Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

A Fuzzy Logic Based Software Development Cost Estimation Model with improved Accuracy

  • Shrabani Mallick;Dharmender Singh Kushwaha
    • International Journal of Computer Science & Network Security
    • /
    • 제24권6호
    • /
    • pp.17-22
    • /
    • 2024
  • Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.

백색 마우스의 전복부 조사량 및 회복기간에 따른 방광의 병리조직학적 고찰 (Histopathologic Change of External Abdominal Irradiation on Urinary Bladder of Mice at Total Dose and Intervals)

  • 김경애;김명세
    • Journal of Yeungnam Medical Science
    • /
    • 제6권2호
    • /
    • pp.103-111
    • /
    • 1989
  • 방사선 조사후 방광의 손상에 관한 실험에서 다음과 같은 결과를 얻었다. 1. 손상군, 회복군 모두에서 암수가 비슷한 변화를 보여 방사선에 의한 손상에서 암수의 차이는 없었다. 2. 점막의 변화는 40GY 조사군에서 50GY군 보다 빨리 회복됨이 관찰되었고 14주에서 대부분 소실되었다. 3. 혈관의 변화는 40GY, 50GY 모두에서 혈관확장증, 초자질화, 내피하층과 중간층의 섬유화 등이 관찰되었으며 혈관주변의 섬유화는 15주까지 관찰되었다. 결체조직과 균육층의 변화는 40GY, 50GY 모두에서 조사후 15주까지 지속됨을 볼 수 있었다. 마우스의 평균수명(460일-1000일)에 비해 본 연구의 추적 기간이 105일로서 충분히 길다고는 할 수 없으나 상기 여러 결과로 미루어 후기 반응의 감소 및 예방을 위해 세심한 조사 계획이 있어야 함을 시사하였다.

  • PDF

위성 우주인증 테일러링을 위한 해외 시험표준서 분석 (Test Standards Analyses for Tailoring of Satellite Space Qualification)

  • 송수아;장영근
    • 항공우주시스템공학회지
    • /
    • 제12권4호
    • /
    • pp.35-48
    • /
    • 2018
  • 일반적으로 우주인증은 높은 수준의 스크리닝을 수행하여 소자, 재료 및 제작공정, 부품, 서브시스템 또는 시스템 설계에 대한 마진을 확인한다. 기존의 미국 군, 미 항공우주국(NASA) 그리고 유럽우주기구(ESA) 시험표준서의 우주인증은 보수적 요구조건에 기인해 일정과 비용 측면에서 과도한 경우가 많다. 따라서 국내위성 개발을 위해 독자적인 비용 및 일정 최적화된 우주인증지침서가 필요하다. 본 논문에서는 이러한 우주인증 가이드라인 개발을 위한 기초 연구로서 해외 군 및 우주기구 시험표준서의 우주인증 항목을 비교 분석하였다. 이를 통해 테일러링(tailoring)된 독자적 우주인증 가이드라인을 구축하기 위한 데이터베이스로 사용하고자 한다.

소프트웨어 개발 세부단계 노력 추정 모델 (A Model for Software Effort Estimation in the Development Subcycles)

  • 박석규;박영목;박재흥
    • 한국컴퓨터산업학회논문지
    • /
    • 제2권6호
    • /
    • pp.859-866
    • /
    • 2001
  • 성공적인 프로젝트 계획은 활용 가능한 일정과 더불어 프로젝트를 완수하는데 요구되는 노력을 얼마나 정확히 추정하느냐에 달려있다. 새로운 또는 보다 나은 모델 개발에 많은 연구가 이루어졌지만 현존하는 소프트웨어 노력 추정 모델들은 개발 전순기에 대해 투입되는 총 개발노력과 단위시간당 소요되는 인력인 노력 함수만을 제공한다. 또한, Putnam은 세부단계별로 일정한 개발노력 투입 비율을 제시하였다. 그러나 소프트웨어의 규모, 복잡도와 운영환경의 영향으로 인해 프로젝트 별로 투입되는 총 개발노력의 규모에 차이가 발생하며, 그 결과, 개발 세부단계별로 투입되는 노력의 규모도 프로젝트마다 차이가 발생한다. 본 논문은 총 개발노력 변동에 따른 소프트웨어의 명세화, 구축과 시험단계에 투입될 개발노력을 추정하는 선형과 다항식 모델을 제시하였다. 이 모델들은 128개의 다른 소프트웨어 프로젝트들로부터 유도되었다. 제안된 모델은 프로젝트의 일정과 노력 할당 관리에 실질적인 지침을 제공할 것이다.

