• 제목/요약/키워드: schedule planning

검색결과 363건 처리시간 0.024초

The Digital Mock-Up Information System for New Car Development

  • Min, Sung-Ki;Lee, Chul-Woo
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 1999년도 학술대회지 vol.1
    • /
    • pp.277-299
    • /
    • 1999
  • Since Chrysler Motor Co. had experienced the digital development system in the beginning of 1990's, most of leading automobile companies are trying to apply a digital information system for their own business process reengineering based upon concurrent engineering system from product planning phase. This is called as virtual DMU(Digital Mock-Up) system instead of the traditional PMU(Physical Mock-Up) system. By using the virtual prototype, all of the design requirements and system specifications can be checked, changed and optimized more quickly and more efficiently. This paper consists of five chapters for the DMU information system. In the 1$^{st}$ chapter, the principle of digital design system is suggested by using four basic modules such as product design module, process design module, manufacturing system design module and central control module. The basic scheme of DMU is introduced with the benefits of application in the chapter 2. In the chapter 3, a digital design process of new car development is explained with the detailed DMU design and design review processes. In the chapter 4, the practical DMU manufacturing techniques and applications are introduced as CAD/CAM analyses, DPA(Digital Pre-Assembly)reviews for development, production, operation and maintenance phases, digital tolerance analyses and digital factory analyses for assembling line simulation, automated robot welding processes, production jig & fixtures and painting process simulation. Finally, the activities of digital design support; CAS-styling, CAE-engineering and CAT-testing are summarized for design optimization in the chapter 5. As today's automobile manufactures and related business organizations are struggling to compete in the global marketplace, they are concentrating on efficient use of DMU information system to reduce the new car development cost, to have shorten the delivery schedule and to improve product design quality. To meet the demand of those automobile industries on digital information systems, the CALS(Computer aided Acquisition and Logistics Support) and EC(Electronic Commerce)initiative has been focused as a dominant philosophy in defense & commercial industries, specially automobile industries.s.

  • PDF

건설 클레임에 대비한 정보관리시스템 개발 (Developing a Project Management Information System for Construction Claims)

  • 왕한겸;박준일;최재현
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.70-81
    • /
    • 2018
  • 건설 산업에서의 클레임은 프로젝트 수익성에 심각한 영향을 미칠 수 있으며 적절한 예방 조치를 취하지 않으면 프로젝트의 실패를 야기할 수 있다. 프로젝트 실행 과정에서 잠재적인 클레임 및 분쟁을 적절하게 예방하고 대응하기 위해서는 체계적이고 지속적인 정보의 축적과 주요 작업에 대한 역할 및 책임에 대한 명확한 정의가 필요하다. 이러한 필요성을 바탕으로 본 연구는 건설프로젝트 정보관리시스템(PMIS)을 개발하고 검증한다. 개발된 시스템은 일정, 비용, PM/CM, 설계, 협업, 클레임과 같은 관리 모듈이 포함되며 개발된 시스템을 검증하기 위해 실제 프로젝트 사례에 적용하였다. 적용 결과는 건축 클레임에 특화된 정보시스템이 더욱 사용자의 친숙도를 고려하여 개발되어야 함과 발주자와 계약자 모두가 정보관리시스템을 사용할 때 더욱 효과적이라는 것을 보여준다.

건설공사 공정별 작업기간 산정을 위한 신경망 기반 모형 구축 (Development of Estimation Model of Construction Activity Duration Using Neural Network Theory)

  • 조빛나;김현승;강인석
    • 한국산학기술학회논문지
    • /
    • 제16권5호
    • /
    • pp.3477-3483
    • /
    • 2015
  • 공정계획 수립 시 각 공정별 작업기간 산정은 프로젝트 전체 공사기간 및 사업비용 결정과 직결되기 때문에 합리적인 산정계획이 요구된다. 그러나 일반적으로 작업기간 산정은 공사 담당자의 경험과 직관을 통해 이루어지고 있고, 다양한 영향요인에 의한 불확실성으로 인해 예측에 어려움이 있다. 이에 본 연구에서는 작업기간 산정에 영향을 미치는 다양한 요인을 고려할 수 있도록 신경망 기반 건설공사 공정별 작업기간 산정 모형을 제시하고자 한다. 본 연구에서는 정량적 및 정성적 요인을 모두 고려하여 작업기간 산정 모형을 구축하고, 사례적용을 통해 모형의 적용가능성을 검토하였다. 또한 영향요인 상관성분석을 실시하여 구축된 신경망 구조의 적합성을 판단하였다. 연구에서는 작업기간 산정 모형을 통해 합리적인 일정계획을 제공함으로써 계획공사기간과 실제공사기간의 오차율을 줄이는데 도움을 줄 수 있을 것으로 기대된다.

