• Title/Summary/Keyword: schedule planning

Search Result 363, Processing Time 0.029 seconds

Efficiency Analysis on Sales Performance of NPD Projects in ICT Industry Using DEA : Focusing on Empirical Instance from 'S' corporation (자료포락분석을 이용한 ICT산업 신제품 개발 프로젝트 매출 성과에 관한 효율성 분석 : 중견기업 S사의 실례를 중심으로)

  • Jang, HeeSeok;Park, SoHyun;Kim, Seung-Chul
    • Journal of Information Technology Services
    • /
    • v.18 no.5
    • /
    • pp.209-224
    • /
    • 2019
  • When evaluating the performance of a NPD(New Product Development) project, it is common to evaluate the project performance according to the achievement of the planned goal in terms of time, quality and cost management, which are usually three main constraints of the project. The evaluation of the financial factors by which sales contributed to the return of the company is more influential. This is why companies need to increase sales and raise profits. Therefore, it is more reasonable to evaluate the sales performance of NPD projects over a certain period of time against the input costs. At this time, we can analyze the causes of inefficient projects and compare them with other projects and find out how to improve the sales performance to help the company increase its competitiveness. In this paper, we analyze the relative efficiency of the sales performance on the input of the projects by using the actual sales in the period of one year after mass production of the NPD projects of 'S' company in ICT industry. Input factors include developer resource and development cost for the NPD reported after the project has been completed, the delay weeks for the schedule targeted at the project planning stage, and the number of quality issues due to development design faults during initial mass-production. The sales figure and the contribution margin of the product after one year from the start of mass production are defined as the output factors. In this paper, we analyze the efficiency of the projects by using data envelope analysis (DEA). As a result, we found out the reason of the inefficient project of DMUs according to the differences in the characteristics of the efficient and inefficient B2B markets based on the result of DEA of NPD projects. Thus, the goal of this paper is to identify strategies for improving sales performance of NPD projects in inefficient markets.

Relationship between Depression, Stress and Obesity Indexes in Overweight and Obese Korean Women (한국 과체중 및 비만 여성에서 우울 및 스트레스와 비만지표와의 상관관계)

  • Kim, Eun-Joo;Lee, A-Ra;Hwang, Mi-Ja;Cho, Jae-Heung;Song, Mi-Yeon
    • Journal of Korean Medicine for Obesity Research
    • /
    • v.11 no.1
    • /
    • pp.15-24
    • /
    • 2011
  • Objectives Our purpose of this study was to evaluate the association between depression, stress, and obesity indexes. Methods This study was performed in 110 healthy overweight and obese(BMI${\geq}23\;kg/m^2$) women in Korea. Subjects underwent abdominal CT(computed tomography) scanning and were asked to complete Beck depression inventory(BDI), social readjustment rating scale(SRRS), and stress response inventory(SRI) questionnaires. Weight, body-mass index(BMI), waist circumference(WC), and waist-hip ratio(WHR) were evaluated. Subjects were given written consent and this study was performed under permission of institutional review board of KyunHee University Hospital at Gangdong. Results 1. BDI and SRI were significantly correlated with VFA(visceral fat area)(p<0.05). However, other obesity indexes were not significantly correlated with BDI and SRI(p>0.05). 2. SRRS was not significantly correlated with all obesity indexes(p>0.05). Conclusions This study suggests that depression and stress might be correlated with visceral fat, and this result would be helpful for planning a treatment schedule of obese patients with depression or stress in the clinic.

Barriers to participation in a worksite wellness program

  • Person, Ashley Lynne;Colby, Sarah Elizabeth;Bulova, Jessica Ann;Eubanks, Janie Whitehurst
    • Nutrition Research and Practice
    • /
    • v.4 no.2
    • /
    • pp.149-154
    • /
    • 2010
  • The purpose of this research was to determine barriers that prevent participation in an employee wellness program, Wellness Wednesdays: "Eat & Meet" About Healthy Living, conducted at East Carolina University (ECU) in Greenville, North Carolina. All ECU ARAMARK employees (n = 481) over the age of 18 were eligible to participate in the wellness program. Weekly 30 minute classes, taught by a Registered Dietitian, on various nutrition- and health-related topics were conducted for 10-weeks. Five question knowledge quizzes were administered to participants at the end of each class to determine the comprehension of material presented. Qualitative interviews (n = 19) were conducted with employees (participants and non-participants) and the program organizer after the completion of the 10-week program to identify barriers to program participation. A total of 50 (10.4% of the total number of potential participants) ECU ARAMARK employees, managers, and leadership team directors attended Wellness Wednesdays at least once during the 10-week program. Employees, on average, scored 71-100% on the weekly knowledge quizzes administered at the end of each class. The most common barriers to participation reported included (most often to least often reported): insufficient incentives, inconvenient locations, time limitations, not interested in topics presented, undefined reasons, schedule, marketing, health beliefs, and not interested in the program. Results showed that employee wellness programs can be effective in increasing knowledge of employees on nutrition- and health-related topics. However, program planning that addresses identified barriers including insufficient incentives, inconvenient locations, and time limitations may facilitate higher participation in future worksite wellness opportunities.

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

Criteria for the Float Distribution (여유시간 분배기준에 관한 연구)

  • Lee Gul-Chan;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.509-512
    • /
    • 2003
  • The Critical Path Method(CPM) is an effective tool used for planning and scheduling. One of strong point in the CPM is what can calculate float. Float is able to prolong without having an effect on overall schedule of project, however concept and scope about ownership is not definite, because it is a by-product of project. Thus participants have had many dispute in using float because of their interests. In recent years, a few theories have evolved in an attempt to solve this problem. But the prior research did not make a reasonable distribution of float because their criteria of distribution was based on ratio for total project time. Actually, an application of float is achieved by participant's delay risk. Therefore. this paper proposes criteria for float distribution using delay risks, and the framework for the assessment of the delay risks.

