machine scheduling system. It can be solved by a two-phase method: the first phase with an ant colony optimization (ACO) heuristic for order grouping and the second phase with a mixed integer programming (MIP) algorithm for scheduling groups on machines.