김중업의 「경주 석굴암 보수공사 설계」(1961-1962)에 관한 고찰 (On the Plans of Gyeongju Seokguram Grotto Restoration Project (1961-1962) by Kim Chung Up)

  • 우동선;김태형
    • 건축역사연구
    • /
    • 제30권4호
    • /
    • pp.41-52
    • /
    • 2021
  • This study examines the Gyeongju Seokguram Grotto restoration project (1961-1962) by architect Kim Chung Up (1922-1988) and introduces the documents he wrote at the time of planning. The study highlights Kim's Plan attempt to adopt Buckminster Fuller's idea of the Geodesic Dome, while inheriting the architect Pai Ki Hyung's previous design plan which was nullified. As Seokguram Grotto's water leak and deterioration issues have been brought up, the four-times survey was carried out by experts team between 1958 and 1960, under Ministry of Education's direction. Pai designed an initial restoration plan based on the survey's result, which was a double-dome structure with a concrete film on the outer periphery as a way to protect Seokguram Grotto in January 1961. However, as drawbacks, such as the heavy load of the concrete dome, and non-installation of entrance hall, have been indicated in the review process, the Cultural Properties Committee rejected the plan. Subsequently, Kim was appointed as the supervisor of the second restoration project. Kim drew up a process management schedule to be implemented from August 1961 to December 1963 and designed the conception plans for the second restoration design. This study analyzes Kim's Plan by examining sketches, site plans, floor plans, and sections. Kim planned to maintain the idea of the double-dome structure proposed by Pai while applying Buckminster Fuller's idea of the Geodesic Dome. Kim planned to lighten the dome structure by applying a steel-frame Geodesic Dome so that the dome structure could be supported by its own. The study is expected to reclaim the omitted parts from Seokguram Grotto's historical description and Kim's careers.

Operational Status of Urban Gardens to Derive Necessary Items of Public Urban Garden Management Guidelines

  • Hong, In-Kyoung;Yun, Hyung-Kwon;Jung, Young-Bin;Lee, Sang-Mi
    • 인간식물환경학회지
    • /
    • 제23권2호
    • /
    • pp.159-170
    • /
    • 2020
  • The purpose of this study was to understand the current status of education and programs and to identify the items that urban residents need most for garden management. First of all, there were 45 sites (40.5%) with gardens operated by city and county local governments nationwide, and 41(91.1%) of them had dedicated staff (1.8 persons on average). The average area of gardens was 18,623 m2, garden area per person was 20.27m2, the average number of participants was 683, and the average period of use was 8.69 months. In addition to gardening activities, 14 (31.1%) out of 45 sites were operating small group meetings, with an average of 2.29 meetings and 67 participants. In the satisfaction survey after gardening activities, 88.9% of 18 sites were satisfied. According to the questionnaire about education and programs related to garden users, an average of four sessions were conducted per education. In terms of education, the contents were in the following order: basic education on garden cultivation (33.9%) > prior education on garden operation (28.9%) > pest control (14.0%) > eco-friendly management (11.6%) > pesticides and Positive List System (9.9%) > others (1.7%). Over 95% of the respondents were generally satisfied. Regarding the perception survey on which items are needed to develop garden management guidelines, the most necessary items were in the order of crop management (38.7%) > public garden etiquettes among users (27.9%) > pest control (14.4%) > weed management (13.5%) > activities using harvest (5.4%). The contents that are to be included in the guidelines were in the order of garden planning and crop selection (17.2%) > cultivation techniques and schedule (16.5%) > pest and soil management (15.7%) > introduction of garden crops and gardening models (12.7%) > garden etiquettes (10.7%). In establishing urban garden management plans by region, the results will have high utility value as the basic data for continuous garden operation by setting a direction that meets the regional characteristics as well as the needs of urban residents.