  • PDF

A Study on the Dynamic Export Yard Planning Considering Pattern of Coming-in Containers (반입 패턴을 고려한 동적 수출 장치장 운영 계획에 관한 연구)

  • Lee, Jong-Ho;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.337-339
    • /
    • 2007
  • The productivity of container terminal is usually regarded same as the productivity of quay crane. Operation of quay crane for the export is started from picking up a container in yard block. In doing so, smooth flow of container is vital to maximize the productivity of quay crane. Improvement of quay crane's productivity means improvement of entire productivity in container terminal, which reinforces the competitiveness of terminal consequently. Setting effective plan is essential to improve work flow from yard to quay crane. For optimal plan, it is necessary to gather information about exact time schedule of come-and-go containers for loading, amount of containers that will be come to terminal. Generally, the arrival time of containers and the amount of containers are definite and predictable. However, in the case of export container, the arrival time of containers is random and unpredictable. This study examines the pattern of coming-in containers as time goes in container yard and provides the solution to how to plan export yard considering the change of state in terminal and adapt it to container yard plan

  • PDF

Review and Suggestion for Waste Transfer Stations in Seoul (서울시 생활폐기물 적환장 운영실태 분석 및 제언)

  • Yoo, Kee-Young
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.24 no.4
    • /
    • pp.21-29
    • /
    • 2016
  • This study was conducted to review Waste Transfer Stations(WTSs) in Seoul, especially focusing on three aspects, main roles, neighbor friendly and regulation compliance, and to draw out recommendation for improvement. The 46 units of all 65 WTSs treated large amount of waste on a day shipping-out schedule, the other 19 WTSs treated small amounts of wastes which were transported after 3~30 days stock. About 57% of WTSs are located in residential or commercial area. Other 57% of WTSs were open without walls. 79% of WTSs were placed alone. Just 17% of WTSs were permitted as environmental infrastructures by urban planning law, and 31% of WTSs were operated by private waste haulers who were permitted by waste management law. Most WTSs in Seoul seemed to go well with on-going policy demand, such as regionalizing waste treatment facilities, expanding waste recycling, and so on. However lots of WTSs did not implement sufficient environmental protection measures, and partly not compliant with regulations related to urban infrastructures. In the future, the issue on sealing facilities and integrating functions of waste management facilities could be considered in order to fit in urban environment.

Development of Evaluation Modules for Evaluating Decommissioning Scenarious Using Digital Mock-Up System (디지털 목업 시스템을 이용한 해체 시나리오 평가용 해체공정 평가모듈 개발)

  • Kim Sung-Kyun;Park Hee-Sung;Lee Kune-Woo;Jung Chong-Hun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.3
    • /
    • pp.265-273
    • /
    • 2006
  • In the decommissioning and decontamination(D&D) planning stage, it is important that the scenarios are evaluated from an engineering point of views because the decommissioning work has to be executed economically and safely by following the best scenarios. Therefore, we need to develope several modules to evaluate the decommissioning scenarios. In this paper, the digital mock-up system is constructed in the virtual space to simulate the whole decommissioning process. The schedule evaluating equation and cost evaluation equation are derived to calculate the working time and the expected cost. And in order to easily identify the radiation level about the activated objects, the radiation visualization module is developed. Finally, on the basis of the obtained results from the Digital Mock-up and other important factors, the evaluating method of the scenarios that can indicate the best scenario is described.

  • PDF

A Manpower Distribution Model for Software Development Cycle (소프트웨어 개발주기 인력분포 모델)

  • 박석규;박중양;박재홍
    • Journal of the Korea Computer Industry Society
    • /
    • v.5 no.1
    • /
    • pp.9-18
    • /
    • 2004
  • Successful project planning relies on a good estimation of the manpower required to complete a project in addition to the schedule options that may be available. Existing software manpower estimation models present the total manpower and instantaneous manpower distribution for the software life cycle. Putnam's Rayleigh and Phillai et al.'s Gamma models present a model with assumption that the manpower is needed at the system delivery. This means that 40 percent of total manpower is applied at the software development, and the other 60% is applied during maintenance phase. However Warburton observes the manpower is needed during development phase with the peak at the completion of the software design phase. So, the existing models were not appropriate to be applied to practical projects. This paper suggests the Sigmoid model which does not consider the point of manpower peak to fix the problem above. The suggested model showed some improvement when practical data was applied. Therefore, the Sigmoid model can be used as alternative of Rayleigh and Gamma model to estimate distribution of manpower during software development phas.

  • PDF

Development of Integrated Computer System for Quantifying and Managing of Demolition Waste (해체폐기량 산정 및 통합관리를 위한 시스템 개발)

  • Kim, Chang-Hak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.133-140
    • /
    • 2011
  • Recently, the demolition industry is becoming more important than ever for formulating reuse and recycling of a construction waste with the current trend in pursuing a sustainable development. As considering the situation of a domestic housing construction and an existing house, a scale of a demolition market is expected to increase continually. Therefore, for a sustainable development, it is needed to forecast and manage rightly the demolition waste producted in a demolition phase. But, because most of a demolition company is very small and the investment in a technology development is not enough, the effort to develope a system and to make a standard for managing righly a demolition waste is also not sufficient. Therefore, this study develops a system to automatize quantifying a demolition waste. This system makes it possible to manage the planning of demolition works and the quantifying, disposal, reusing and recycling of a demolition waste in one system by integrating all the activities related with demolition works. 3D drawings of each element for demolition works will manage by being linked to its schedule for visualizing 3D object. Also, this study presents methods for quantifying easily a demolition waste by using 3D object.