  • PDF

초고층 프로젝트 양중 계획의 실패 유형별 핵심 리스크 요인 분석 (An Analysis of The Critical Risk Factors in Failure Cases of Lifting Equipment Plans in High-rise Construction Project)

  • 김남균;김예상
    • 한국건설관리학회논문집
    • /
    • 제14권4호
    • /
    • pp.73-83
    • /
    • 2013
  • 최근 국내 외 대도시를 중심으로, 글로벌 경제 위기와 부동산 경기 침체로 중단되거나 연기되었던 초고층 프로젝트들이 재개되고 있으며, 이를 수주하기 위한 건설사들의 경쟁은 전보다 더욱 치열해지고 있다. 국내 건설사들이 초고층 건축 분야에서 경쟁력을 높이기 위해서는, 전체 프로젝트의 근간이 되는 중요한 요소인 양중계획의 체계적인 리스크 관리가 반드시 수반되어야 하지만, 여전히 개인적 경험에 의존하여 작성 된, 양중계획의 오류로 인한, 현장 전체의 공기 지연 및 원가 관리 실패의 문제가 빈번하게 발생하고 있다. 따라서 본 연구에서는, 양중계획의 정확성을 높이기 위한 방안으로, 현행 양중계획 체계의 문제점을 분석하고, 계획 요소에 따라 실패 유형을 도출하였으며, 각 실패 유형이 전체 프로젝트의 공정, 원가, 안전관리에 미치는 영향도를 분석하였다. 또한 양중 장비별 세부 리스크 요인을 분석하고, 이를 바탕으로 FMEA 기법을 적용하여 초고층 프로젝트 양중계획의 핵심 리스크 요인을 도출하였다.

다수의 인공위성-지상국 간 통신 스케줄 최적화 모형 (A Mathematical Model for Optimal Communication Scheduling between Multiple Satellites and Multiple Ground Stations)

  • 정유진;김흥섭
    • 산업경영시스템학회지
    • /
    • 제41권1호
    • /
    • pp.39-49
    • /
    • 2018
  • In the satellite operation phase, a ground station should continuously monitor the status of the satellite and sends out a tasking order, and a satellite should transmit data acquired in the space to the Earth. Therefore, the communication between the satellites and the ground stations is essential. However, a satellite and a ground station located in a specific region on Earth can be connected for a limited time because the satellite is continuously orbiting the Earth, and the communication between satellites and ground stations is only possible on a one-to-one basis. That is, one satellite can not communicate with plural ground stations, and one ground station can communicate with plural satellites concurrently. For such reasons, the efficiency of the communication schedule directly affects the utilization of the satellites. Thus, in this research, considering aforementioned unique situations of spacial communication, the mixed integer programming (MIP) model for the optimal communication planning between multiple satellites and multiple ground stations (MS-MG) is proposed. Furthermore, some numerical experiments are performed to verify and validate the mathematical model. The practical example for them is constructed based on the information of existing satellites and ground stations. The communicable time slots between them were obtained by STK (System Tool Kit), which is a well known professional software for space flight simulation. In the MIP model for the MS-MG problems, the objective function is also considered the minimization of communication cost, and ILOG CPLEX software searches the optimal schedule. Furthermore, it is confirmed that this study can be applied to the location selection of the ground stations.