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

다중 프로세스 서비스를 이용한 GPU 응용 동시 실행 성능 분석 (A Execution Performance Analysis of Applications using Multi-Process Service over GPU)

  • 김세진;오지선;김윤희
    • KNOM Review
    • /
    • 제22권1호
    • /
    • pp.60-67
    • /
    • 2019
  • Graphical Processing Units(GPUs)는 비교적 정형화된 연산을 병렬적으로 처리함으로써 높은 성능을 제공한다. 기술의 발전에 따라 GPU 환경에서 다양한 응용 실행을 시도하는 General Purpose GPU(GPGPU) 실행환경이 연구되고 있으나, 자원 분배, 스케줄링 등의 GPU 자원을 효율적으로 사용하기에는 아직 제한적이다. 최신의 GPU 구조들은 커널의 동시 실행을 지원하지만 같은 응용 안에서만 동시 실행이 가능하다는 문제점이 있어 NVIDIA는 Multi-Process Service(MPS)를 제안하였다. MPS는 다른 응용에 속한 커널도 동시 실행할 수 있도록 서비스한다. 하지만 응용의 실행 특성 및 동시 실행되는 패턴이 미리 파악되어 있지 않으면 MPS 장점을 최대한으로 취할 수 없다. 본 논문에서는 응용 프로파일링을 통해 응용의 특성을 파악하고, 동시 실행 스케줄링 알고리즘을 적용하여 실험을 진행하였다. MPS의 장점을 최대한으로 활용하기 위해서는 함께 돌릴 응용의 특성을 파악하고, 프로파일링을 통해 동시 실행하는 응용들의 순서를 제어하는 스케줄링 알고리즘이 중요함을 보인다.

Advanced Work Packaging (AWP) in Practice: Variables for Theory and Implementation

  • Jung, Youngsoo;Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Shin, Younghwan;Kim, Youngtae
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.201-206
    • /
    • 2020
  • Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.

  • PDF

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Impact of COVID-19 pandemic on routine immunization services in a tertiary care hospital of Rajasthan, India

  • Madhvi Dhamania;Kusum Gaur
    • Clinical and Experimental Vaccine Research
    • /
    • 제12권4호
    • /
    • pp.313-318
    • /
    • 2023
  • Purpose: Globally, 25 million children were either unvaccinated or under-vaccinated in year 2021. Among them, India had the highest number of children unvaccinated. Studies have shown impact of coronavirus disease 2019 (COVID-19) pandemic on routine health-care services. Present study aimed to estimate the impact of COVID-19 on utilization of routine immunization services during years 2020 and 2021 in tertiary-care facility. Materials and Methods: Record based descriptive analytic study was conducted at pediatric tertiary-care hospital, Jaipur. Data of children vaccinated as per the National Immunization Schedule for the period January 2019 to December 2021 were retrieved from the immunization records. Doses administered were assessed as a proxy measure of vaccine coverage. The vaccination trends of 2020 and 2021 were compared assuming base year 2019. Unpaired t-test of significance and Pearson correlation was used for correlation analysis. Results: There was significant drop in the vaccine counts after emergence of COVID-19 pandemic. In year 2020 and 2021, mean monthly vaccine count was 2,190±715.1 and 2,305±393.2, respectively, in which maximum drop was in April 2020 (-79.12%) and May 2021 (-57.16%) when it was compared with matched month of base year. There was negative correlation between percent change in vaccine count and COVID-19 cases in 2020 (r=-0.057, p=0.861) and 2021 (r=-0.827, p=0.001) as compared to year 2019. Conclusion: Study concludes that there was a significant gap in utilization of routine immunization services during the COVID-19 pandemic. This necessitates planning and management of routine immunization services in-case of future pandemics to avoid resurgence of vaccine-preventable diseases in the Rajasthan.