작업성취율 활용을 위한 공정관리체계 (Construction Progress Management System for PPC Implementation)

  • 임철우;유정호;김창덕
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.57-65
    • /
    • 2007
  • 작업성취율(Percent of Plan Completed: PPC) 도입을 통한 효과는 선진 건설 사례들을 통해 검증되고 있으나, 우리 건설현업에서는 이에 대한 적용사례가 없다 본 연구는 외국에서 작업성취율을 적용한 사례를 분석하고 이를 우리 건설현업에서의 공정관리체계와 비교함으로써 작업성취율 활용을 위한 공정관리체계를 제시하는 것을 목표로 하였다. 외국 사례와 국내 공정관리체계를 비교함에 있어 3주 미래 작업계획단계의 예비작업목록 작성과 제반요건분석, 1주 작업 단계의 실패원인 분석과 작업성취율 측정 등의 관리 도구를 선정하였고 이틀을 대상으로 LPS(Last Planner System)와 국내의 공정관리현황을 비교 분석함으로써 차이점을 분석하고 작업성취율 활용을 위한 추가 공정관리절차출 제시하였다. 또한, 국내 건설 전문가들에게 설문 및 면담을 통해 본 연구에서 제시한 공정관리체계의 현장 적용성 검토를 실시하였다.

혼합정수 프로그래밍 기법을 이용한 진보된 Time-Cost Trade-Off Model (Advanced Time-Cost Trade-Off Model using Mixed Integer Programming)

  • 권오빈;이승현;손재호
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.53-62
    • /
    • 2015
  • 공기비용 트레이드오프 모델은 건설프로젝트의 계획 및 관리에 있어 매우 중요하다. TCTO 모델은 연속모델과 분절모델 두 가지 모델이 개발되어왔다. 그러나 한 종류의 모델만을 사용하여 현실적인 공기단축 시나리오를 적용하기에는 한계가 있다. 이에 TCTO 의 연속적인 모델과, 분절모델을 결합하여 진보된 모델을 제시하였으며 또한, 비선형 관계, 인센티브 및 지체보상금 고려가 가능하도록 TCTO모델에 포함되어 있다. 이런 특성들은 건설프로젝트에 적용가능하다. 6개의 activities로 구성된 CPM 네트워크는 연구에서 제안된 모델을 설명하기 위해 사용되었다. 제시한 모델은 모든 제약 조건을 만족시키는 최적 스케쥴 계산이 가능하다. 결과적으로 본 연구에서 제시한 진보된 TCTO모델은 기존의 모델보다 최적화된 공기단축이 가능하다.

Needle Stick Injuries and their Related Safety Measures among Nurses in a University Hospital, Shiraz, Iran

  • Jahangiri, Mehdi;Rostamabadi, Akbar;Hoboubi, Naser;Tadayon, Neda;Soleimani, Ali
    • Safety and Health at Work
    • /
    • 제7권1호
    • /
    • pp.72-77
    • /
    • 2016
  • Background: This study aimed to determine the prevalence and factors related to needle stick injuries (NSIs) and to assess related safety measures among a sample of Iranian nurses. Methods: In this cross-sectional study, a random sample of 168 registered active nurses was selected from different wards of one of the hospitals of Shiraz University of Medical Sciences (SUMS). Data were collected by an anonymous questionnaire and a checklist based observational method among the 168 registered active nurses. Results: The prevalence of NSIs in the total of work experience and the last year was 76% and 54%, respectively. Hollow-bore needles were the most common devices involved in the injuries (85.5%). The majority of NSIs occurred in the morning shift (57.8%) and the most common activity leading to NSIs was recapping needles (41.4%). The rate of underreporting NSIs was 60.2% and the major reasons for not reporting the NSIs were heavy clinical schedule (46.7%) and perception of low risk of infection (37.7%). A statistically significant relationship was found between the occurrence of NSIs and sex, hours worked/week, and frequency of shifts/month. Conclusion: The study showed a high prevalence of NSIs among nurses. Supportive measures such as improving injection practices, modification of working schedule, planning training programs targeted at using personal protective equipment, and providing an adequate number of safety facilities such as puncture resistant disposal containers and engineered safe devices are essential for the effective prevention of NSI incidents among the studied nurses.